So, meeting for Tuesday, September 10th, or September 15th, 2026,

00:04.560 --> 00:09.520
please join with me in a moment. We have roll call. Mr. Gasper is absent and

00:09.520 --> 00:12.560
excused. Otherwise, all other older persons are

00:12.560 --> 00:16.560
present. Please join with me for the Pledge of Allegiance.

00:18.480 --> 00:22.800
I pledge allegiance to the flag of the United States of America

00:22.800 --> 00:27.360
and to the Republic for which it stands, one nation under God

00:27.360 --> 00:32.080
indivisible with liberty and justice for all.

00:32.880 --> 00:35.920
Thank you. That brings us into our agenda for this evening, which is our first

00:35.920 --> 00:38.960
agenda item is public comments and appearances. Remember that you have the

00:38.960 --> 00:42.080
opportunity to speak for up to three minutes for a maximum of 30 minutes

00:42.080 --> 00:46.160
tonight. Please remember to state your name and address.

00:46.160 --> 00:50.720
Okay. Tracy Finch, West Parkview Drive, Port Washington, Wisconsin.

00:50.720 --> 00:54.320
I've spoken at nearly every council meeting about issues affecting our

00:54.320 --> 00:57.840
community this past year. Recently, I focused on mental health,

00:57.840 --> 01:01.280
not as an abstract topic, but because residents in Port Washington have been

01:01.280 --> 01:04.560
dealing with stress, anxiety, and sleep disruption tied directly to the

01:04.560 --> 01:08.480
vantage data center construction. I've emailed the mayor asking for

01:08.480 --> 01:12.800
acknowledgement of these impacts and for the cities provide

01:12.800 --> 01:17.040
free mental health support to affected residents. I ask for leadership or even

01:17.040 --> 01:20.400
just a basic response, but there has been no reply, no public

01:20.480 --> 01:24.880
acknowledgement, and no visible steps taken to help the people who are still

01:24.880 --> 01:27.120
dealing with the consequences of this project.

01:27.120 --> 01:33.120
And that's silent matters because Mayor Nitsky is also the CEO of CESA 6,

01:33.120 --> 01:37.600
an organization that teaches leaders to listen, respond, and support people who

01:37.600 --> 01:41.760
are struggling. This organization emphasizes rapid feedback, strong

01:41.760 --> 01:45.840
community connection, and creating safe, thriving environments.

01:45.920 --> 01:49.360
These are leadership values he promotes professionally.

01:49.360 --> 01:53.280
Yet here in Port Washington, residents who have been struggling for months

01:53.280 --> 01:58.400
have received none of that leadership. Then based on what was discussed at

01:58.400 --> 02:02.160
the August Public Works Meeting, it appears the city has essentially tied

02:02.160 --> 02:06.000
its own hands while giving vantage free reign to do as they please

02:06.000 --> 02:09.200
because if the city disagrees, vantage threatens to sue.

02:09.200 --> 02:13.040
A clear example of is the well usage issue.

02:13.040 --> 02:17.360
So the city's own fact sheet Q&A is effectively meaningless,

02:17.360 --> 02:21.520
and because of that, residents are left wondering, and in some cases, believing

02:21.520 --> 02:25.120
that people may already be living in trailer city, regardless of whether

02:25.120 --> 02:30.080
that city claims it's true or false. Mayor Nitsky, you have failed as a leader,

02:30.080 --> 02:34.080
and you need to own up to this massive disaster you brought to Port Washington,

02:34.080 --> 02:38.080
both the city and the town. What's worse is that you have convinced some

02:38.080 --> 02:42.400
residents to turn against other residents simply because those residents

02:42.400 --> 02:45.680
have raised legitimate concerns about this project

02:45.680 --> 02:49.120
has been handled and the impact is on the environment.

02:49.120 --> 02:53.920
I'm asking again, publicly and on the record, Mayor Nitsky, will you

02:53.920 --> 02:58.000
acknowledge the mental health impact of vantage data center construction,

02:58.000 --> 03:01.280
and will you take the steps to provide free mental health support to the

03:01.280 --> 03:05.920
residents who were affected? You need to own the mistake you made.

03:05.920 --> 03:10.160
The storm you created in Port Washington, silence is not leadership.

03:10.160 --> 03:13.840
Residents deserve better because I got a reply back from Bantish

03:13.840 --> 03:16.800
that they are not going to do anything to help the residents

03:16.800 --> 03:21.200
of Port Washington for their mental health.

03:28.080 --> 03:31.120
Are there public speakers?

03:31.920 --> 03:37.680
Please state your name and address.

03:38.960 --> 03:44.240
Good evening. My name is Catherine Gardner. I live at 3689 East North Port

03:44.240 --> 03:48.240
Drive in the town of Port Washington. My comments are related to the

03:48.240 --> 03:53.200
vantage well permit application. I am concerned that vantage's use of

03:53.200 --> 03:58.080
groundwater will damage the water supply. My town neighbors and I depend on.

03:58.640 --> 04:03.840
It's not the 12,000 gallons per day vantage says it plans to use

04:03.840 --> 04:08.560
that is concerning. What is concerning is vantage's consistent pattern of

04:08.560 --> 04:12.800
stretching the limits. Throughout this discussion on well usage,

04:12.800 --> 04:17.600
we hear much the same language as we've heard in the past referring to plans and

04:17.600 --> 04:22.800
intentions not to commitments. So I remain concerned that their actual

04:22.800 --> 04:25.360
groundwater use will grow much higher over time.

04:26.320 --> 04:30.480
Based on the discussion at the August Board of Public Works meeting,

04:30.480 --> 04:33.600
it appears the city is relatively powerless to control

04:33.600 --> 04:38.720
vantage's groundwater use. However, to the extent possible,

04:39.280 --> 04:45.600
I urge you to require vantage to report its water usage to you monthly,

04:46.320 --> 04:51.680
to make this information publicly available, to ensure vantage caps these

04:51.680 --> 04:56.080
wells immediately upon availability of city water to its property,

04:56.800 --> 05:01.440
to define meaningful penalties for violation, and to hold firm when

05:01.440 --> 05:07.520
vantage comes back to you for more. Your decision tonight on the well permit

05:07.520 --> 05:12.080
may have negative consequences only for the town residents who depend on

05:12.080 --> 05:16.960
their wells for safe water. Please be a good neighbor to these town residents

05:16.960 --> 05:21.280
who shop at your stores and support your civic events. They are not just

05:21.280 --> 05:26.880
suffering the inconveniences of construction. Town residents who live close

05:26.880 --> 05:30.400
to the data center have had their lives and their properties

05:30.400 --> 05:35.280
permanently damaged by your decisions and disproportionately bear the negative

05:35.280 --> 05:39.680
consequences of this city business. Please don't pile more on.

05:40.640 --> 05:44.480
I also think this is an opportunity to show your constituents

05:44.480 --> 05:48.400
that you have the interest in and the ability to hold

05:48.400 --> 05:55.520
vantage accountable to reasonable standards. Public trust in AI and data centers is low.

05:56.480 --> 06:01.760
You brought this monster project into our community. Please demonstrate you have the

06:01.760 --> 06:08.400
ability to protect the public from its negative consequences. Making even a minor

06:08.400 --> 06:13.920
effort to control vantage's groundwater use would be a small step in the right direction.

06:14.640 --> 06:15.920
Thank you.

06:23.920 --> 06:25.360
Next speaker to name and address.

06:25.360 --> 06:45.760
Hi there. My name is Julianne Wanderer and you may remember having me arrested in December.

06:48.960 --> 06:52.880
As well as two others. I'm sorry Julie. Can you please also state your address for us?

06:52.880 --> 07:00.080
405 South Co Avenue in Port Washington, Wisconsin.

07:01.760 --> 07:05.440
You want to silence your critics but we will not be silenced.

07:06.320 --> 07:12.560
I think we are all familiar with the proverb with great power comes great responsibility.

07:13.120 --> 07:20.000
Each and every single one of you has the power to protect the waters of Lake Michigan.

07:20.720 --> 07:26.160
Each and every one of you has the power to protect our natural resources.

07:26.880 --> 07:33.280
Each and every one of you has the power to protect the health and the well-being of your

07:33.280 --> 07:42.320
constituents. Instead of exercising that power and your moral obligations therein.

07:43.280 --> 07:47.920
You allowed yourself to be swindled by multi-billion dollar companies.

07:48.480 --> 07:54.320
You handed our natural resources to these companies on a silver platter.

07:56.320 --> 08:01.120
Companies according to the experts who are operating at a financial loss.

08:01.680 --> 08:05.280
These companies are not even financially profitable.

08:06.080 --> 08:15.680
Throughout this process we have been lied to, kept in the dark and made to feel that our very

08:15.680 --> 08:20.080
real and valid concerns do not matter to any of you.

08:22.000 --> 08:26.160
Do you know and are you familiar with a thought experiment?

08:27.600 --> 08:35.120
Here's one for you. If a data center is a once in a lifetime opportunity and a boom for the

08:35.120 --> 08:39.680
economy, why isn't there a data center being planned in Door County?

08:42.240 --> 08:46.800
Maybe because the county officials place a higher value on their natural resources.

08:47.360 --> 08:54.160
Maybe because they know and recognize the countless inherent dangers associated with data centers.

08:55.120 --> 09:00.000
They understand the dangers that the data centers present to their natural resources

09:00.080 --> 09:05.920
and to their constituents. Maybe because they refuse to sell out to predatory companies.

09:06.480 --> 09:12.240
Maybe because they have common sense and they recognize that a data center isn't in their best

09:12.240 --> 09:15.760
interest. Maybe because they weren't blinded by greed.

09:17.120 --> 09:22.000
This city has become a laughing stock to anyone and everyone who's paying attention.

09:22.000 --> 09:26.640
They see the truth for what it is. Data centers are not good for the community,

09:26.640 --> 09:37.840
not good for the environment. These companies are grifters and you guys swindled. Shame on you.

09:45.680 --> 09:51.200
Hello, my name is Dean Wiegert. My address is 3708 East Northport Drive in the town of Port.

09:52.160 --> 09:57.120
I read the agenda item memorandum from the city engineer on issuing permits for

09:57.120 --> 10:04.960
vantage for the use of the wells and I was happy to see that the recommended motion to

10:04.960 --> 10:12.160
quote report monthly usage to the city. I do however think that the motion should have included

10:12.160 --> 10:19.440
the words on a monthly basis. This would clarify that the monthly usage will be reported each

10:19.520 --> 10:25.840
month instead of annually as the DNR permit stipulates. If we wait an entire year to find

10:25.840 --> 10:31.680
out what the monthly usage was, any infraction and monthly allowed usage won't be identified

10:31.680 --> 10:38.240
until the end of the year. Catching problems early can prevent more problems. I also would

10:38.240 --> 10:44.240
have hoped for a motion that included some language of inspection or verification by the city

10:44.240 --> 10:50.640
of the numbers reported. Unfortunately, I don't trust vantage to police themselves.

10:52.080 --> 10:56.880
And then finally, I would have hoped for a motion that would include language of penalties

10:56.880 --> 11:03.920
or consequences if water usage exceeds what has been approved. I'm not a city council member.

11:03.920 --> 11:08.720
I'm not even a city resident. I have no way of making these motions or suggesting it to my

11:08.720 --> 11:13.680
older person. And that I feel is one of the biggest problems with this data center project,

11:14.400 --> 11:20.400
the city annexed town land. And so now it is the town residents who are affected most but have

11:20.400 --> 11:26.720
no representation. Interesting fact, I was here on the night in December last year when several

11:26.720 --> 11:31.840
people were arrested. And earlier that night, we were lined up in front of the chamber doors

11:31.840 --> 11:37.520
waiting to get in when one of the police officers standing by the doors was asking us why are you

11:37.600 --> 11:42.320
still here? Why do you keep coming back? This is a done deal. We're tired of having to be here

11:42.320 --> 11:48.480
and we're tired of all the overtime. This is true. Someone spoke up and said that they were there

11:48.480 --> 11:53.600
because the people in the town had no say but are being impacted and feeling the worst effects

11:53.600 --> 11:59.200
of the start of construction. The police officer's response was, well, why don't they show up?

12:00.160 --> 12:05.920
Well, of course I had, though he didn't know me. And it convinced me that I needed to continue.

12:06.880 --> 12:13.200
So you can thank that police officer in part for my presence tonight. Thank you.

12:18.640 --> 12:19.600
Other public speakers?

12:25.200 --> 12:31.440
My name is Sebastian Elicher. I live in Ward 1, 136 East Cleveland Street here in Port.

12:32.240 --> 12:39.440
I want to start by confirming what Dean said a few minutes ago, what happened in December before

12:40.320 --> 12:47.920
three women were arrested, not to say brutalized in these chambers. I stood outside and I heard

12:47.920 --> 12:54.080
the conversation. So the first thing I want to say is it's true what Dean just said here.

12:54.800 --> 13:04.320
This did happen. There was aggressive talking by representatives of the police force towards

13:04.320 --> 13:12.800
citizens lining up. But I want to speak here with regard to TIT Project 5, which is on the agenda

13:12.800 --> 13:18.480
for tonight. We are slowly but steadily approaching property tax season.

13:18.480 --> 13:26.800
Excuse me, Sebastian. That is the tornado whistle.

13:30.560 --> 13:33.920
It just turned off. I apologize, Sebastian. I just want to make sure we didn't have to evacuate.

13:33.920 --> 13:38.880
No, that's okay. Go ahead. That's okay. I will allow his time. Thank you.

13:40.880 --> 13:47.040
So my first, my other common concerns, TIT Project 5, we are slowly approaching property

13:47.040 --> 13:55.200
tax, property tax season. And I think this is the first year where the city theoretically has

13:55.200 --> 14:02.880
the option of increasing its levy. So citizens would like to know what your plans are with regard to

14:02.880 --> 14:10.240
that. Especially since looking through the package for today, there is a very prominent project here,

14:10.320 --> 14:16.720
which is the Valley Creek restoration project. Alderman Gasper, who unfortunately cannot make it

14:16.720 --> 14:23.280
today, has been the leading figure behind that. And I think it's a great project. But there is a

14:23.280 --> 14:30.480
$10 million shortfall for this project. Vantage is paying us something to the extent of $2 to $3

14:30.480 --> 14:39.920
million. But the overall projects are $13 to $40 million. It's being stated in these chambers that

14:40.400 --> 14:46.720
the city will apply to federal programs. Those federal programs no longer exist.

14:47.840 --> 14:54.800
So my question is, how are you going to close that $10 million project? And do you anticipate

14:54.800 --> 15:03.440
raising the levy over having the Creek restored? My final point here is, as we are approaching

15:03.440 --> 15:12.880
the end of the first year of tit 5, are citizens going to see an overview of money that has been

15:12.880 --> 15:20.080
invested in infrastructure? In other words, how much money is left from the, I believe, $170

15:20.080 --> 15:28.480
million that Vantage invests in infrastructure here? When will that overview being shown to citizens?

15:29.120 --> 15:34.640
I imagine this should be at some point toward the end of the financial year. Thanks.

15:40.400 --> 15:41.280
Other public speakers?

15:48.320 --> 15:51.840
Kim Tydrick, 4465 Wildersway, town of Port Washington.

15:53.840 --> 15:58.000
I want to reiterate what some of these other people said. We don't want to keep coming back.

15:58.720 --> 16:03.120
But we have to, because you're not listening. You're not doing anything.

16:03.920 --> 16:12.960
I live in what is being called in Pennsylvania, a sacrifice zone. That is, the people that live

16:12.960 --> 16:20.720
around this data center that are making all the sacrifices. And guess what? Because we're in the

16:20.720 --> 16:28.880
town, we will see none of the benefits. None. There is nothing that I will receive from this

16:28.880 --> 16:36.800
that is benefiting me on any level. Okay? So we suffer every day with construction noise,

16:36.800 --> 16:44.960
construction traffic, the dirt, the fear of what's to come with the fact that there's still no

16:44.960 --> 16:51.440
electricity there and they don't have enough to power their almighty AI. So what's going to

16:51.440 --> 16:57.920
happen? Are they going to be allowed, as our almighty president says, to just run their generators

16:57.920 --> 17:06.400
24 seven and spew those micro chemicals and everything else into our air? And guess what?

17:06.400 --> 17:11.760
That's when the town or the city residents will start to be affected because those generators

17:11.840 --> 17:18.560
and that those micro, whatever that they're spewing into the air from those diesel generators

17:18.560 --> 17:26.560
are going to blanket the city. So then your constituents will really start to see what the

17:26.560 --> 17:32.560
rest of us have lived through because they are still now running generators for lights all night

17:32.560 --> 17:39.360
long. They idle trucks all the time. So that diesel is just polluting everything.

17:40.320 --> 17:47.600
And we live in what is already a very strange microclimate because of the way that the lake

17:47.600 --> 17:56.240
curves around here. Our air is already in a non-attainment zone. We will never be free of the

17:56.800 --> 18:05.120
cancer causing chemicals in the air, according to the DEA. And yet none of you seem to care that

18:06.080 --> 18:10.560
it's going to get worse. And what are we going to do? Little kids with asthma,

18:10.560 --> 18:19.200
seniors with heart conditions, who is protecting them? That's supposed to be your job. You chose

18:19.200 --> 18:27.040
to be on the board. You ran for elected office and you are all failing at that job.

18:28.480 --> 18:33.280
Failing because you are not protecting the citizens and the environment.

18:34.240 --> 18:39.440
So once again, those in the sacrifice zone, who by the way, it took my husband more than 20

18:39.440 --> 18:45.520
minutes to get on to 43 the other day. It used to take him that long to get to Brown Deer.

18:47.280 --> 18:53.920
So all your infrastructure improvements were too little, too late, and thank you.

18:53.920 --> 19:02.960
Thank you. Any other public speakers?

19:14.880 --> 19:17.920
Amber Chain, 1446, my second half. Thank you.

19:18.960 --> 19:23.680
As I stand behind this podium today, I wonder who in this room with authority and power

19:23.680 --> 19:28.960
actually cares about the impact we leave behind. The members of the City Council have expressed

19:28.960 --> 19:33.760
they believe this data center is a positive progress for this town. As a representative of

19:33.760 --> 19:38.960
the highest good, I do not agree. The council member state to the public that this data center

19:38.960 --> 19:44.160
will not be using lake water. However, while the water may not be directly pulled from the lake,

19:44.160 --> 19:49.200
if it is using ports water, it is lake water, because our water comes from Lake Michigan.

19:49.920 --> 19:54.800
As much as I would love to place entire blame on City Council, I know that is not true.

19:54.800 --> 19:58.880
Of the few meetings I have attended thus far, less than 20 people from the public have been in

19:58.880 --> 20:04.320
attendance, obviously not the case today. In a perfect world, the people who were voted into

20:04.320 --> 20:08.160
their positions would absolutely take into consideration the people that they are meant to

20:08.160 --> 20:13.440
represent. But as we know, we do not live in a perfect world. Therefore, it is imperative that

20:13.440 --> 20:18.080
the public hold the representatives accountable, especially when it comes to fighting for the

20:18.160 --> 20:23.680
rights of the environment. Lake Michigan does not have the opportunity to express its opposition

20:23.680 --> 20:29.040
to a data center being built five miles from its shoreline. It needs humans to speak on behalf of

20:29.040 --> 20:34.800
it. This council keeps referencing the economic growth that will take place. I am here to remind

20:34.800 --> 20:39.760
you, you cannot eat or drink money. And no matter how much you accumulate in this lifetime, it does

20:39.760 --> 20:45.440
not follow you into the next. As we are aware, water, air, the other creatures that inhabit this

20:45.520 --> 20:50.320
planet and the land itself are incapable of verbalizing its consent or dissent towards the

20:50.320 --> 20:55.760
policies humans enact. And hopefully, we are all aware that the policies humans enact either

20:55.760 --> 21:02.160
directly or indirectly affect all entities of existence. The silver lining is manmade policies

21:02.160 --> 21:08.400
in contracts is the silver lining and manmade policies in contracts is if man constructed it,

21:08.400 --> 21:14.320
man can also deconstruct it. It is never too late to do the right thing. God, Allah, Buddha, the

21:15.280 --> 21:20.480
the highest good whomever you go by is demanding you do the right by all creatures of existence

21:20.480 --> 21:23.200
and not just those who line your bank accounts. Thank you.

21:29.440 --> 21:35.440
Any other public speakers? Okay, we're going to move into the agenda then. The first agenda item

21:35.440 --> 21:39.520
is the consent agenda. Is there anyone willing to make a motion to approve the consent agenda?

21:39.520 --> 21:43.600
So moved. Moved and seconded. Any questions or concerns on the agenda item?

21:44.320 --> 21:48.240
All right, seeing none, all in favor signify by saying aye. Aye. Opposed? All right, that

21:48.240 --> 21:53.120
motion carries. It brings us into Mayors business. Today, I just wanted to thank the Wisconsin

21:53.120 --> 21:58.160
Historical Society for coming to the city of Port Washington today. They came and presented

21:58.160 --> 22:03.120
us with the 2026 Board of Curators Historic Preservation Award for the Port Washington

22:03.120 --> 22:09.920
North Breakwater Lighthouse Restoration Project. And the chair and CEO of the company came or of

22:09.920 --> 22:14.720
the Wisconsin Historical Society dropped off a letter and it's just a great congratulations

22:14.720 --> 22:20.080
to the city. Rob, I wanted to thank you for writing the grants and following through on that

22:20.080 --> 22:27.840
council for supporting that vision and city staff for ensuring that we finally brought our lighthouse

22:27.840 --> 22:31.760
or light pair up to speed. So I'm very grateful for that. Two million dollars came from the state

22:31.760 --> 22:35.200
and the federal government as a result of that hard work. So Rob, I really, really appreciate

22:35.200 --> 22:40.080
that as the city and we will hang this in place of honor. So congratulations to everybody for that

22:40.080 --> 22:45.360
happening. Also, this is the National Hispanic Heritage Month and I have a proclamation to

22:45.360 --> 22:48.880
recognize as such that will be sent to the schools and all of our public buildings.

22:50.880 --> 22:59.680
This month, National Hispanic Heritage Week was put in place by Lyndon Johnson, President

22:59.680 --> 23:04.640
Lyndon Johnson in 1968. And we have honored this for years in the city of Port Washington and we

23:04.640 --> 23:10.240
will send this proclamation to those in the city of Port Washington for it to be displayed in order

23:10.240 --> 23:15.040
for people to recognize the great contributions of the Hispanic and Latino Americans in both the

23:15.040 --> 23:19.680
city of Port Washington, Wisconsin and the United States. And we thank them for their contributions

23:19.680 --> 23:24.400
to our local culture. The second one is Diana, you want to pop up there? Well,

23:25.200 --> 23:32.880
one of my favorite visits every six weeks, eight weeks is to the Port Washington Senior Center.

23:32.880 --> 23:39.680
And this month is the Senior Center Month. We celebrate this in the month of September and it is a time

23:39.680 --> 23:44.480
to shine a light on our senior citizens showing the entire nation how vital they are to the health

23:44.480 --> 23:50.080
and well-being of our community. They offer a place for adults, older adults, to discover their

23:50.080 --> 23:54.240
unique interests, talents, and aspirations. Therefore, the national theme this year is

23:54.240 --> 23:59.120
powering connections. And whereas older Americans are significant members of our society,

23:59.120 --> 24:03.040
investing their wisdom and experience to help enrich and better the lives of younger generations,

24:03.040 --> 24:08.000
and whereas the Port Washington Senior Center has acted as a catalyst for mobilizing creativity,

24:08.000 --> 24:12.480
energy, vitality, and commitment of our older residents of Port Washington, Ozaki County,

24:12.480 --> 24:18.320
and Wisconsin. And whereas through a variety of services, programs, and activities with over 13,000

24:18.400 --> 24:24.880
and 66 visits last year, seniors have been empowered in our community to continue to contribute to

24:24.880 --> 24:28.800
all of the different ways that they can grow themselves with their own health, well-being,

24:28.800 --> 24:33.360
and the well-being of each other and fellow citizens of all ages. And whereas the City of

24:33.360 --> 24:38.080
Port Washington Senior Center affirms the dignity, self-worth, and independence of older persons by

24:38.080 --> 24:43.360
facilitating their decisions and actions, tapping into their experiences, skills, and knowledge,

24:43.360 --> 24:48.080
and enabling their continued contributions to the community. Now, therefore, I,

24:48.080 --> 24:53.520
Theodore Nitsky, Mayor of Port Washington hereby proclaim September 2026's Senior Center Month,

24:53.520 --> 24:57.840
and call upon all seniors and citizens to recognize the special contributions

24:57.840 --> 25:03.520
of both the Senior Center and our seniors in an effort to make Port Washington a better place,

25:03.520 --> 25:08.160
especially after last year with over 3,000 volunteer hours from our Senior Center.

25:08.800 --> 25:12.320
Thank you, Diana, for your leadership at the Senior Center and all seniors, and thank you

25:12.320 --> 25:17.600
for making it a vibrant place and bringing the Senior Center into the 21st century with great

25:17.600 --> 25:24.480
programming. Thank you. Thank you. So I know that you have a full agenda tonight, so I'll make it

25:24.480 --> 25:33.920
brief here. I just wanted to take an opportunity and summarize our 2025 charter goals and the outcomes.

25:35.200 --> 25:41.040
The Commission on Aging consists of seven members appointed by the Mayor and myself as the liaison.

25:41.680 --> 25:46.960
Alderman Pastel has served as the chairperson for the past year and done a fabulous job in

25:47.920 --> 25:55.440
in helping us to move the mission forward. One of the goals that we worked on is to increase

25:55.440 --> 26:02.400
class programming, especially events, by offering 14 or by adding 14 new offerings.

26:03.280 --> 26:11.840
We successfully met that goal by actually adding 23. Just to highlight a few that stood out

26:12.400 --> 26:19.040
kind of when I looked at the list, offering memory screenings in partnering with the

26:19.040 --> 26:25.120
Aging and Disability Resource Center. The dementia specialists, they're conducted those memory

26:25.200 --> 26:36.560
screenings and that is invaluable to folks to have early detection of dementia and downsizing

26:36.560 --> 26:43.920
decluttering. We know as seniors that becomes a challenge sometimes as we're moving into

26:45.120 --> 26:50.880
different living environments to know what to do with everything. So having a speaker on that

26:50.880 --> 26:59.040
was excellent. We were part of the community mural project and that was a really awesome

26:59.040 --> 27:06.160
partnership where folks who took part were able to do so indoors in a controlled environment

27:06.880 --> 27:12.320
and now are able to be part of Port Washington history as they drive through they can see a

27:12.320 --> 27:18.480
project that they were part of. We offered balance assessments from a physical therapy company.

27:18.480 --> 27:27.120
We had a successful open house back in October of last year. We added a new programming offering

27:27.120 --> 27:36.320
called Game Day that consists of both board games and card games. We partnered with St. John's the

27:36.320 --> 27:43.760
23rd to offer intergenerational bingo, which was very fun. And the kids were excellent bingo

27:43.760 --> 27:48.960
players. You would think seniors rock at bingo, but they they really showed us up.

27:49.920 --> 27:57.200
We added a new feature called the monthly short story discussion in partnership with the library.

27:57.920 --> 28:05.440
We added a journaling class of forest bathing and many more fun and exciting offerings.

28:06.160 --> 28:11.520
In 2026 our goal is to develop seven new well attended programs classes,

28:12.320 --> 28:17.760
presentations and special programming utilizing the seven dimensions of wellness.

28:18.880 --> 28:25.040
Our second goal is to develop or was to develop standard operating procedures for the senior

28:25.040 --> 28:32.720
center. The first part of that was to identify what areas we needed to have those operating

28:32.720 --> 28:40.960
procedures for identified 40 areas and had worked on that. We will be continuing that

28:40.960 --> 28:47.920
goal or have been continuing that goal into 2026. That was a pretty lofty goal to tackle,

28:48.560 --> 28:56.160
but we're definitely making progress in that. The third goal is implement a data tracking system

28:56.240 --> 29:05.600
at the senior center. The outcome is that that goal was met and that we did add a new data

29:05.600 --> 29:13.280
tracking system in 2025 at the end of the year utilizing rec desk, which is a program that

29:13.280 --> 29:21.680
the rec department had. So that allowed us to use it rather than purchasing a new data tracking

29:21.680 --> 29:29.840
system as a cost saving measure. And then starting with January 1 members received

29:29.840 --> 29:38.560
bar code cards, they look like this. They have our name and then it has a little one you can

29:38.560 --> 29:43.440
put on your key chain and one you can put in your wallet. So when folks come in now,

29:43.440 --> 29:49.920
there's a way that they just scan in and all of the daily activities are listed so they can

29:49.920 --> 29:55.680
click on what they're all there for. So if they're there, say for cardio drumming,

29:55.680 --> 30:00.480
Lakeside T, and then they're going to use the fitness center, they actually would all of those

30:00.480 --> 30:08.640
areas would be indicated. Prior to this, we were just basically the total number there that was

30:08.640 --> 30:14.640
mentioned. That's just how many times they entered the building. But this way, we're actually able

30:14.640 --> 30:23.280
to look at programming usage and really see what folks are taking advantage of at the frequency

30:23.280 --> 30:31.120
in many different factors. So prior to all of this as the mayor indicated, we were pretty much

30:31.120 --> 30:37.920
using a three ring binder type of system to track what people were participating in. And if they

30:37.920 --> 30:45.760
came for one activity, if they came for two, maybe they wrote times two maybe. And so we really

30:45.760 --> 30:56.000
were not capturing program utilization. And it was a very old and outdated and very labor-intensive

30:56.000 --> 31:05.360
process to track all of that very inaccurate. A lot of duplication of efforts as well. So this has

31:05.360 --> 31:14.560
been a huge step forward in our overall operations. Also this year, we allowed, it's kind of part

31:14.560 --> 31:21.760
of this goal, we incorporated the ability to register online for classes so people can do that

31:21.760 --> 31:26.960
either using their home computer or their cell phone, which has also been a huge upgrade.

31:28.080 --> 31:32.480
We also are now able to take credit card payment for the first time, which

31:32.640 --> 31:40.000
that's a huge bonus to people to be able to do that. Not very many people carry around a lot of cash

31:40.000 --> 31:47.200
or often have their checkbook. So we're kind of getting, I guess you could say, in the times now

31:47.200 --> 31:55.200
with how things are done. So that's a good thing. And then for 2026, we'll be continuing to look at

31:55.200 --> 32:02.960
this grant or this goal. But on a different twist to it that we're now going to be instead of

32:02.960 --> 32:10.960
implementing data tracking, now we'll be able to use the information that we obtained through that

32:10.960 --> 32:20.800
tracking to use it for purposes such as grant writing, evaluating programs, and having the

32:20.800 --> 32:27.040
demographics that go along with it to be able to use the information for a variety of purposes.

32:28.560 --> 32:34.000
Our fourth goal was to make the center a more welcoming environment for members and visitors.

32:34.640 --> 32:41.840
And that goal has certainly been worked on and I would consider it met. We did a revamp of the

32:41.840 --> 32:50.400
front lobby. We now have actually Susan's desk in our front lobby so that we have a welcome area

32:51.360 --> 32:57.760
so that when folks enter, there is a familiar face greeting them. They can assist with

32:58.800 --> 33:04.720
some of the things with the check-in process, answer some of the questions. So it's allowing

33:04.720 --> 33:12.160
a volunteer opportunity, but it's also a way to have a human connection when you walk in versus

33:12.160 --> 33:19.520
walking in and wondering where you go. So it's been a really good thing. We've done a considerable

33:19.520 --> 33:25.280
amount of cleaning and organizing in 2025. Volunteers and members of the Commission on

33:25.280 --> 33:32.880
Aging were instrumental in assisting with that project. When I hear people say the center is

33:32.880 --> 33:37.680
so welcoming and it's such a clean place, I'm like, that is music to my ears because that's

33:37.680 --> 33:44.560
exactly what we were going for. We want it to be a clean and welcoming space, but we also beyond

33:44.640 --> 33:50.080
the physical appearance, we want it to be a place where people feel welcomed. It's not just about

33:50.080 --> 33:57.920
clutter. It's about a feeling. It's about staff and volunteers and members of the center,

33:57.920 --> 34:04.480
a combined effort in making each person who walks in for the first time feel welcomed or that they

34:04.480 --> 34:13.360
belong. I love to hear people say, oh, it's such a friendly place. Oh, I felt instantly welcomed

34:13.360 --> 34:20.800
there. And I think that's exactly what a senior center should be. And I'm so proud that that's

34:20.800 --> 34:29.840
what it is. We will continue on that track into 2026 and actually have already met

34:29.840 --> 34:39.520
the 2026 goal that was to utilize rotary club center beautification grant that we received

34:40.240 --> 34:50.480
in amount of about $4,000 to continue creating that welcoming environment that interior painting,

34:50.480 --> 34:56.720
new wall decor, window coverings in the dining room in those types of things. The fifth goal

34:56.720 --> 35:02.000
was to create a fitness center that allows member to use the equipment during center hours to improve

35:02.000 --> 35:07.440
their physical health and wellness. And that goal was achieved. The fitness center was cleaned,

35:07.440 --> 35:13.920
revamped, and it is now open Monday through Friday 8.30 to 4, which are our center hours,

35:13.920 --> 35:19.360
so it makes sense that it would be open the entire time. The sixth goal was to increase

35:19.360 --> 35:29.280
center membership by 10%. We actually increased it by 25% by adding 85 new members and offering

35:29.280 --> 35:37.120
them the benefits of being a member of the center. And this goal will continue into the new year.

35:37.440 --> 35:42.480
I feel that having the goal of increasing membership is important and should be ongoing.

35:43.600 --> 35:49.200
The seventh area was to increase community awareness of the senior center by increasing

35:49.200 --> 35:57.360
community outreach. Quite a lot of work was done on this goal during the year. Speaking at civic

35:57.360 --> 36:02.880
groups, having a booth at the farmers market to promote the center and the center survey,

36:03.840 --> 36:11.360
adds our information in the Ozaki press letter to the editor appeared. We had the open house

36:11.360 --> 36:20.720
that I mentioned back in October of 2025. We had 45 individuals attend and added that number

36:20.720 --> 36:26.080
approximately 20 of those individuals signed up to become members during the open house.

36:26.960 --> 36:34.240
In August of 2025, we held a large community event called concert in the park. We had about

36:34.240 --> 36:41.280
180 people attend that event, and it was a wonderful gathering of not only members of the senior

36:41.280 --> 36:47.680
center, but members of our community of all ages, grandparents there with their grandchildren,

36:47.680 --> 37:00.000
or a group home with some folks with disabilities and just a wide range of community members

37:00.000 --> 37:06.800
all coming together to enjoy music. We had some great sponsorships. So all in all, it was

37:07.680 --> 37:14.400
like a way for us to get our name out there, a way for us to promote the senior center. We had

37:14.480 --> 37:19.360
memberships signed up information, so a very nice opportunity.

37:22.880 --> 37:28.880
Another thing that we have really increased our community outreach is getting the newsletter

37:28.880 --> 37:35.120
out to different community sites. We now have the newsletter available in 20 sites throughout

37:35.120 --> 37:43.360
the county as well as at the center, and it's also available online as well as on Facebook.

37:44.400 --> 37:50.640
Also during the year, we have increased social media presence. I also do regular Facebook post,

37:52.000 --> 38:03.200
and try to get as much interaction there as you can using the social media, and we have

38:03.200 --> 38:09.840
increased our followers in the social media area considerably over the past year. I'm an active

38:09.840 --> 38:14.960
member of the Wisconsin Association of Senior Centers, and last year we received an award

38:14.960 --> 38:23.680
at the state conference. It was the Edison Bell Einstein award for creative programming,

38:23.680 --> 38:31.280
so that helps to get the word out to and connect folks to what we do. So increasing our community

38:31.280 --> 38:38.240
outreach is very important, and I think continuing toward that goal into 2026, obviously we have

38:38.240 --> 38:46.560
been doing. I think the possibilities are literally endless on ways we can connect and

38:46.560 --> 38:53.600
share the work that the senior center is doing. Our eighth and final goal was to determine community

38:53.600 --> 38:59.280
needs by completing a public survey, and that goal was what we met. We completed that at the end of

38:59.280 --> 39:08.560
September. We had 181 survey respondents complete that survey, and those results were

39:08.560 --> 39:16.080
prepared and made available. We, you know, of course, dissected it and looked at what did we

39:16.080 --> 39:23.440
gather from it, and are using that to, you know, make some adjustments in programming and ways

39:23.440 --> 39:31.120
that we communicate about the offerings available. So, yeah, so those are the goals

39:31.920 --> 39:36.800
both for 2025, and then what we've been working on for 2026.

39:38.400 --> 39:42.640
Dana, at what age can you join the senior center? 55 or better.

39:43.200 --> 39:49.200
And what are the, what are the dues? That depends on if you're a resident, if you're a resident,

39:49.200 --> 39:54.560
it's 25, and if you're not a resident, it's 45, and then there is also a couple, right?

39:55.280 --> 40:00.160
And what's your most recent news from the Wisconsin Association of Senior Centers?

40:01.520 --> 40:11.600
Well, two things. One is I'm going to be the delegate for our area for 2027 for a two-year term,

40:12.240 --> 40:19.120
and then I just was notified on Friday that I will be receiving an award at the state

40:19.120 --> 40:25.840
conference. The name of the award is the Rising Star Award, and it's for senior center directors

40:25.840 --> 40:32.240
that have been in their role at their senior center for two years, unless, or excuse me,

40:32.240 --> 40:36.240
three years or less. That is excellent. Congratulations. That was very cool to see.

40:36.240 --> 40:39.440
Thank you. Yeah, we're very proud of you for that, and thank you for all you do

40:40.240 --> 40:45.280
for our seniors, all the warm and pastel that you have anything you wanted to add as chair of the

40:45.280 --> 40:50.800
COA. I just wanted to say that the senior center is full of energy. It's hopping all the time.

40:51.360 --> 40:56.640
People are happy. If you're 55 or better, and you don't belong to the senior center,

40:56.640 --> 41:01.440
consider it. It's pretty cool. Thank you. Any other members from council? Any

41:01.440 --> 41:06.640
wonders or questions? Excellent. Thank you very much. We're very proud of you.

41:06.640 --> 41:09.520
Thank you so much.

41:12.400 --> 41:15.360
All right. That then brings us to the last agenda item under mayor's business. The

41:15.360 --> 41:20.080
appointment of the city clerk, Susan Westbeck, as our cemetery commissioner. Is there anyone

41:20.080 --> 41:27.040
willing to make that motion? Motion by all the person bending, seconded by all the person

41:27.040 --> 41:30.720
pastel. Any questions or concerns on that appointment? Seeing none, all in favor,

41:30.720 --> 41:36.080
signify by saying aye. Opposed? All right. Motion carries. That brings us into officer and staff

41:36.080 --> 41:40.000
reports. The next is the presentation on the TID number five projects.

41:42.000 --> 41:48.480
Okay. With this tonight, we have Ben Wood from Strand Associates and Aaron Grohl from Kapoor.

41:48.480 --> 41:56.720
They were in front of the council back in April, providing an update on the status of

41:58.000 --> 42:02.320
tax and incremental district number five project planning. And so they are with us here

42:03.200 --> 42:10.160
tonight to make an updated presentation. If anyone either following along or wants

42:10.160 --> 42:22.960
to look at it later, it's available on the website. It's part of the agenda packet for this evening.

42:22.960 --> 42:34.160
Okay. Thank you, Rob, for that introduction. My name is Ben Wood, engineer with Strand Associates,

42:34.160 --> 42:40.800
along with me is Aaron Grohl from Kapoor. As Rob mentioned, we're going to be giving an update

42:40.800 --> 42:46.720
from information that was shared in April. One of the reasons that we're back here tonight is

42:46.720 --> 42:53.920
it's been a mission of city staff to provide regular updates for the sake of working together

42:54.560 --> 43:00.800
with the community and across the community, including many touch points with stakeholders,

43:00.800 --> 43:08.000
both with various departments within the city and other stakeholders within the community.

43:10.000 --> 43:15.680
Tonight, we're going to cover an overview of the TID project plan. We're going to look at broad

43:15.680 --> 43:20.560
project maps and schedule. We're going to spend most of our time getting into the individual

43:20.560 --> 43:27.600
project descriptions and follow up with the summary. As a brief overview of the TID project plan that

43:27.600 --> 43:33.200
was put together by ELLERS, the city's financial consultant, this is a developer finance TID

43:34.160 --> 43:39.600
that contains in total approximately $180 million of city-led infrastructure projects,

43:40.160 --> 43:45.680
all of which have the basis of need under the categories of expanded service area,

43:45.680 --> 43:55.360
redundancy and resiliency and capacity. This map shows that overview of the TID and the TID projects

43:56.800 --> 44:02.960
many have seen this map or variation of it before, but I want to break down just what we're looking

44:03.040 --> 44:11.120
at here. The yellow area is the current vantage data center development area. The pink is a

44:11.120 --> 44:17.280
future phase of that under common ownership. The blue areas that are kind of around the

44:17.280 --> 44:23.360
south tip of the yellow, that is unincorporated Canalsville, an area within the town of Port

44:23.360 --> 44:29.280
Washington, that the city has an obligation through past inter municipal agreements to provide

44:29.920 --> 44:36.160
water and sewer utilities to that area. Then the green areas that kind of flank both the

44:36.720 --> 44:45.360
east and the west of the TID 5 data center area, those are areas that once water and sewer utilities

44:45.360 --> 44:53.120
get expanded up that direction could conceivably at some point in the future expand. It's not

44:53.120 --> 44:58.960
a promise or an obligation, but rather this planning has to be done in conjunction with the

44:58.960 --> 45:05.760
southeastern Wisconsin regional planning commission and they encouraged that the city

45:05.760 --> 45:11.920
consider what logical adjacent areas could get on utilities at any point in the future

45:12.720 --> 45:18.800
just to plan for that scenario. Individual projects are labeled on here. I understand

45:18.800 --> 45:25.360
that you can't see them, but I just wanted to provide some context here that there are projects

45:25.440 --> 45:33.440
on the north side of I-43 in the TID area directly that serve the TID area and there are projects

45:33.440 --> 45:41.120
within the existing or preexisting city limits that are necessary to increase capacity or improve

45:41.120 --> 45:49.760
redundancy and resiliency in order to serve that area with utilities. This is an updated

45:49.760 --> 45:58.400
Gantt chart schedule of the known, I shouldn't say known, I should say the city TID projects

45:58.400 --> 46:06.080
that are actually progressing at this time in order to serve the part of the TID that's under

46:06.080 --> 46:11.680
construction right now. Again, I know that there's a lot here and we're going to go through each

46:11.680 --> 46:16.160
of these projects line by line in future slides and then I'm going to show this slide again at the

46:16.160 --> 46:21.760
end, but I just want to let you know that each of these projects is being planned out,

46:22.800 --> 46:29.040
being cognizant of how the different projects may overlap or intersect one another.

46:31.120 --> 46:39.680
The overall bar or the arrow represents the total duration of the project starting at design,

46:39.680 --> 46:45.600
going through permitting, all the way through construction completion. The star on each line

46:45.600 --> 46:50.400
represents when those projects would go out to bid to a contractor and be awarded,

46:50.400 --> 46:56.160
at which point some actionable items would come back to public works on the council.

46:57.200 --> 47:04.080
And then the hatched crosshatch bars here represent when we expect active construction to take place.

47:06.880 --> 47:13.280
The first project is 26-1 and I'm going to turn it over to Erin to explain the first couple of

47:13.280 --> 47:20.080
projects. Thanks, Ben. Good evening, everybody. Thanks again for having us. As Ben stated a little

47:20.080 --> 47:25.920
bit earlier, you've seen different variations of this and these are updates to what you've seen in

47:25.920 --> 47:33.280
the past. So this is what we call 26-1, it's water and sewer extension. This runs along

47:33.280 --> 47:39.760
Mink Ranch Road to the west of Kontrunk Highway H, also on Highland Drive to the east of H and

47:39.760 --> 47:48.240
then up Kontrunk Highway KW, approximately to the boat storage facility. This has over

47:48.240 --> 47:56.560
8,000 feet of water main and 3,000 feet of sanitary sewer and this serves the Canalsville parcels.

47:56.560 --> 48:04.160
The main project purpose for this is to provide looping for water and sewer up to the

48:05.040 --> 48:10.240
TID-FRI projects, but also to serve the Canalsville obligation area.

48:11.840 --> 48:18.720
The project schedule is the construction, the design is complete. We have already gone out to

48:19.360 --> 48:25.760
bid and received bids from contractors and we anticipate on recommending award,

48:25.760 --> 48:33.040
potentially recommending award in October. The projects are currently under review by the

48:33.040 --> 48:42.800
city attorney. As far as construction is anticipated, we expect from January through

48:42.800 --> 48:48.000
October of 2027, pending DNR and PSC approvals.

48:51.600 --> 49:00.400
26-2 is water main extension only, no sanitary sewer and this runs along Kontrunk Highway KW

49:00.400 --> 49:07.040
up to Lake Drive and then connects into the TID-FRI projects for a second connection for

49:07.040 --> 49:14.240
water main, a redundancy connection point. This is about 11,000 feet of water main. We're planning

49:14.240 --> 49:21.680
on utilizing trenchless water main installation. The reason for that is to try to minimize impacts

49:21.680 --> 49:29.200
to the property owners, business owners that are along KW and up through Lake Drive.

49:30.000 --> 49:35.200
We'll have open cuts for where the hydrants are and we will be installing a pressure-reducing

49:35.200 --> 49:40.880
valve up on Lake Drive and then also automatic flushing hydrants in two different locations.

49:41.840 --> 49:47.760
Again, as I just stated a second ago, the purpose is to loop to the north connection point and also

49:47.760 --> 49:52.720
to serve the Canalsville obligation area. We also received bids at the same time as when we went

49:52.720 --> 49:59.920
out for bid for 26-1. They're under review by the city attorney and we anticipate recommending

49:59.920 --> 50:09.440
award in October. This schedule also is anticipated from January to October of 27, pending DNR and PSC

50:09.440 --> 50:21.280
approval. As far as key considerations, coordination with the agencies, coordination with neighboring

50:23.440 --> 50:30.160
communities within the town, also coordinating with a DOT. This map to the right side just shows

50:31.600 --> 50:39.360
detour routes. Just for instance, a lot of the collaboration that are the city staff, our staff

50:40.880 --> 50:49.040
working with the town, working with the county, working with WISTOT to gain permits to make sure

50:49.120 --> 50:55.680
that what we're presenting here and as far as traffic control detour routes, all will work as

50:55.680 --> 51:02.320
best as possible for the residents in this area. We're cognizant that this makes impacts to those

51:02.320 --> 51:07.440
that drive through here. We want to try and make sure that we construct these projects in a way

51:07.440 --> 51:12.960
to minimize the amount of impacts that they have. So that's a key part to our design.

51:13.840 --> 51:21.200
The next project is 27-2. This is sewer and water extension as well. This is a long

51:21.200 --> 51:28.080
kind of trunk highway H basically from the intersection of H and KW and Highland Drive and

51:28.080 --> 51:35.440
Minkeringge Road. So this extends basically up to the railroad tracks and it has about 2,400 feet

51:35.440 --> 51:41.440
of water main and 1,800 feet of sanitary sewer. Again, purpose for this is to serve the obligation

51:41.520 --> 51:46.480
area in Canalesville and also to provide a secondary loop to the water main that will be

51:46.480 --> 51:53.920
extended on county trunk KW. The design is ongoing for this project. We anticipate on bidding this

51:53.920 --> 52:04.160
winter with 2027 construction in the second quarter towards through the end of the season next year

52:04.960 --> 52:07.440
and we are pending permits for this project.

52:07.440 --> 52:11.360
With that, I'll turn it back over to Ben.

52:15.360 --> 52:22.000
All right. The next project is wastewater treatment plant planning. This is ongoing

52:22.000 --> 52:28.160
currently and anticipated to go through roughly the middle of next year. There are actually two

52:28.160 --> 52:33.440
plans that are happening concurrently right now. The first one is the wastewater treatment plant

52:33.440 --> 52:41.680
facility plan. This is a plan that's required by DNR when forecasted demands are approaching

52:41.680 --> 52:49.520
80% of the current plant capacity. They require this so that you can address how you might upgrade

52:49.520 --> 52:57.520
or expand the plant proactively. The scope of this plan includes reviewing options for expanding

52:57.520 --> 53:03.360
the plant. You can see that the site down there in the lakefront right now is pretty tight.

53:04.240 --> 53:13.040
So we're looking at ways and creative processes to try to see if that plant needs to be expanded

53:13.040 --> 53:19.600
how that could be done most effectively. The second plan that's going on right now is the

53:19.600 --> 53:26.480
sanitary sewer service area plan update and that encompasses the areas that you see in the color

53:26.480 --> 53:33.040
coded map to the right there. That plan is actually something that is authored in a process

53:33.040 --> 53:40.320
that's led by the Southeastern Wisconsin Regional Planning Commission. They're on track for a second

53:40.320 --> 53:49.920
quarter 2027 completion of that plan. Next is the water booster station, water facility,

53:49.920 --> 53:55.760
and associated water means. There's a lot of information on this slide but know that

53:55.760 --> 54:07.120
Strand was involved in doing a comprehensive water system study in 2023 and 2024. One of the

54:08.720 --> 54:16.560
outcomes, I'm sorry, 24 and 25. One of the outcomes of that study brought to light that the existing

54:16.560 --> 54:20.720
booster stations out in the system, one of which there's a picture of the interior,

54:21.600 --> 54:27.440
is significantly aged and passed the typical useful life. They're still serviceable but the

54:27.440 --> 54:32.880
equipment is at a point where it needs to be replaced. As a matter of fact, one of the booster

54:32.880 --> 54:40.880
stations had a catastrophic failure within the last year and a motor had to be replaced.

54:41.520 --> 54:49.840
We looked at this situation and recommended replacing the two existing aged booster stations

54:49.840 --> 54:57.840
with one new consolidated booster station. The top middle graphic just demonstrates that we did

54:57.840 --> 55:05.440
a siting study, evaluated seven different sites within the city that would be suitable for a

55:05.440 --> 55:11.920
booster station and the selected site that is shown on the upper right is on Oakland Avenue and

55:11.920 --> 55:20.720
it's actually adjacent to one of the existing two booster stations. The graphic on the bottom

55:20.720 --> 55:28.640
has that recommended site highlighted in the darker blue and then because the station is going to

55:28.640 --> 55:34.320
be consolidated, it'll have more pumping capacity in one location in the city than the previous

55:34.320 --> 55:41.280
station did and so we're recommending upsizing water means along the yellow route that provides

55:41.280 --> 55:47.280
necessary hydraulic capacity in the pipe on the suction side and discharge side of that station.

55:47.920 --> 55:53.520
I want to call your attention back to the top middle graphic. You can see that map is shaded

55:53.520 --> 55:59.280
with some purple area and some green. Those represent the different hydraulic pressure zones that the

55:59.280 --> 56:06.160
city's water distribution system operates under. The water treatment plant from the lake

56:06.800 --> 56:12.880
pumps directly into the main zone which is highlighted in purple and then these two existing booster

56:12.880 --> 56:19.840
stations boost that to a higher pressure to serve the higher elevation areas of the city as you get

56:19.840 --> 56:26.880
farther away from the lake. TID 5 is in that green or elevated booster area and therefore this

56:26.880 --> 56:33.120
project is TID eligible because it also helps supply water to the TID 5 site.

56:36.080 --> 56:44.640
This project we are hoping to start design on the booster station yet this year with bidding

56:44.640 --> 56:50.880
by quarter three of twenty twenty seven. We anticipate multiple bid packages that the booster

56:50.880 --> 56:56.400
station and facility might be a separate package than the water mains and the water mains themselves

56:56.400 --> 57:04.000
could be broken up into multiple bid packages to time those projects well with other construction

57:04.000 --> 57:10.320
projects that the city may have going on. Booster station is complex with a lot of electrical

57:10.320 --> 57:15.120
equipment and controls that have some longer lead times. So we're actually showing five

57:15.120 --> 57:19.920
quarters of construction with the hope to wrap that up by the end of 2028.

57:20.560 --> 57:29.920
The next project here is the Valley Creek restoration. Rob and his team have been in front of

57:31.680 --> 57:36.880
the council on a couple of occasions explaining the background and overview of this project

57:36.880 --> 57:42.480
which is shown in the graphic here on the right. This is a stream restoration project that helps

57:42.560 --> 57:49.920
with flooding control and particularly with treatment plant resiliency. Rights down on the

57:49.920 --> 57:54.880
waterfront of course are the wastewater plants. There's a park that separates it from the

57:55.440 --> 58:01.840
drinking water treatment plants. It's a tight area down there and the plants have been impacted by

58:01.840 --> 58:08.000
flooding in the past and it is projected that the stream restoration project will help kind of

58:08.000 --> 58:15.680
restore some of the natural ability of the waterway to handle the flood events better.

58:16.640 --> 58:22.880
The design of this is in progress. This project is partially not entirely but partially funded

58:22.880 --> 58:29.600
by TID and the city has applied for partnership funds that they expect to hear back on whether

58:29.600 --> 58:36.640
or not the applications were successful in approximately the next month or so and just know that

58:37.600 --> 58:46.960
as a key consideration here that Aaron's team, my team and the team that's designing the stream

58:46.960 --> 58:55.280
restoration or in coordination to kind of sequence the projects in a way that will minimize disruptions

58:55.280 --> 59:00.640
for example to the inner urban trail but also will be done in a logical sequence

59:00.960 --> 59:05.600
relative to the various projects the city has going on.

59:09.440 --> 59:16.880
The next project is the Jackson Street Interceptor. Survey is underway for this. Design will be

59:18.240 --> 59:26.400
ongoing. It's not because the design is overly complex but because we wanted to program this

59:26.480 --> 59:33.920
project for the bulk of the actual construction work to take place in 2028 city staff advise that's

59:33.920 --> 59:40.080
where it would fit in well relative to other projects that are in the normal capital improvement

59:40.080 --> 59:48.720
plan. This will upsize approximately 700 feet of 15 inch sanitary sewer to 30 inch. It is

59:49.520 --> 59:58.080
not on the direct interceptor route that serves TID 5 but it's adjacent to it and ties into the

59:58.080 --> 01:00:06.320
same downstream pipe near the treatment plant site and upside the sizing the sewer provides

01:00:07.200 --> 01:00:12.880
extra capacity in the overall collection system and provides some surcharge relief from events

01:00:12.960 --> 01:00:16.160
that have historically happened on Jackson Street.

01:00:19.680 --> 01:00:27.040
That brings us to the sanitary sewer upsizing that actually more directly serves the TID 5 project

01:00:27.040 --> 01:00:34.800
area. The entirety of that route is shown in the map in this pink line as the Gantt chart implies

01:00:34.800 --> 01:00:43.200
that's being broken up into three different bid packages with the first package that is going

01:00:43.200 --> 01:00:52.240
to be designed to go out to bid is the lowermost portion the 27-1 that is closest to the treatment

01:00:52.240 --> 01:01:01.120
plant. The second project is the furthest upstream and then the middle project 30-1 at this time we

01:01:01.200 --> 01:01:07.680
do not believe that part of the interceptor needs to be upsized. We believe that it has

01:01:07.680 --> 01:01:15.360
adequate capacity right now. We learned that after studying it further after the TID plan was finalized

01:01:16.160 --> 01:01:21.520
so there's budget for that in the TID plan but we don't think that we're going to need it. The

01:01:21.520 --> 01:01:29.920
reason why is when this whole stretch is completed segment 28-2 will be 21 inches.

01:01:30.560 --> 01:01:36.720
Segment 30-1 is already 21 inches and then segment 27-1 will be

01:01:37.680 --> 01:01:47.840
upsized even further to 30 inches, 30 and 36 inches as it gets closer to the plant.

01:01:48.720 --> 01:01:57.120
The purpose of this is to increase capacity, mitigate surcharging and we expect to,

01:01:58.080 --> 01:02:03.920
the core team is already under design and their portion of this strand will be designing the

01:02:03.920 --> 01:02:09.120
portion that's actually on the grounds of the treatment plant and we expect to get started on

01:02:09.200 --> 01:02:10.480
that yet this year.

01:02:16.160 --> 01:02:23.200
Shown here are obviously five different projects. They're in all under the broad category of utility

01:02:23.200 --> 01:02:33.920
looping. On this map these include the water main projects that continue on the east side of TID

01:02:33.920 --> 01:02:44.320
5 and loop north and just back around west. Also shown are the sanitary sewer extensions that

01:02:44.320 --> 01:02:52.000
are necessary to serve the remainder of the areas of Canalsville. Note that in the far upper right

01:02:52.000 --> 01:02:59.120
here all these projects are under the caption development dependent. There have been no site

01:02:59.120 --> 01:03:06.000
specific development plans brought forth for the pink area or the northern phase of the

01:03:06.000 --> 01:03:14.640
lands owned by Vantage but the logical layout and timing of some of those projects will likely be

01:03:14.640 --> 01:03:23.440
intertwined with the timing and how that were to develop. So we've pushed most of these projects

01:03:23.440 --> 01:03:30.640
out a couple of years before design starts so these are kind of our best guess at this time.

01:03:31.920 --> 01:03:37.600
The light blue and dark blue projects I will point out do provide service to

01:03:38.960 --> 01:03:45.360
the obligation areas within Canalsville. So far Canalsville has been open to kind of

01:03:46.480 --> 01:03:52.640
deferring some of those projects until a higher level of confidence of exactly how to design them

01:03:52.640 --> 01:04:01.360
and for what is determined. So in summary specific city-led projects are being

01:04:01.920 --> 01:04:08.880
refined and are becoming actionable. Contract award and agreement actions will be upcoming

01:04:08.880 --> 01:04:15.280
as soon as the October meetings as Aaron stated. What we presented here tonight represents

01:04:15.280 --> 01:04:22.560
approximately $100 million of city-led TID 5 projects that will likely take place over the

01:04:22.560 --> 01:04:29.280
next five years. Reminder that financing is by the developer. There's extensive project

01:04:29.280 --> 01:04:34.720
coordination ongoing between projects, governments and departments, community and organizations.

01:04:35.520 --> 01:04:39.280
Overall this plan will be revised as the projects progress.

01:04:39.840 --> 01:04:48.160
Showing one more time. This overall schedule. And now they have a little more background and context.

01:04:48.160 --> 01:04:54.000
You can see how they all line up. But other than that we would just like to open it up for any questions.

01:04:55.840 --> 01:05:00.400
Council any questions or wonderings? All heard from Spassel?

01:05:00.400 --> 01:05:06.480
First, Strand and Kupur, thank you very much for putting this together. I do have one clarifying question.

01:05:07.440 --> 01:05:14.720
On your slide number 16 it says 4300 feet of 21 inch sewer near Terrace Drive.

01:05:15.520 --> 01:05:22.400
Will Terrace Drive actually be impacted by this? Will you need to upsize on Terrace Drive? I'm

01:05:22.400 --> 01:05:29.280
asking primarily for the residents that live on that street. Yes that is the intent. So it is

01:05:29.840 --> 01:05:35.280
intended to upsize all the way up to the far north end of the current dead end of Terrace Drive.

01:05:35.920 --> 01:05:42.480
And while that project also is designed we don't have the full design constraints quite yet.

01:05:42.480 --> 01:05:46.800
But we anticipate that there will be road reconstruction, repaving other things

01:05:46.800 --> 01:05:53.360
which to be determined but if certainly it will go to the end of the north end of Terrace Drive.

01:05:54.320 --> 01:05:56.000
Yep. Thank you.

01:05:58.560 --> 01:06:04.880
So I have like three separate questions for you. I want to thank you again for presenting

01:06:04.880 --> 01:06:09.280
this. This is the second time I've had the opportunity to hear this. And the last time I

01:06:09.280 --> 01:06:14.800
asked you questions that were really more focused on the city but tonight we have packed house

01:06:14.800 --> 01:06:18.800
with town residents. So I want to address some of the comments that they made.

01:06:19.680 --> 01:06:26.800
And I know the city of Port in our contract with the town are giving them 150,000 a year

01:06:27.440 --> 01:06:34.240
for the next five years to the tune of 750,000 dollars that will reduce their tax obligation

01:06:34.240 --> 01:06:38.480
or provide this town to be able to provide more services for them.

01:06:39.840 --> 01:06:51.120
So along with the opportunity for town residents to hook up to city and water should they choose

01:06:51.120 --> 01:06:57.200
and still not annex which is usually what happens when you offer a city and water and sewer that

01:06:57.200 --> 01:07:03.200
they can do that without it. Do we know if the town hall will be part of that project?

01:07:04.880 --> 01:07:12.800
Yes. So far the design team has had conversations with the town chairman and the intent is that

01:07:12.800 --> 01:07:18.160
the town hall is interested in connecting to municipal utilities as soon as they're available.

01:07:18.160 --> 01:07:22.320
Okay. So do you know if they're going to pay for that or we're just doing it

01:07:22.320 --> 01:07:29.760
gratis or do you not have any idea? I'll tell you the best of what I know right now and that is

01:07:29.760 --> 01:07:35.600
all of the infrastructure in the public right of way which would include the water main,

01:07:35.600 --> 01:07:41.520
the sewer main, the water service lateral to the curb stop and then a portion of the sanitary

01:07:41.520 --> 01:07:47.600
lateral usually to the property line. That is all part of the vantage paid for

01:07:49.200 --> 01:07:55.360
TID projects. I don't know that it's been hashed out yet the private portion of those

01:07:55.360 --> 01:08:01.040
laterals how those are getting paid for. Okay. It has. So so the city's obligation is to do

01:08:01.040 --> 01:08:05.280
the public right away and then the private the property owners it is their decision whether or

01:08:05.280 --> 01:08:11.200
not to hook up to those laterals including the town of Port Washington and just for clarification

01:08:11.200 --> 01:08:15.040
this is through Canelesville not the entire town of Port Washington. Yeah thank you.

01:08:15.920 --> 01:08:23.680
And then do we know of any other benefits that the town of Port residents will receive due to

01:08:23.680 --> 01:08:28.960
all these projects that we are our city taxpayers are going to be paying for.

01:08:30.400 --> 01:08:37.680
I'll just speak to the benefits directly tied to the projects and that is and I'm going to

01:08:37.680 --> 01:08:44.320
back up to the overview figure for that actually. So as as the mayor pointed out

01:08:44.880 --> 01:08:54.160
Canelesville which is in the blue shaded areas on this map the city is obligated to provide service

01:08:54.160 --> 01:09:00.880
to Canelesville and that will be met and then just by nature of needing to loop the utilities

01:09:01.840 --> 01:09:07.520
even further it's actually more properties than originally intended by those agreements

01:09:07.520 --> 01:09:12.320
that will have the opportunity to connect to municipal utilities if they so choose

01:09:13.120 --> 01:09:18.320
to do so those will be available to them. Thank you and then Miss Miller can I just address

01:09:18.320 --> 01:09:22.720
your question because there's some things they don't know about so in that in the last agreement

01:09:22.720 --> 01:09:27.520
with the town of Port Washington we had negotiated a reduced fire service contract as a result of

01:09:27.520 --> 01:09:34.320
this agreement as well as all of the water etc and then we had put in place a more firm boundary

01:09:34.320 --> 01:09:40.000
agreement about further annexation and almost uh you know not continuing to annex certain

01:09:40.000 --> 01:09:47.600
properties within the within the town. Thank you and second follow up is the the grant was

01:09:47.600 --> 01:09:53.280
mentioned mentioned by another individual for the Valley Creek project and you or Rob might be

01:09:53.280 --> 01:09:59.360
able to address this the grant that we've been writing about and we'll be applying for still

01:09:59.360 --> 01:10:08.480
exist still has dollars available. Yes it does so that was we made our application in June and we

01:10:08.480 --> 01:10:15.280
anticipate in October finding out if we are awarded our three point if we are awarded 3.8

01:10:15.280 --> 01:10:21.200
million dollars from the National Fish and Wildlife Foundation National Coastal Resiliency Fund.

01:10:21.920 --> 01:10:28.560
Yeah that that fund is alive and well. Thank you and my last question is how flexible is this

01:10:28.560 --> 01:10:37.120
plan especially with you didn't know it specifically 27-1 28-2 and 30-1 that those were

01:10:37.120 --> 01:10:45.200
development dependent. Describe what a development dependent issue might arise that would change

01:10:45.200 --> 01:10:54.160
that. Yeah I'll answer this in a couple of parts. I would say um the higher degree of confidence

01:10:54.160 --> 01:11:00.880
is for the projects more at the top of this chart in the top of this plan as Aaron mentioned 26-1 and

01:11:00.880 --> 01:11:09.280
2 have actually already bid. 27-2 is at approximately a 90% design. The wastewater treatment plant

01:11:09.280 --> 01:11:17.600
and sewer service area plans are probably 50% of the way along and the other projects kind of in

01:11:17.600 --> 01:11:23.440
the black and gray there are are about ready to kick off except for the Valley Creek project which

01:11:23.440 --> 01:11:32.320
is also Rob I would say is at about a 90% design stage. Yep being September 15th we received the

01:11:32.320 --> 01:11:40.880
the 90% plans today. There you go. Yeah perfect. And then 27-1 design has started on that and

01:11:40.880 --> 01:11:46.000
that's kind of at the middle of this page and then all the rest of them on the way down is kind of

01:11:46.720 --> 01:11:52.640
how we see them kind of shaping up with the best that we know now but we'll undoubtedly be back

01:11:52.640 --> 01:11:58.000
with an update on those projects. Now the second part of the question which is what's an example

01:11:58.000 --> 01:12:04.560
of a developer dependent project? This is a great question where I can kind of nerd out on the

01:12:04.560 --> 01:12:15.520
engineering a little bit. So the pink areas here that are in TID 5 as I mentioned we have not received

01:12:15.520 --> 01:12:23.200
any site specific development plans depending on how that develops. The lay of the land generally

01:12:23.200 --> 01:12:32.080
flows toward the lake right and water rolls downhill. So there's actually a split in the pink lands

01:12:32.080 --> 01:12:38.560
where where two-thirds of it kind of toward want to flow toward the east and that's how you would

01:12:38.640 --> 01:12:46.160
logically try to route a sewer interceptor to kind of serve that area with sewer but the other

01:12:46.160 --> 01:12:53.760
western third of that depends on how they develop the site. That sewer could flow all the way from

01:12:53.760 --> 01:13:01.440
west to east and then south through an interceptor or instead of that it could just go south and

01:13:01.440 --> 01:13:09.120
that's in until we know that we don't know okay should sewer be extended up KW first and when

01:13:09.120 --> 01:13:18.000
or should sewer go all the way around county LL first and when exactly. That's honestly really

01:13:18.000 --> 01:13:24.000
at the core of why those are developer dependent is we would want to really wait and see how they

01:13:25.440 --> 01:13:31.280
lay out their buildings and would want sewer service. So like any project whether it's small in your

01:13:31.280 --> 01:13:38.080
own home sometimes when you get halfway through it you realize it's far more complex or you have

01:13:38.080 --> 01:13:43.440
a whole lot more issues than you thought you would have and so you have to pivot so it's not a lie

01:13:44.320 --> 01:13:50.640
that this was our plan but sometimes things have to change. So it's not misspeaking.

01:13:52.000 --> 01:13:57.600
It is dealing with problems in an adult fashion. So I thank you for your time.

01:13:57.600 --> 01:14:04.320
Sure yes and Aaron and I of course are happy to be here and your staff has been great to work

01:14:04.320 --> 01:14:14.240
at work alongside. I do just want to also point out that at the time the TID project plan was put

01:14:14.240 --> 01:14:22.160
together I would say there was that was what we would refer to as like a concept level design

01:14:22.880 --> 01:14:28.160
just looking at existing ground contours you could sewer it this way or that way

01:14:28.960 --> 01:14:36.000
but both options are covered in the TID project plan. So we're kind of at a phase where obviously

01:14:36.000 --> 01:14:42.000
these projects are taking shape as we build that confidence and the scope is getting better refined

01:14:42.000 --> 01:14:47.840
and just to reiterate your own point like once we learn more they'll get refined even more and

01:14:47.840 --> 01:14:53.440
there are some things that could change but it's all under the umbrella of what was planned for

01:14:54.240 --> 01:14:59.120
in the TID. Thank you. Any other questions or wonderings?

01:15:01.280 --> 01:15:04.800
I'm sorry. We don't engage with the community. Thank you.

01:15:06.800 --> 01:15:12.560
Council? Okay all right that brings us into the next agenda item which is the and thank you

01:15:12.560 --> 01:15:16.160
gentlemen for that report and extensive work on that. Appreciate a good Gantt chart.

01:15:18.720 --> 01:15:22.960
Our monthly department reports were presented to us. I just wanted to point out and say thank you

01:15:22.960 --> 01:15:26.640
to the teams supporting that together. Again community if you have the opportunity to review

01:15:26.640 --> 01:15:31.200
the amazing work that's being done by every department in the city I think that's really

01:15:31.200 --> 01:15:38.160
important to go through there and I just wanted to give a special shout out to one of our firefighters

01:15:38.160 --> 01:15:44.480
Tom Shabruno who is celebrating his 44th year of service to the fire department with all of the

01:15:44.560 --> 01:15:49.360
other anniversaries. I think that's fantastic. That brings us into the city administrator update

01:15:49.360 --> 01:15:54.080
and she is not here this evening for that which then brings us to the city clerk for hopefully

01:15:54.080 --> 01:16:01.040
some election updates. Yes thank you. I just want to let everyone know that the ballots have been

01:16:01.040 --> 01:16:08.240
printed for November and have arrived and the first mail out of all absentee ballots to those with

01:16:08.240 --> 01:16:14.960
applications on file will be this Thursday. Absentee ballots can be requested by mail through

01:16:16.240 --> 01:16:24.400
from this point forward if you haven't already through October 29th. If you are doing mail out

01:16:24.400 --> 01:16:31.520
absentee I would recommend knowing for many years working with this program that you need to allow

01:16:31.520 --> 01:16:37.760
at least one week minimum to receive the ballot and one week to return it if you are out of state

01:16:37.760 --> 01:16:43.120
or out of country of course that's extended substantially. If you're interested in person

01:16:43.120 --> 01:16:48.480
early voting which is also absentee voting but it doesn't have the mail component to it.

01:16:48.480 --> 01:16:55.040
We will be holding that here peroition city hall in this room from October 20th through the 30th

01:16:55.920 --> 01:17:01.200
and that will be from 8 a.m. to 4 p.m. with the exception of the final day on October 30th it runs

01:17:01.200 --> 01:17:08.640
until 5. Election day is November 3rd. Polls open at 7 a.m. until 8 p.m. If anyone has any

01:17:08.640 --> 01:17:14.080
questions is interested in voter registration because they haven't completed that yet or has

01:17:14.080 --> 01:17:18.800
questions on absentee voting. Please contact City Hall and we'd be happy to help you.

01:17:19.920 --> 01:17:23.760
Thank you Susan. Thank you to all the volunteers and your team that does a great job every single

01:17:23.760 --> 01:17:28.480
election. Appreciate it. All right that brings us into the next oh I do want to back up to one

01:17:28.480 --> 01:17:33.200
thing I forgot under mayor's business and I wanted to thank Roger for working with

01:17:33.200 --> 01:17:36.880
vantage in the Department of Transportation. I would agree that the north side of Port

01:17:36.880 --> 01:17:42.240
Washington right now is ridiculous with the stoplights not being timed together as well as the

01:17:42.240 --> 01:17:46.640
attempt to try to make those roads better that is very difficult for everyone on the north side

01:17:46.640 --> 01:17:51.440
of town so thank you for reaching out to them and working with them to expedite that being cleaned

01:17:51.440 --> 01:17:57.680
up. Okay that brings us into the agenda items under general governance and finance committee.

01:17:57.680 --> 01:18:00.480
The first agenda item is consideration of possible action

01:18:02.960 --> 01:18:10.880
on an ordinance 2026-03 in ordinance repealing and recreating 415-03 lead and galvanized

01:18:10.880 --> 01:18:17.040
service line replacement requirement. This is the second reading for this and I'm going to turn

01:18:17.040 --> 01:18:26.720
that over to Roger. All right as as mentioned this is the second time this has been

01:18:26.720 --> 01:18:35.440
before council for for reading and essentially this this makes lead service line replacement

01:18:36.240 --> 01:18:43.120
mandatory underneath the conditions outlined in the memo. This was approved at the general

01:18:43.120 --> 01:18:48.320
government finance committee on August 4th and we recommend approval of the ordinance.

01:18:49.520 --> 01:18:50.240
Any questions?

01:18:52.320 --> 01:18:53.600
I'm wondering Mr. Benning.

01:18:54.960 --> 01:18:55.840
I'll move to approve.

01:18:56.560 --> 01:18:58.160
There's a motion to approve. Is there a second?

01:18:58.960 --> 01:19:02.960
Moved and seconded. Any questions or concerns on that motion? All right seeing none all in

01:19:02.960 --> 01:19:08.880
favor signify by saying aye. Opposed? All right the motion carries. Thank you for that. The next

01:19:08.880 --> 01:19:12.720
one agenda item is consideration of possible action of alcohol premise extension for Port

01:19:12.720 --> 01:19:16.640
Washington Main Street for the fall festival. The issue is should the common council

01:19:16.640 --> 01:19:20.960
recommend approval of a one-day extension of alcohol licenses for Sir James Pub,

01:19:20.960 --> 01:19:26.480
Twisted Willow, Verbosity, Book House, John's pizzeria, the plaid cardinal schooner pub,

01:19:26.480 --> 01:19:29.920
the steerage dining saloon, Bernie's fine meats, fork and tap,

01:19:29.920 --> 01:19:34.560
dino orchards and moonlight tavern to allow participation in the fall festival.

01:19:34.560 --> 01:19:40.320
The staff is recommending approval as presented for the establishment solicited on the attachment.

01:19:40.400 --> 01:19:40.800
Susan.

01:19:42.000 --> 01:19:48.800
Unless any of you have questions this festival runs annually is put on by Port Main Street in

01:19:48.800 --> 01:19:53.440
the downtown area. There is closures on Franklin Street and a few of the side streets

01:19:54.240 --> 01:20:00.080
to accommodate that that festival on that day. The extension of premise includes the

01:20:01.040 --> 01:20:06.800
beer and wine service from these establishments in plastic cups only and they would be able to

01:20:06.800 --> 01:20:13.120
be consumed within the grounds. All the paperwork and fees have been paid everything is in order

01:20:13.120 --> 01:20:17.520
so we're recommending approval. Fantastic day in Port Miss Miller.

01:20:17.520 --> 01:20:24.720
Just a curiosity do is it one bulk with all of these like they pay one fee or did each

01:20:25.840 --> 01:20:32.720
business have to pay at separate fee? The extension of premise that you're proving are for businesses

01:20:32.800 --> 01:20:39.680
that have annual alcohol licenses and the state statutes handle those differently than temporary

01:20:39.680 --> 01:20:47.840
licenses for festivals such as nonprofits. So they they have to provide the product

01:20:48.400 --> 01:20:54.880
within their own establishment as allowed by law and it can be carried outside of their

01:20:54.880 --> 01:20:58.480
establishment off their premise. So that's what you're proving.

01:20:58.480 --> 01:21:04.240
But if the fee is $5 is a $5 for all of them or did each business have to pay $5?

01:21:05.440 --> 01:21:11.600
That's what I'm asking. Those are the temporary licenses that we issue to the non-profits.

01:21:11.600 --> 01:21:15.360
That's a $5 or $10 charge. Is that what you're thinking?

01:21:15.360 --> 01:21:16.960
I don't know what the charge is.

01:21:16.960 --> 01:21:21.200
Yeah. Did Bernie's pay $5 or just Main Street pay the fee?

01:21:21.200 --> 01:21:26.000
And Main Street would pay for theirs. Yes. And Main Street handles.

01:21:26.160 --> 01:21:31.520
So what I'm hearing is that each business had to pay whatever the fee was. It wasn't like one,

01:21:32.400 --> 01:21:37.600
this group of people only paid for one. The each had to pay a fee. Is that what I'm hearing?

01:21:37.600 --> 01:21:41.920
No, they do not. Okay. They're there. That's paid by Main Street.

01:21:41.920 --> 01:21:44.480
I understand what you're saying now. I apologize. Thank you. I'm sorry.

01:21:46.080 --> 01:21:48.800
Other questions or is there someone willing to make a motion?

01:21:48.800 --> 01:21:51.760
Make a motion to approve. There's a motion to approve. Is there a second?

01:21:51.760 --> 01:21:53.760
I'll second. Oh, go ahead.

01:21:53.760 --> 01:21:57.440
Mary Lou, you get the second. Any questions or concerns on the motion?

01:21:57.440 --> 01:22:01.760
For October 3rd Fall Festival, seeing none, all in favor signify by saying aye.

01:22:02.400 --> 01:22:04.560
Opposed? Motion carries.

01:22:04.560 --> 01:22:10.080
That takes us into consideration and possible action to approve the use of water utility reserves

01:22:10.080 --> 01:22:15.120
to fund the East Path Improvement Project in 2026. The issue is, should the Common Council

01:22:15.120 --> 01:22:19.360
approve the use of water utility reserves to fund the East Path Improvement Project and the staff

01:22:19.360 --> 01:22:24.000
is recommending the approval of the water utility reserves to fund the East Path Improvements

01:22:24.000 --> 01:22:28.080
in 2026? Who's taking this one?

01:22:28.080 --> 01:22:30.080
I'll get it started and then. All right.

01:22:30.080 --> 01:22:35.360
Dan, technical question. We reviewed this in the General Government Finance Committee.

01:22:36.800 --> 01:22:42.800
Went through the financials piece of it. Mark assured us there's money in the reserves.

01:22:42.800 --> 01:22:49.280
This was planned for 2027. We're moving up to 2026, kind of end of the year,

01:22:49.280 --> 01:22:53.680
take advantage of some synergies with the contractors that are already on site.

01:22:53.680 --> 01:22:57.920
So that's really what the action tonight is about.

01:22:58.960 --> 01:23:00.080
Dan. Excellent. Dan.

01:23:00.080 --> 01:23:04.800
Yep. Thank you. I learned, Beni. This is a, I just wanted to give a visual of what this is

01:23:04.800 --> 01:23:08.640
going to look like. This is from the South Newport Shores Park in Latin looking North.

01:23:09.280 --> 01:23:13.920
The bump outs to the East are where our shore well tanks are.

01:23:13.920 --> 01:23:22.080
So the southern portion of this path gives the utility better access to the west part of the

01:23:22.080 --> 01:23:28.080
east part of the building and then our underground tanks were in the past. We had a pretty

01:23:29.760 --> 01:23:34.800
tough time accessing these tanks and then the south part where you see the brick work on the

01:23:34.800 --> 01:23:41.840
building that's actually the new tank. So this allows better access for utility as far,

01:23:41.840 --> 01:23:48.000
and then as well as emergency vehicles if they need to get to the path to get to the park or the

01:23:48.000 --> 01:24:00.080
rotary. I'm going to go. This is from the north looking south. So the north part portion of this

01:24:00.080 --> 01:24:08.320
is more open for residents and visitors. So we're planning on giving a little bit more green

01:24:08.320 --> 01:24:14.080
space back than what was previously there. There used to be a pretty large hill for where the

01:24:14.080 --> 01:24:20.000
grass met the rocks. So the plan is to kind of level that out. It's about 22 feet of green space

01:24:20.000 --> 01:24:27.040
before it hits the path. And the path is going to be about 14 feet wide. So we're taking the path

01:24:27.120 --> 01:24:32.480
a little bit more towards the plant, widening it a little bit, and then giving more green space back.

01:24:35.680 --> 01:24:41.360
I just I have one wondering for you or a request and that is at the beginning of that pathway,

01:24:41.360 --> 01:24:46.640
will there be a planter or a bawler that's going to stop the ability for vehicles to pull in there

01:24:46.640 --> 01:24:51.680
or a temporary one that can be pulled if you do have to bring in vehicles? Yeah, and also the curb

01:24:52.320 --> 01:24:57.200
getting into the path will still remain. So there's still going to be a curb. But yeah, okay,

01:24:57.200 --> 01:25:03.920
just for safety. Awesome. Other questions? I just have two comments. So we had discussed this

01:25:03.920 --> 01:25:10.080
pretty well in public works. And part of the reason why the path is so wide is so that emergency

01:25:10.080 --> 01:25:18.240
vehicles could get back there. So we need something removable. And then secondly where it ends is where

01:25:18.320 --> 01:25:24.560
Valley Creek would be daylighting. So we wouldn't be ripping out anything new. It would just be

01:25:24.560 --> 01:25:32.000
up to that point. Correct. Is that a motion? Sure. I'll make a motion to

01:25:33.200 --> 01:25:38.160
approve the recommendation of the staff. Which would be for the water utility reserves to fund

01:25:38.160 --> 01:25:42.480
the pathway. Is there a second on that motion? Seconded by Alderman Benning. Any questions or

01:25:42.480 --> 01:25:47.520
concerns on the motion? All right, seeing none. All in favor signify by saying aye. Opposed?

01:25:48.240 --> 01:25:51.200
All right, that motion carries. That takes us into the next agenda item.

01:25:51.760 --> 01:25:55.520
Get from the planning commission consideration and possible action on well permits for the data

01:25:55.520 --> 01:26:00.080
center. The issue is should the city grant private well operating permits at the data center and

01:26:00.080 --> 01:26:05.040
the staff is recommending the city grant the well operating permits for the existing wells. Roger.

01:26:10.800 --> 01:26:17.040
All right. This has been addressed to previous public works meetings in the board of public works.

01:26:18.480 --> 01:26:21.840
Recommended approval of the well permit for operating purposes.

01:26:22.960 --> 01:26:28.080
Essentially the purpose of our ordinances to prevent cross connections into our water main.

01:26:28.880 --> 01:26:34.640
These wells are in compliance with that and therefore we recommend approval of the operating

01:26:34.640 --> 01:26:38.240
permit. Okay. Any questions for Roger?

01:26:42.560 --> 01:26:45.360
Sir. The permit only last five years. Is that correct?

01:26:46.320 --> 01:26:51.840
Yes, our ordinance specifically states five years. And then clarification around the monthly

01:26:51.840 --> 01:26:55.680
reporting usage on an annual basis and on a monthly basis. What was the rationale there, Roger?

01:26:58.480 --> 01:27:07.280
It's very easy for us to get monthly readings on that. I'll have to discuss with PSC

01:27:08.080 --> 01:27:12.960
whether we can report that because typically we're not allowed to report specific users

01:27:13.760 --> 01:27:18.560
water amount. But since they're not drawing water or paying us for that water,

01:27:19.360 --> 01:27:24.400
I think we're able to make the data public. But that's something I have to look into.

01:27:25.760 --> 01:27:31.040
Miss Miller. So just a little clarification. This monthly report will be given to us

01:27:31.040 --> 01:27:38.160
monthly or we will receive 12 months at the end of the year. We'll we'll take specific monthly

01:27:38.160 --> 01:27:43.200
readings. So yeah, they have they have meters on their well. He's easy enough for us to get a

01:27:43.200 --> 01:27:48.960
reading. And we're allowed to go on their property and do that. Yeah. And we're going to do that

01:27:48.960 --> 01:27:56.880
at a condition. Okay, great. Roger, I have a question. Are there are there stipulations for

01:27:56.880 --> 01:28:04.240
this in for like businesses in the town or other people who have wells? I'm totally in favor of

01:28:04.240 --> 01:28:13.840
monitoring it. No, there are any any city properties that have wells. There's a handful. So they do not

01:28:13.840 --> 01:28:20.080
report their usage on the well or or we just do a five year inspection to make sure that they are

01:28:20.080 --> 01:28:25.920
not connected into the public system. And then just for my own assurance for the public, this

01:28:25.920 --> 01:28:33.280
this is only for usage to for you know, water use for drinking water, toilet flushing, etc. This

01:28:33.280 --> 01:28:38.320
is not being used for anything else. They're not pulling for concrete batching, etc. That is

01:28:38.320 --> 01:28:43.840
correct. And in that area, in the town of Port Washington, where would the nearest large capacity

01:28:43.840 --> 01:28:53.120
well be to the to that property? If you go east on Lake Drive past L.O. 943, there's there's a I

01:28:53.120 --> 01:28:59.200
believe it's a goat dairy and they they have a permit for high capacity. Well, okay. All right,

01:28:59.200 --> 01:29:02.880
thank you. And I do appreciate the monitoring. And if we can share that publicly legally,

01:29:02.880 --> 01:29:08.240
we should. Are there any other questions? Yeah, all the room pastel.

01:29:08.800 --> 01:29:16.880
And there's monitoring of water usage. Is there anything that is done as far as the sewer use,

01:29:16.880 --> 01:29:21.840
holding tanks, anything like that that might be monitored? Or is it strictly water usage?

01:29:22.080 --> 01:29:33.440
Well, the typical is that we monitor water and then sewage is the same amount. They do have

01:29:33.440 --> 01:29:39.680
holding tanks that they're using. And my understanding is once in a while, they'll take that to a

01:29:39.680 --> 01:29:44.720
remote site to dump. But I believe that they take it to a different wastewater treatment plant item.

01:29:46.960 --> 01:29:49.920
I guess I don't have knowledge of which other plants they go to.

01:29:52.720 --> 01:29:55.280
All right. Any other questions?

01:29:56.320 --> 01:29:59.600
Is there anyone willing to make a motion on the staff recommendation?

01:29:59.600 --> 01:30:05.120
And I should say, if they do remote dump at our site, we do track that volume and record it and

01:30:05.120 --> 01:30:09.760
send a bill for it. Yeah, let's clarify remote dump because that just sounds like they just get

01:30:09.760 --> 01:30:14.640
to put it wherever the heck they want to. That's that is. So we have a remote receiving station

01:30:15.520 --> 01:30:18.480
for the city of Port Washington. Yeah, before we bring in a lot of

01:30:19.280 --> 01:30:23.360
right, we bring in a lot of sewage from around the region as an opportunity for not a lot,

01:30:23.360 --> 01:30:26.320
but we bring in sewage from around the region or the potty haulers.

01:30:27.120 --> 01:30:31.120
And it's a revenue source for the city of Port Washington. Yeah. Okay. Thank you. Because remote

01:30:31.120 --> 01:30:35.920
dumping just sounds like that doesn't sound good. All right. Is there anyone willing to make a

01:30:35.920 --> 01:30:43.280
motion then on the staff recommendation? I'll make the motion. There's a motion. Is there a second?

01:30:44.160 --> 01:30:47.440
That's it. Moved and seconded. Any questions or concerns on the motion?

01:30:49.040 --> 01:30:54.400
All right. All in favor signify by saying aye. Aye. Opposed? No. All right. The motion carries.

01:30:54.960 --> 01:30:59.600
That takes us into the next agenda item from the Planning Commission, which is consideration

01:30:59.600 --> 01:31:04.480
possible action on amendment of a conditional use grant. We will be delaying this decision

01:31:04.480 --> 01:31:10.400
for this evening. We have to repost this for a public hearing. So if you're here for that agenda

01:31:10.400 --> 01:31:14.160
item tonight, that and council, we will be delaying that item. So that's going to bring us

01:31:14.160 --> 01:31:19.520
on to agenda item number 10, which is a public hearing on the proposed amendment to the city

01:31:19.520 --> 01:31:24.240
of Port Washington's Comprehensive Plan 2035. I'm going to call that hearing to order. The

01:31:24.240 --> 01:31:30.880
purpose of the design of this is the designation of 1.4 acres of land located at 365 North Wisconsin

01:31:30.880 --> 01:31:35.680
and 104 West Washington Street as mixed use traditional neighborhood on the city of Port

01:31:35.680 --> 01:31:41.040
Washington future land use map for proposed residential development. Notice is given that this

01:31:41.040 --> 01:31:44.880
hearing is to accept public comments on the proposed amendment to the city of Port Washington's

01:31:44.880 --> 01:31:52.080
Comprehensive Plan 2035. Are there any speakers on this for this public hearing? Any speakers

01:31:52.080 --> 01:31:57.760
for the public hearing? Any speakers for the public hearing? Okay. I'm going to close the hearing.

01:31:57.760 --> 01:32:02.560
That brings us into the subject agenda item, which is consideration and possible action on

01:32:02.560 --> 01:32:10.160
ordinance 2026-07 in ordinance amending the Comprehensive Plan future 2035 land use plan map

01:32:10.160 --> 01:32:15.680
for the purpose of designating approximately 1.4 acres of land located at 365 North Wisconsin

01:32:15.680 --> 01:32:20.160
Street and 104 West Washington Street as mixed use traditional neighborhood on the city of Port

01:32:20.160 --> 01:32:25.120
Washington future land use map for proposed residential development. The city of Port Washington is the

01:32:25.120 --> 01:32:30.560
applicant. This is the second reading, which means we can take action and the council is being asked

01:32:30.640 --> 01:32:35.440
to review and adopt an ordinance amending the city's comprehensive future land use map to designate

01:32:35.440 --> 01:32:41.040
approximately 1.4 acres of land from government institutional and utilities to mixed use traditional

01:32:41.040 --> 01:32:47.440
neighborhood to accommodate a proposed residential townhome development. Mr. Harris. So this is

01:32:48.480 --> 01:32:56.000
part of the process of lining up the former police and fireblock for that townhome residential

01:32:56.000 --> 01:33:02.880
development that you have all seen previously. This is the first step to rezone that property

01:33:02.880 --> 01:33:09.120
from public utility lands because it was the police and fire station and it is to change the

01:33:09.120 --> 01:33:15.680
land use map from public utility over to the down to a traditional neighborhood mixed use

01:33:15.680 --> 01:33:21.920
traditional neighborhood on the city's future land use map. So this is the first step and this

01:33:21.920 --> 01:33:29.200
will allow for a future rezoning to rezone it to be for and allow for that townhome development

01:33:29.200 --> 01:33:36.880
to move forward. Thank you. Any questions for Mr. Harris? Hold on one pastel. Just clarification

01:33:36.880 --> 01:33:43.440
regardless of who's building on this. This rezoning needs to be done, correct? Yes, correct. Thank you.

01:33:43.600 --> 01:33:45.600
Thank you.

01:33:45.600 --> 01:33:46.080
Other

01:33:46.080 --> 01:33:51.760
wonderings? Are we willing to make a motion? I will make a motion to adopt ordinance 2026-07.

01:33:52.640 --> 01:33:54.800
There's a motion. Is there a second? Second.

01:33:54.800 --> 01:33:57.280
Moved and seconded. Any questions or concerns on the motion?

01:33:57.920 --> 01:34:00.880
All right, seeing none. All in favor signify by saying aye. Aye.

01:34:00.880 --> 01:34:07.120
Opposed? All right, that motion carries. That takes us into agenda item 10-3 which also needs

01:34:07.120 --> 01:34:12.480
to be delayed until we can post for a public hearing for that. So that takes us to number four

01:34:12.480 --> 01:34:16.080
which is consideration and possible action on an easement agreement with the town of Port

01:34:16.080 --> 01:34:20.880
Washington for sewer and water utilities to be provided by the city of Port Washington.

01:34:20.880 --> 01:34:25.040
The issue is should the city approve an easement agreement for sanitary sewer and water

01:34:25.600 --> 01:34:29.440
main installation from the city of Port Washington into the town of Port Washington. The staff is

01:34:29.440 --> 01:34:34.240
recommending approving the easement agreement to provide utility services to the town of Port

01:34:34.240 --> 01:34:42.160
Washington. Mr. Strahm? Yeah, so you heard on the tip to presentation is this would be

01:34:43.840 --> 01:34:54.800
a part of project 26-1. The best route for sewer and water is the cut through the parking lot of

01:34:54.800 --> 01:35:02.000
the town hall. That involves the most efficiently serve that little community down there.

01:35:04.640 --> 01:35:06.320
So

01:35:12.000 --> 01:35:19.360
I guess I had a discussion with the town chair right before this meeting and their attorney would

01:35:19.360 --> 01:35:27.680
like to make a change to condition number eight on the easement. So the recommended motion would

01:35:27.680 --> 01:35:34.400
change to approve the easement agreement for sanitary sewer and water made to the town of Port

01:35:34.400 --> 01:35:42.640
Washington subject to the attorney's agreement on the easement language. This easement was prepared by

01:35:43.600 --> 01:35:45.440
Chris Smith of von Breason. So

01:35:47.760 --> 01:35:49.760
I need to have a discussion with him regarding it.

01:35:50.960 --> 01:35:56.080
Yeah, so the approval would be continued upon that there's some semantics in there that they

01:35:56.160 --> 01:36:00.960
want to adjust. Nothing that changes the scope of the contract at all in any way. We've done that

01:36:00.960 --> 01:36:09.440
before contingent upon final attorney approval. Any questions upon this issue? Was there anyone

01:36:09.440 --> 01:36:12.720
willing to make a motion to approve the easement agreement between the town and the city of Port

01:36:12.720 --> 01:36:17.760
Washington so we can run water and sewer? There's a motion. Is there a second? Second.

01:36:17.760 --> 01:36:20.240
We've been seconded. Any questions or concerns on the motion?

01:36:21.120 --> 01:36:24.560
The motion does include the it is what you read.

01:36:26.560 --> 01:36:31.600
Condition upon an attorney approval. Okay. All in favor signify by saying aye.

01:36:32.400 --> 01:36:37.680
Opposed? All right. That motion carries. That takes us into agenda item 10's 5.

01:36:37.680 --> 01:36:42.080
Consideration and possible action in stormwater maintenance agreement for Highland Point North.

01:36:42.080 --> 01:36:45.520
The issue is should the Common Council approve a stormwater maintenance agreement with Highland

01:36:45.600 --> 01:36:50.080
Point North LLC and the staff is recommending that the council does approve the stormwater

01:36:50.080 --> 01:36:57.760
maintenance agreement? Roger. All right. So this also is a pretty typical agreement that we make

01:36:57.760 --> 01:37:02.800
with with any development that occurs that is required to put some stormwater detention

01:37:02.800 --> 01:37:09.680
pond or or other treatment or flood control device for stormwater on our property. This

01:37:09.760 --> 01:37:15.440
essentially ensures that they will maintain it. If they don't maintain it, the city has the right

01:37:15.440 --> 01:37:18.560
to go on to the property and maintain it and send them a bill for the work.

01:37:22.560 --> 01:37:28.400
So our recommendation is to approve. Any questions? Mr. Benning.

01:37:29.600 --> 01:37:34.480
There's a motion to approve. Is there a second? Second. There's a second on the motion. Any

01:37:34.480 --> 01:37:39.040
questions or concerns on the motion? Seeing none. All in favor signify by saying aye.

01:37:39.840 --> 01:37:45.360
Opposed? All right. The motion carries. That brings us into agenda item number 10-6.

01:37:45.920 --> 01:37:51.200
Consideration and possible action on a resolution 2026-09 accepting the

01:37:51.200 --> 01:37:55.840
dedication of public infrastructure on Highland Drive and Lake Drive. The issue is should the

01:37:55.840 --> 01:38:01.440
Common Council approve resolution 2026-09 accepting the dedication of rectangular

01:38:01.440 --> 01:38:06.400
rapid flashing beacons from vantage data centers management LLC and the staff is

01:38:06.400 --> 01:38:14.240
recommending approval of resolution 2026-09. Roger. All right. We're going to start tonight.

01:38:16.640 --> 01:38:22.240
One of the conditions that that we put on advantage when they were they were doing work on Lake

01:38:22.240 --> 01:38:30.400
Drive and then this also included Highland Drive and it was in the overall language also from

01:38:30.400 --> 01:38:36.880
DOT for all the other intersections they were doing was that they put these rapid flashing beacons

01:38:37.680 --> 01:38:44.880
where the inner urban crosses roads in their jurisdiction. I guess so they've installed

01:38:44.880 --> 01:38:51.840
the rapid flashing beacons. They've been inspected. They're operating and since they're in the city

01:38:51.840 --> 01:38:58.320
right away they essentially they are handing those beacons over to us.

01:39:00.160 --> 01:39:06.000
Roger, I had a question and it may have been reviewed in committee but is there an anticipated

01:39:08.240 --> 01:39:12.800
liability to the city for costs for maintenance of this down the road and do we know what that is

01:39:12.800 --> 01:39:18.960
and is it significant? It would be relatively minor. I mean we have these rapid flashing beacons

01:39:18.960 --> 01:39:23.680
in other places in the city and at this point the maintenance cost in them has been nailed but

01:39:23.680 --> 01:39:29.360
I imagine at some point in time the LED lights change us over panel or new lights.

01:39:30.160 --> 01:39:34.640
Thank you for that. Other questions? Otherwise is there anyone willing to make a motion?

01:39:34.640 --> 01:39:37.600
I will move to approve. There's a motion to approve. Is there a second?

01:39:38.880 --> 01:39:43.440
Moved and seconded. Any questions or concerns on that motion? Seeing none all in favor signify

01:39:43.440 --> 01:39:46.880
by saying aye. Opposed? All right that motion carries.

01:39:48.960 --> 01:39:54.320
That takes us into consideration a possible action to approve resolution 2026-10 a resolution

01:39:54.320 --> 01:39:58.800
for inclusion under the Wisconsin Public Employers Group Health Insurance Program.

01:39:59.520 --> 01:40:03.360
The issue is should the Common Council approve a resolution authorizing the City of Port

01:40:03.360 --> 01:40:08.880
Washington to pursue participation in the Wisconsin Public Employers Group Health Insurance Program

01:40:08.880 --> 01:40:17.440
specifically the high deductible health plan HMO standard HDHP PPO without dental P17 subject

01:40:17.440 --> 01:40:23.200
to receipt and acceptance of the final underwriting results and rates. Staff recommends council approve

01:40:23.200 --> 01:40:27.760
the resolution authorizing the City to pursue participation in the Wisconsin Public Employers

01:40:27.760 --> 01:40:32.000
Group Health Insurance Program subject to the conditions outlined in the resolution.

01:40:33.280 --> 01:40:39.040
Susan are you taking this one or Matt? Robin? Actually I'm sorry I didn't know Robin was here.

01:40:39.040 --> 01:40:44.960
If you have any questions? Yes. Does anyone have any questions for this? I didn't see you over there.

01:40:44.960 --> 01:40:54.160
Sorry. Any questions about the move? Just clarification this is strictly approval to investigate

01:40:54.160 --> 01:41:00.400
the advantages or disadvantages right it's not approving a plan okay then I will move to approve.

01:41:00.960 --> 01:41:05.360
There is a motion to approve is there a second? There is a second. Any questions or concerns on

01:41:05.360 --> 01:41:11.360
that motion? Seeing none all in favor signify by saying aye. Opposed? Motion carries.

01:41:12.160 --> 01:41:16.080
Thank you for staying tonight Robin. The next agenda item is consideration

01:41:16.080 --> 01:41:22.160
possible action and denial of claim by Nadia Petnam. Sorry.

01:41:23.440 --> 01:41:28.400
Should there's the notice of claim damages presented to the City by Nadia pursuant to Wisconsin

01:41:28.400 --> 01:41:37.600
State Statute 893. I'm sorry 893.80 B disallowed. Staff recommends to disallow the notice of

01:41:37.600 --> 01:41:43.920
claim by Nadia upon advice of counsel. Mr. Nugent. Thank you. This was a claim that the

01:41:43.920 --> 01:41:51.600
City received essentially for a slip and fall on a sidewalk. This was tendered to Sivmic.

01:41:51.600 --> 01:41:56.720
They conduct an investigation and they are recommending disallowance. That's staff's recommendation as

01:41:56.720 --> 01:42:03.840
well. Who is Sivmic? Sivmic is our is the City's insurer. Thank you. Any questions on this?

01:42:03.840 --> 01:42:10.960
Anyone willing to make a motion? I'll make a motion to disallow the notice of claim.

01:42:12.160 --> 01:42:14.960
There's a motion and a second. Any questions or concerns on the motion?

01:42:15.600 --> 01:42:21.040
Seeing none all in favor signify by saying aye. Opposed? All right. Motion carries.

01:42:21.040 --> 01:42:25.280
The second agenda or last agenda item then is consideration and possible action on

01:42:25.280 --> 01:42:31.280
claim for damages against the City by Noel Kelly. The issue is should the notice of claim for

01:42:31.280 --> 01:42:39.120
damages presented by to the City by Noel Kelly pursuant to Wisconsin State Statute 893.80

01:42:39.120 --> 01:42:45.120
B disallowed. The staff is recommending to disallow the claim upon advice of counsel. Mr. Nugent.

01:42:46.080 --> 01:42:50.800
This is extremely similar to the last agenda item. Again, the City received a notice of claim

01:42:51.840 --> 01:42:59.600
for the claimant was injured in a slip and fall incident on sidewalk. The claim was sent to Sivmic

01:42:59.600 --> 01:43:05.280
who again conduct an investigation and is recommending this allowance of the claim. Staff is also

01:43:05.280 --> 01:43:12.800
recommending that the City disallow the notice of claim. Any questions or concerns? I'll make a

01:43:12.800 --> 01:43:19.680
motion to disallow the notice of claim. The motion is there a second? Second. Second. Any questions or

01:43:19.680 --> 01:43:26.000
concerns on the motion? All right. Seeing none all in favor signify by saying aye. Opposed?

01:43:26.640 --> 01:43:31.920
Motion carries. The last agenda item is to adjourn. Is there no one willing to make a motion to adjourn?

01:43:31.920 --> 01:43:37.040
Second. There's a motion to adjourn and is moved and seconded. All in favor signify by saying aye.

01:43:37.680 --> 01:43:41.920
Opposed? This meeting is adjourned. Go Pirates.
