1
00:00:00,880 --> 00:00:04,320
I call to order the September 8th,

2
00:00:04,320 --> 00:00:06,920
2026 City of Port Washington,

3
00:00:06,920 --> 00:00:10,220
Board of Public Works meeting to order.

4
00:00:11,960 --> 00:00:13,840
Chairman Gaspard is not able to make it tonight,

5
00:00:13,840 --> 00:00:15,160
so I'm filling in for him.

6
00:00:15,160 --> 00:00:18,980
Also not in attendance is Mr. Brooks.

7
00:00:20,920 --> 00:00:23,120
I guess item two is to approve the minutes

8
00:00:23,120 --> 00:00:24,800
from the previous meeting.

9
00:00:24,800 --> 00:00:29,000
That would be August 25th, 2026.

10
00:00:29,000 --> 00:00:31,680
Any questions or comments on those minutes?

11
00:00:31,680 --> 00:00:33,720
No, but I'll make a motion to approve the minutes

12
00:00:33,720 --> 00:00:34,880
as written.

13
00:00:34,880 --> 00:00:37,680
All right, a motion by older woman Miller.

14
00:00:37,680 --> 00:00:38,520
I have a second.

15
00:00:38,520 --> 00:00:39,560
Second.

16
00:00:39,560 --> 00:00:41,000
Second by Mr. Paulie.

17
00:00:41,000 --> 00:00:42,120
All in favor.

18
00:00:42,120 --> 00:00:42,960
All right.

19
00:00:45,200 --> 00:00:48,760
Agenda item number three, public comments and appearances.

20
00:00:48,760 --> 00:00:50,680
Anybody wishing to address the board

21
00:00:50,680 --> 00:00:54,120
can step to the podium, address your name,

22
00:00:54,120 --> 00:00:55,920
state your name, address,

23
00:00:55,920 --> 00:00:58,120
and you have three minutes to speak.

24
00:00:59,840 --> 00:01:03,200
Any publics, public comments?

25
00:01:04,240 --> 00:01:05,080
No.

26
00:01:06,280 --> 00:01:11,280
Seeing none, we'll move to item number four.

27
00:01:11,560 --> 00:01:15,600
Presentation of kid number five, project planning.

28
00:01:15,600 --> 00:01:16,440
Kapoor.

29
00:01:29,840 --> 00:01:31,000
Thank you.

30
00:01:48,200 --> 00:01:50,280
I think we're all set here.

31
00:01:53,160 --> 00:01:55,600
Thank you everybody for having us back up.

32
00:01:55,600 --> 00:01:57,000
My name is Ben Wood.

33
00:01:57,000 --> 00:01:58,440
I'm with Strand Associates.

34
00:01:58,440 --> 00:02:01,520
I recognize Aaron Grohl from Kapoor.

35
00:02:01,520 --> 00:02:03,200
We're here tonight to give you an update

36
00:02:03,200 --> 00:02:07,120
on the overall TID 5 project plan.

37
00:02:07,120 --> 00:02:12,120
We were back in front of you last, back in April,

38
00:02:12,600 --> 00:02:15,200
kind of laying out a plan for you.

39
00:02:15,200 --> 00:02:17,760
Part of that plan talked about how important it was

40
00:02:17,760 --> 00:02:19,520
to coordinate and work together

41
00:02:19,520 --> 00:02:21,760
across the community here.

42
00:02:21,760 --> 00:02:24,880
Tonight's presentation is a follow up on that

43
00:02:24,880 --> 00:02:27,920
now that the projects have some more definition

44
00:02:27,960 --> 00:02:32,800
to them, it's a good time to provide an update to the board.

45
00:02:32,800 --> 00:02:36,480
And of course, we recognize that we're still striving

46
00:02:36,480 --> 00:02:41,080
to work with the city to partner across departments

47
00:02:41,080 --> 00:02:44,840
and whether it's businesses or outside entities

48
00:02:44,840 --> 00:02:46,800
that are affected by these projects

49
00:02:46,800 --> 00:02:51,800
to coordinate often regarding this plan.

50
00:02:52,120 --> 00:02:55,720
So tonight we're going to just touch very briefly

51
00:02:55,720 --> 00:02:58,600
on an overview of the TID project plan.

52
00:02:58,600 --> 00:03:01,360
We'll look at a broad project map and schedule.

53
00:03:01,360 --> 00:03:03,280
And then we're going to go through each

54
00:03:03,280 --> 00:03:07,080
of the forthcoming projects, kind of one by one

55
00:03:07,080 --> 00:03:10,680
to give you some details on their scope and schedule.

56
00:03:10,680 --> 00:03:12,560
And we'll wrap up with a summary.

57
00:03:13,920 --> 00:03:17,320
So all of the projects here are identified

58
00:03:17,320 --> 00:03:20,200
in the TID 5 project plan.

59
00:03:20,200 --> 00:03:23,680
Reminder that TID 5 is a developer finance TID.

60
00:03:23,720 --> 00:03:28,720
The developer is at risk for the financing of this plan.

61
00:03:28,960 --> 00:03:32,040
That includes approximately $180 million

62
00:03:32,040 --> 00:03:34,600
of city led projects.

63
00:03:34,600 --> 00:03:38,160
The basis of the project need in the TID project plan

64
00:03:38,160 --> 00:03:41,880
includes, of course, the expanded service area,

65
00:03:41,880 --> 00:03:44,400
but also redundancy and resiliency projects

66
00:03:44,400 --> 00:03:48,800
within the existing city and its infrastructure and capacity.

67
00:03:50,360 --> 00:03:53,600
This map you'll recognize from a lot of meetings

68
00:03:53,600 --> 00:03:55,920
in the past, but I just want to break it down.

69
00:03:55,920 --> 00:04:00,760
This is the overall map of the city led TID projects.

70
00:04:00,760 --> 00:04:03,800
Of course, in the upper portion of the map,

71
00:04:03,800 --> 00:04:06,800
we have the yellow and the pink.

72
00:04:06,800 --> 00:04:09,160
Those are the vantage-owned lands

73
00:04:09,160 --> 00:04:13,080
and the yellow is what's under construction right now.

74
00:04:13,080 --> 00:04:16,200
The blue areas, kind of toward the southern portion

75
00:04:16,200 --> 00:04:18,880
of that are the Canalesville obligation areas

76
00:04:18,880 --> 00:04:21,080
where the city has agreed to provide

77
00:04:21,080 --> 00:04:23,760
municipal utility service.

78
00:04:23,760 --> 00:04:26,680
The green areas that kind of surround that are areas

79
00:04:26,680 --> 00:04:30,760
that the Southeastern Wisconsin Regional Planning Commission

80
00:04:30,760 --> 00:04:34,080
encourage the city to include as ancillary areas

81
00:04:34,080 --> 00:04:38,320
that may have potential for future development

82
00:04:38,320 --> 00:04:41,600
that could also connect to municipal utilities

83
00:04:41,600 --> 00:04:44,560
sometime down the road.

84
00:04:44,560 --> 00:04:47,800
And then individual projects on this map,

85
00:04:47,800 --> 00:04:49,760
I guess I'll point over here.

86
00:04:49,760 --> 00:04:51,920
These are all numbered by project year

87
00:04:51,920 --> 00:04:55,480
and they're kind of grouped together by color and purpose.

88
00:04:55,480 --> 00:04:59,000
And I know this is kind of hard to understand

89
00:04:59,000 --> 00:05:01,240
and digest individual projects on this,

90
00:05:01,240 --> 00:05:04,680
but we'll get through each of these sort of one by one.

91
00:05:04,680 --> 00:05:08,160
But generally speaking, we have projects associated

92
00:05:08,160 --> 00:05:12,400
with the TID 5 development site up here to serve that.

93
00:05:12,400 --> 00:05:16,720
We have projects that are within the existing cities,

94
00:05:16,720 --> 00:05:19,080
service area and realm of infrastructure

95
00:05:19,080 --> 00:05:23,880
that need to be addressed in order to improve service

96
00:05:23,880 --> 00:05:26,320
to that area that are in this plan.

97
00:05:29,120 --> 00:05:32,720
A new portion of this since April is an overall

98
00:05:32,720 --> 00:05:36,360
Gantt chart of how all of these projects

99
00:05:36,360 --> 00:05:38,240
and their schedules align.

100
00:05:39,400 --> 00:05:42,200
There's a lot going on here and this is,

101
00:05:42,200 --> 00:05:44,200
I'm showing this now to kind of set the table

102
00:05:44,200 --> 00:05:46,720
for going through these one by one.

103
00:05:46,720 --> 00:05:48,720
But I wanted to start with this overall summary

104
00:05:48,880 --> 00:05:51,880
but for now what I want you to understand is legend.

105
00:05:51,880 --> 00:05:54,640
The overall project arrow here just represents

106
00:05:54,640 --> 00:05:58,120
the entire project length starting at design

107
00:05:58,120 --> 00:06:02,120
and permitting all the way through final completion.

108
00:06:02,120 --> 00:06:05,720
The star on that Gantt chart represents

109
00:06:05,720 --> 00:06:08,720
the construction contract award

110
00:06:08,720 --> 00:06:12,520
and then the hatched lines here

111
00:06:12,520 --> 00:06:17,520
represents when active construction will be going on.

112
00:06:19,480 --> 00:06:22,080
So the first three projects at the top

113
00:06:22,080 --> 00:06:25,800
are utility extensions intended to serve

114
00:06:25,800 --> 00:06:29,480
the vantage lands that are under development right now.

115
00:06:29,480 --> 00:06:31,840
The black and gray projects in the middle

116
00:06:31,840 --> 00:06:34,080
are projects that are more internal

117
00:06:34,080 --> 00:06:36,560
to the city's existing infrastructure,

118
00:06:36,560 --> 00:06:40,560
including wastewater treatment, plant planning,

119
00:06:40,560 --> 00:06:42,880
water projects, some interceptor work,

120
00:06:42,880 --> 00:06:45,360
the Valley Creek restoration.

121
00:06:45,360 --> 00:06:48,680
The pink projects here represent three different phases

122
00:06:48,720 --> 00:06:52,640
of the interceptor that needs to be upsized

123
00:06:52,640 --> 00:06:55,080
at the downstream point of the vantage lands

124
00:06:55,080 --> 00:06:57,120
all the way to the wastewater treatment plant

125
00:06:57,120 --> 00:07:00,240
and how that's getting phased over multiple years

126
00:07:00,240 --> 00:07:02,720
and multiple bid packages.

127
00:07:02,720 --> 00:07:04,800
The two different types of blue projects

128
00:07:04,800 --> 00:07:07,960
or the two different shades of blue projects down here,

129
00:07:07,960 --> 00:07:10,720
they represent utility looping around

130
00:07:10,720 --> 00:07:12,800
the existing vantage lands

131
00:07:12,800 --> 00:07:17,280
as does the last project, the Brown project down here.

132
00:07:17,280 --> 00:07:18,800
Those all have this note that those

133
00:07:18,800 --> 00:07:21,720
are development dependent right now.

134
00:07:21,720 --> 00:07:25,920
We're trying to get through these most urgent projects

135
00:07:25,920 --> 00:07:29,960
to get them a minimum level of service

136
00:07:29,960 --> 00:07:33,320
and then depending on how adjacent lands

137
00:07:33,320 --> 00:07:36,440
could potentially specifically develop

138
00:07:36,440 --> 00:07:39,320
might kind of shape how the schedule

139
00:07:39,320 --> 00:07:43,280
and the planning of those final looping projects

140
00:07:43,280 --> 00:07:46,300
are how those come to pass.

141
00:07:48,080 --> 00:07:50,480
With that, we're gonna get into these kind of one by one

142
00:07:50,480 --> 00:07:52,120
and I'm gonna turn it over to Aaron

143
00:07:52,120 --> 00:07:53,880
to talk about the first project.

144
00:07:55,520 --> 00:07:56,360
Thanks, Ben.

145
00:07:57,360 --> 00:07:58,200
Good evening, everybody.

146
00:07:58,200 --> 00:08:00,000
Thanks again for having us.

147
00:08:00,000 --> 00:08:03,960
So this slide should be familiar to you

148
00:08:03,960 --> 00:08:07,520
other than a few updates, basically the schedule.

149
00:08:07,520 --> 00:08:09,880
So this was bid outs just recently

150
00:08:09,880 --> 00:08:14,880
and prices were submitted by contractors for this 26-1,

151
00:08:15,000 --> 00:08:16,880
which is Highland Drive utilities.

152
00:08:16,880 --> 00:08:18,880
It's about 8,000 feet of water main

153
00:08:18,880 --> 00:08:20,880
and 3,000 feet of sanitary sewer

154
00:08:20,880 --> 00:08:22,880
and it's to serve the sewer and water

155
00:08:22,880 --> 00:08:24,880
for the Canalsville area.

156
00:08:26,880 --> 00:08:31,880
We're also looping on the south to the south connection point

157
00:08:31,880 --> 00:08:36,880
within the city and serving the obligation areas

158
00:08:36,880 --> 00:08:39,880
part of the inter municipal agreement

159
00:08:39,880 --> 00:08:41,880
between the city and the town.

160
00:08:42,880 --> 00:08:46,880
Bids were received as I just stated a few weeks ago

161
00:08:46,880 --> 00:08:51,880
and the intent is to recommend for award this October

162
00:08:52,880 --> 00:08:57,880
upon internal reviews between staff, city staff,

163
00:08:58,880 --> 00:09:01,880
the consultants and also the attorneys.

164
00:09:02,880 --> 00:09:06,880
The intent for this project is likely to start up

165
00:09:06,880 --> 00:09:10,880
in as early as January, but most likely would start up

166
00:09:10,880 --> 00:09:15,880
in March in 2027 with completion

167
00:09:16,120 --> 00:09:19,640
and towards the end of next year.

168
00:09:19,640 --> 00:09:24,640
This is however subject to DNR and PSC approvals

169
00:09:25,440 --> 00:09:28,560
which they are in the works as we speak.

170
00:09:32,480 --> 00:09:36,680
26-2, similar to 26-1.

171
00:09:36,680 --> 00:09:41,360
So this is the northern portion to serve

172
00:09:41,360 --> 00:09:44,240
the north side of the vantage site

173
00:09:44,240 --> 00:09:47,520
that runs up KW up to Lake Drive.

174
00:09:47,520 --> 00:09:51,680
This is just water main and we're attending

175
00:09:51,680 --> 00:09:56,080
on installing these in trenchless methods

176
00:09:56,080 --> 00:09:59,120
to minimize amount of construction impacts

177
00:09:59,120 --> 00:10:01,720
and traffic impacts to the property owners

178
00:10:01,720 --> 00:10:03,680
along this stretch.

179
00:10:03,680 --> 00:10:06,480
Also adding metering vaults, pressure-reducing

180
00:10:06,480 --> 00:10:09,560
station and automatic flushing hydrants

181
00:10:09,560 --> 00:10:12,280
for this project as well.

182
00:10:12,280 --> 00:10:15,920
Again, the purpose of this is to loop the water

183
00:10:15,920 --> 00:10:18,280
all the way to the northern connection point

184
00:10:18,280 --> 00:10:20,720
for the development and to serve

185
00:10:20,720 --> 00:10:23,480
Knesswell obligation area as well.

186
00:10:24,640 --> 00:10:28,880
Similar to 26-1, bids were received a few weeks ago.

187
00:10:29,920 --> 00:10:32,440
We're under review as we speak

188
00:10:32,440 --> 00:10:36,320
and we anticipate bringing that to the Board of Public Works

189
00:10:36,320 --> 00:10:39,800
next month for recommending award

190
00:10:39,800 --> 00:10:43,360
assuming our review suggests so.

191
00:10:44,360 --> 00:10:49,360
Again, this as well is pending DNR and PSC approvals.

192
00:10:51,800 --> 00:10:53,880
The construction schedule for this

193
00:10:53,880 --> 00:10:57,320
likely would start up in January of next year

194
00:10:57,320 --> 00:11:02,320
and would run into late spring, early summer.

195
00:11:06,320 --> 00:11:11,040
So key considerations that we identified

196
00:11:11,040 --> 00:11:14,480
through these projects, we worked hand-in-hand

197
00:11:14,480 --> 00:11:19,480
with the DOT, Ozaki County, the town,

198
00:11:21,000 --> 00:11:24,720
the vantage development and we wanted to make sure

199
00:11:24,720 --> 00:11:27,040
that we address traffic.

200
00:11:27,040 --> 00:11:31,160
Traffic was a big issue to ensure that we can route

201
00:11:32,160 --> 00:11:33,800
the residents that live in this area,

202
00:11:33,800 --> 00:11:37,040
businesses that are in this area around the site

203
00:11:37,040 --> 00:11:42,040
and that these projects combine with vantage traffic

204
00:11:42,920 --> 00:11:44,280
that they will flow together.

205
00:11:44,280 --> 00:11:47,800
So we worked hard together with the vantage staff

206
00:11:47,800 --> 00:11:50,840
and their team to ensure that these traffic patterns

207
00:11:50,840 --> 00:11:53,400
work with what they're intending on doing

208
00:11:53,400 --> 00:11:55,800
and try to minimize the impacts to the city

209
00:11:55,800 --> 00:11:59,040
and also the town residents and the county residents.

210
00:11:59,040 --> 00:12:01,320
So the traffic routes that you see here

211
00:12:01,320 --> 00:12:02,760
are detour routes.

212
00:12:02,760 --> 00:12:06,080
Again, these have already been approved by the DOT

213
00:12:06,080 --> 00:12:08,480
and the county and the town as well

214
00:12:08,480 --> 00:12:10,880
in our coordination efforts and trying to make sure

215
00:12:10,880 --> 00:12:13,320
that we're all on the same page.

216
00:12:18,120 --> 00:12:21,200
So the next step, the next project is 27-2

217
00:12:21,200 --> 00:12:22,680
which is County Trunk Highway H.

218
00:12:22,680 --> 00:12:27,680
So this is the next phase to serve Canalsville

219
00:12:28,160 --> 00:12:30,480
in the obligation area.

220
00:12:30,480 --> 00:12:34,600
This basically is from the intersection of KW and H

221
00:12:34,600 --> 00:12:39,600
and it runs to the Northwest from the intersection.

222
00:12:41,560 --> 00:12:44,520
We're about 2,500 feet or 2,400 feet of water main,

223
00:12:44,520 --> 00:12:47,000
1,800 feet of sanitary sewer.

224
00:12:47,000 --> 00:12:49,440
As I just stated, it's to serve the Canalsville

225
00:12:49,440 --> 00:12:52,760
obligation area and also create a connection

226
00:12:52,760 --> 00:12:57,760
between a water main connection between County Trunk KW

227
00:12:58,200 --> 00:13:03,200
and County Trunk H to improve water flow

228
00:13:03,560 --> 00:13:05,240
and service for the residents

229
00:13:05,240 --> 00:13:07,960
and the property owners in this area.

230
00:13:07,960 --> 00:13:10,080
We're currently designing this project.

231
00:13:11,280 --> 00:13:13,680
We are anticipating on going out to bid

232
00:13:13,680 --> 00:13:17,640
with this late in 2026 or early 27

233
00:13:17,640 --> 00:13:20,400
with construction in 2027.

234
00:13:21,600 --> 00:13:25,720
Permits have not been submitted for this stretch yet.

235
00:13:25,720 --> 00:13:28,680
So they'll be submitted once we get a little bit further

236
00:13:28,680 --> 00:13:30,360
along in our design.

237
00:13:32,520 --> 00:13:35,440
Aaron, can you tell everybody what the Canalsville

238
00:13:35,440 --> 00:13:38,800
obligation area is or what it means?

239
00:13:38,800 --> 00:13:40,880
So let me go back here real quick.

240
00:13:42,440 --> 00:13:45,880
So the Canalsville obligation area has been stated earlier.

241
00:13:45,880 --> 00:13:49,440
It's in blue and I know you can't, it's hard to see

242
00:13:49,440 --> 00:13:54,440
but there's the annexation of the area that's in yellow

243
00:13:54,880 --> 00:13:58,400
and pink that was town and now is city.

244
00:13:59,480 --> 00:14:02,920
The agreement was to between the town and the city

245
00:14:02,920 --> 00:14:07,920
was to serve water and sewer to the town of Canalsville.

246
00:14:08,680 --> 00:14:10,560
So the town of Canalsville is actually

247
00:14:10,560 --> 00:14:12,120
the town of Port Washington.

248
00:14:12,120 --> 00:14:14,720
It's a portion of the town of Port Washington.

249
00:14:14,720 --> 00:14:19,000
And in order for this agreement to move forward,

250
00:14:20,000 --> 00:14:23,120
water and sewer being extended first to the area,

251
00:14:23,160 --> 00:14:26,040
the larger blue area that's to the left,

252
00:14:26,040 --> 00:14:31,040
which holy is running up and down KW and H

253
00:14:31,680 --> 00:14:35,000
and then also a little bit left on Mink Ranch Road.

254
00:14:35,000 --> 00:14:37,000
And then the second area, which is a small

255
00:14:37,000 --> 00:14:40,840
sliver along Konechunk Highway LL

256
00:14:40,840 --> 00:14:43,720
as you're heading to the northeast.

257
00:14:43,720 --> 00:14:46,640
That's another area that is also within the town

258
00:14:46,640 --> 00:14:48,080
of Canalsville.

259
00:14:48,080 --> 00:14:51,520
That has been agreed upon to be served in the future

260
00:14:51,520 --> 00:14:56,520
as that section of that portion of the service area develops.

261
00:15:00,240 --> 00:15:02,440
Okay, all right, sure.

262
00:15:06,280 --> 00:15:09,280
All right, from that, I'm gonna turn this back over to Ben.

263
00:15:10,800 --> 00:15:11,640
Thank you.

264
00:15:13,280 --> 00:15:16,560
Wastewater treatment planning, the schedule,

265
00:15:16,560 --> 00:15:20,080
this doesn't have any construction associated with it

266
00:15:20,080 --> 00:15:22,240
on that little bar chart at the top there,

267
00:15:22,240 --> 00:15:27,240
but both wastewater treatment plant facility plan

268
00:15:27,240 --> 00:15:30,960
and a sanitary sewer service area updates

269
00:15:30,960 --> 00:15:33,840
are happening concurrently right now

270
00:15:33,840 --> 00:15:36,160
and they're expected to be completed

271
00:15:36,160 --> 00:15:38,360
toward the middle of next year.

272
00:15:38,360 --> 00:15:40,760
So shown on the left there is obviously

273
00:15:40,760 --> 00:15:44,400
the footprint of the wastewater treatment plant.

274
00:15:44,400 --> 00:15:48,720
You can see that reality comes at a premium down here.

275
00:15:48,720 --> 00:15:50,680
It's kind of running out of space.

276
00:15:50,680 --> 00:15:55,760
DNR requires that as you're approaching 80% of plant capacity

277
00:15:55,760 --> 00:16:00,000
that you have to go through what they call a facility plan

278
00:16:00,000 --> 00:16:02,720
to proactively review options

279
00:16:02,720 --> 00:16:05,640
for how you would expand your treatment processes

280
00:16:05,640 --> 00:16:08,160
within your existing plant footprint

281
00:16:08,160 --> 00:16:11,720
or how you might expand the plant

282
00:16:12,760 --> 00:16:16,600
in order to address capacity.

283
00:16:16,600 --> 00:16:20,480
So far, based on the flows that Vantage has given us,

284
00:16:20,480 --> 00:16:24,080
we're not expecting that a capacity expansion will be warranted,

285
00:16:24,080 --> 00:16:26,960
but again, we're going through this process proactively

286
00:16:28,800 --> 00:16:33,120
just to follow the DNR guidelines in that regard.

287
00:16:33,120 --> 00:16:35,720
Part of that includes reviewing options

288
00:16:35,720 --> 00:16:37,920
for how the plant would be expanded

289
00:16:37,920 --> 00:16:41,240
if extra capacity was needed.

290
00:16:41,240 --> 00:16:44,520
The image on the right shows the service area.

291
00:16:44,560 --> 00:16:47,320
Again, it's got that same composition of the yellow

292
00:16:47,320 --> 00:16:49,680
and the pink being the Vantage lands,

293
00:16:49,680 --> 00:16:52,240
the blue being the Canalsville obligation

294
00:16:52,240 --> 00:16:54,320
and green being those adjacent lands

295
00:16:54,320 --> 00:16:58,160
that the Regional Planning Commission asked the city

296
00:16:58,160 --> 00:17:02,880
to include that sewer service area update

297
00:17:02,880 --> 00:17:06,080
is actually a process that is led by sewer pack

298
00:17:06,080 --> 00:17:10,200
or Southeastern Wisconsin Regional Planning Commission.

299
00:17:10,200 --> 00:17:12,280
It's led by sewer pack staff

300
00:17:13,280 --> 00:17:17,880
and as far as we know, they are on track

301
00:17:17,880 --> 00:17:22,880
for a second quarter completion of that plan next year.

302
00:17:23,680 --> 00:17:27,160
This plan and the areas within it,

303
00:17:27,160 --> 00:17:30,640
sewer pack has to approve this service area

304
00:17:30,640 --> 00:17:34,880
before sanitary sewers can be indeed installed

305
00:17:34,880 --> 00:17:38,040
and permitted by DNR to kind of serve the rest

306
00:17:38,040 --> 00:17:39,520
of the areas beyond that.

307
00:17:39,520 --> 00:17:42,280
So what's included right now is all

308
00:17:42,280 --> 00:17:45,600
of the Canalsville obligation area,

309
00:17:45,600 --> 00:17:47,440
all of the yellow lands,

310
00:17:47,440 --> 00:17:49,920
and then it's the pink and the green

311
00:17:49,920 --> 00:17:53,640
that are kind of subject to sewer packs update right now.

312
00:17:56,440 --> 00:17:58,680
The next one, this is kind of a busy slide,

313
00:17:58,680 --> 00:18:00,680
but it's an important project for the city.

314
00:18:00,680 --> 00:18:02,880
It's the Water Booster Station,

315
00:18:02,880 --> 00:18:06,960
Water Distribution Facility and the Associated Water Means.

316
00:18:06,960 --> 00:18:09,200
So I'm gonna ask you to just focus on the pictures

317
00:18:09,200 --> 00:18:10,040
first.

318
00:18:10,040 --> 00:18:12,000
So on the upper left here we have one

319
00:18:12,000 --> 00:18:14,120
of the existing two booster stations

320
00:18:14,120 --> 00:18:16,440
that are out in the distribution system.

321
00:18:16,440 --> 00:18:18,240
This is the Oakland Station.

322
00:18:19,800 --> 00:18:22,280
Stray and conducted a water system master plan

323
00:18:22,280 --> 00:18:25,240
and facility condition assessment of this

324
00:18:25,240 --> 00:18:30,240
and presented the findings of that to the Public Works Board.

325
00:18:30,840 --> 00:18:33,280
I believe both in January and in March

326
00:18:34,240 --> 00:18:36,400
that these existing two,

327
00:18:36,400 --> 00:18:38,480
both the Oakland and Sunset stations

328
00:18:38,480 --> 00:18:40,000
that are out in the system,

329
00:18:40,000 --> 00:18:42,760
are aged beyond their useful life.

330
00:18:42,760 --> 00:18:45,400
One of the stations actually had a critical failure,

331
00:18:45,400 --> 00:18:48,120
I believe that was last year in 2025.

332
00:18:49,200 --> 00:18:53,800
And it's very important that those booster stations

333
00:18:53,800 --> 00:18:55,120
be replaced.

334
00:18:55,120 --> 00:18:57,720
Our master plan demonstrated the best way to do that

335
00:18:57,720 --> 00:19:00,880
is to build a brand new consolidated booster station.

336
00:19:02,360 --> 00:19:05,400
And we were asked as a followup

337
00:19:05,400 --> 00:19:08,920
to do a booster station sighting study.

338
00:19:08,920 --> 00:19:13,000
We reviewed seven potential sites throughout the city.

339
00:19:13,000 --> 00:19:15,240
The selected site is actually right next

340
00:19:15,240 --> 00:19:20,160
to the existing Oakland station still on Oakland Avenue.

341
00:19:20,160 --> 00:19:25,160
And then the larger map down here on the bottom shows

342
00:19:25,160 --> 00:19:28,720
that along with a upsized and consolidated booster station,

343
00:19:28,720 --> 00:19:31,920
the yellow path shows the route that we're proposing

344
00:19:32,080 --> 00:19:35,880
that water mains be replaced with a larger diameter main

345
00:19:35,880 --> 00:19:39,440
in order to have the carrying capacity

346
00:19:39,440 --> 00:19:43,440
that those pumps can put out through that station.

347
00:19:44,360 --> 00:19:47,640
Now this route has a couple of jogs in it

348
00:19:47,640 --> 00:19:50,320
and part of that is taking into account

349
00:19:50,320 --> 00:19:53,160
the condition of the existing water mains.

350
00:19:53,160 --> 00:19:56,120
And we tried to route the water mains along areas

351
00:19:56,120 --> 00:19:58,680
that have other needs anyways

352
00:19:58,680 --> 00:20:00,760
where the existing water main has experienced

353
00:20:00,760 --> 00:20:03,480
a lot of breaks or potentially has led service lines,

354
00:20:03,480 --> 00:20:04,560
et cetera.

355
00:20:04,560 --> 00:20:07,000
And that just helps kind of

356
00:20:07,000 --> 00:20:09,360
economize the project and get the highest return

357
00:20:09,360 --> 00:20:11,440
on investment for the project scope.

358
00:20:12,360 --> 00:20:15,840
So included in the scope would be a new booster station.

359
00:20:15,840 --> 00:20:19,080
We would demolish the Oakland and sudden set stations

360
00:20:19,080 --> 00:20:22,920
relay approximately 6,000 feet of water main.

361
00:20:22,920 --> 00:20:25,760
And then also what those past master plan

362
00:20:25,760 --> 00:20:29,440
and sighting studies considered was that the water

363
00:20:29,480 --> 00:20:34,480
department is in need of a new distribution garage facility.

364
00:20:34,960 --> 00:20:38,000
We talked in the past that due to the current

365
00:20:38,000 --> 00:20:40,960
and almost completed capacity expansion

366
00:20:40,960 --> 00:20:42,200
at the water plant right now,

367
00:20:42,200 --> 00:20:45,560
they actually lost garage spaces

368
00:20:45,560 --> 00:20:49,240
as part of that construction project.

369
00:20:49,240 --> 00:20:52,120
They're in desperate need of room for equipment,

370
00:20:52,120 --> 00:20:53,680
materials, et cetera.

371
00:20:54,560 --> 00:20:56,680
And again, that booster station,

372
00:20:56,680 --> 00:20:59,760
this water main and that distribution facility,

373
00:20:59,760 --> 00:21:02,320
are projects that are in the TID project plan

374
00:21:02,320 --> 00:21:04,440
and will be funded through the TID.

375
00:21:05,520 --> 00:21:08,920
So understood that the city is still looking at

376
00:21:08,920 --> 00:21:12,160
high level options as to whether or not

377
00:21:12,160 --> 00:21:14,880
it makes sense to put that station at this site

378
00:21:14,880 --> 00:21:17,400
or consolidated at a different site

379
00:21:17,400 --> 00:21:19,240
apart from the booster station.

380
00:21:21,840 --> 00:21:23,040
The purpose of the project,

381
00:21:23,040 --> 00:21:25,600
this booster station pressurizes the high zone.

382
00:21:25,600 --> 00:21:29,920
So if you take a look at this upper middle graphic right here,

383
00:21:29,920 --> 00:21:34,200
this graphic is covered colored by the different pressure zones.

384
00:21:34,200 --> 00:21:36,920
The water plant pumps into the main zone,

385
00:21:36,920 --> 00:21:41,320
which is shaded in purple and then booster pumps

386
00:21:41,320 --> 00:21:45,320
pressurized that to even a higher hydraulic grade

387
00:21:45,320 --> 00:21:48,920
up to the green area, which is the high zone.

388
00:21:48,920 --> 00:21:52,560
And TID 5 is indeed in that high pressure zone.

389
00:21:52,560 --> 00:21:55,240
At project completion, that zone will be pressurized

390
00:21:55,240 --> 00:21:58,720
by dedicated pumps at the water plant

391
00:21:58,720 --> 00:22:00,560
and a dedicated transmission main

392
00:22:00,560 --> 00:22:02,600
that currently pump up there.

393
00:22:02,600 --> 00:22:04,760
And then this booster station will provide

394
00:22:04,760 --> 00:22:08,040
the required redundancy to work together

395
00:22:08,040 --> 00:22:10,560
with the pumps at the plant to make sure

396
00:22:10,560 --> 00:22:14,240
that zone is constantly pressurized.

397
00:22:14,240 --> 00:22:18,800
For project schedule, we expect design to start yet this year.

398
00:22:18,800 --> 00:22:21,720
Bidding would take place in 2027.

399
00:22:21,760 --> 00:22:25,360
We're anticipating approximately the third quarter.

400
00:22:25,360 --> 00:22:28,520
We understand due to the existing or past failure

401
00:22:28,520 --> 00:22:30,640
at the Oakland station, that booster station

402
00:22:30,640 --> 00:22:32,640
is kind of a critical need.

403
00:22:32,640 --> 00:22:35,520
We still have to go through public service commission approval

404
00:22:35,520 --> 00:22:38,320
on the project, things of that nature

405
00:22:38,320 --> 00:22:41,320
because we're talking about process and controls equipment.

406
00:22:41,320 --> 00:22:45,480
Some of those things require a more involved design

407
00:22:45,480 --> 00:22:47,000
and have longer lead times.

408
00:22:47,000 --> 00:22:50,240
And that's why you see kind of a schedule here

409
00:22:50,240 --> 00:22:53,520
with design taking approximately nine months

410
00:22:53,520 --> 00:22:58,040
and then construction starting by fourth quarter of next year

411
00:22:58,040 --> 00:23:00,760
and going all the way through 2028.

412
00:23:04,120 --> 00:23:05,440
That was a lot.

413
00:23:05,440 --> 00:23:06,440
Take a break here.

414
00:23:07,440 --> 00:23:09,560
Valley Creek restoration.

415
00:23:09,560 --> 00:23:12,520
So I know that Rob has been in front of the board

416
00:23:12,520 --> 00:23:15,760
in the past talking about this project as well.

417
00:23:15,760 --> 00:23:17,760
The scope is stream restoration

418
00:23:17,760 --> 00:23:20,440
and the overall Valley Creek restoration plan

419
00:23:20,440 --> 00:23:22,040
is shown in this map here.

420
00:23:23,000 --> 00:23:25,880
In the bar chart across the top,

421
00:23:25,880 --> 00:23:29,800
we're showing that Valley Creek has been under design.

422
00:23:30,760 --> 00:23:35,320
The city has partial funds for this project

423
00:23:35,320 --> 00:23:38,000
are identified in the TID project plan

424
00:23:38,000 --> 00:23:41,480
and they understand the city's expecting to hear back

425
00:23:41,480 --> 00:23:44,880
whether or not a grant application was successful.

426
00:23:44,880 --> 00:23:47,640
They're expecting to hear back on that in October.

427
00:23:47,640 --> 00:23:52,560
That funding will help to kind of dictate the schedule here

428
00:23:52,560 --> 00:23:55,360
and that's why we're just showing this phased over

429
00:23:55,360 --> 00:23:59,800
potentially several years depending on how the funding works out.

430
00:23:59,800 --> 00:24:03,280
So there will have to be, I'm sure more updates

431
00:24:03,280 --> 00:24:04,920
on this project will be forthcoming

432
00:24:04,920 --> 00:24:09,960
once the funding is understood better.

433
00:24:09,960 --> 00:24:12,800
The purpose of this and why it's in the TID project plan

434
00:24:12,800 --> 00:24:17,480
is it provides resiliency down at the treatment plant sites

435
00:24:17,720 --> 00:24:19,720
obviously the wastewater plant and water plants

436
00:24:19,720 --> 00:24:20,800
are right next to each other

437
00:24:20,800 --> 00:24:23,720
and they've experienced flooding in the past

438
00:24:23,720 --> 00:24:25,520
associated with Valley Creek.

439
00:24:27,040 --> 00:24:29,720
Key consideration here is that coordination

440
00:24:29,720 --> 00:24:32,240
between the design team that's working on this

441
00:24:32,240 --> 00:24:35,520
which is Stantec and then both Strand and Kapoor

442
00:24:35,520 --> 00:24:40,520
is ongoing as the interceptor relay projects

443
00:24:42,400 --> 00:24:44,680
kind of are in a shared corridor with this.

444
00:24:44,680 --> 00:24:46,200
So just know that we've already had

445
00:24:46,200 --> 00:24:50,200
some coordination meetings to try to optimize

446
00:24:50,200 --> 00:24:53,080
the design between all the teams working in this corridor.

447
00:24:55,120 --> 00:24:57,600
I'm gonna tee up the Jackson Interceptor project

448
00:24:57,600 --> 00:25:02,160
and maybe ask Erin to chime in on this one a little bit.

449
00:25:02,160 --> 00:25:04,520
So to get oriented with where we are on the map here

450
00:25:04,520 --> 00:25:08,120
you can see the wastewater treatment plant is up here.

451
00:25:08,120 --> 00:25:11,160
The Jackson Street Interceptor has experienced

452
00:25:11,160 --> 00:25:14,040
charging in the past during wet weather events

453
00:25:15,040 --> 00:25:18,480
where the manholes kind of back up

454
00:25:18,480 --> 00:25:22,600
and the pipes don't have adequate carrying capacity.

455
00:25:22,600 --> 00:25:26,280
It's in the TID project plan to upsize this interceptor

456
00:25:26,280 --> 00:25:29,240
in order to provide some wet weather relief

457
00:25:29,240 --> 00:25:33,840
just to make sure that those surcharging issues

458
00:25:33,840 --> 00:25:37,080
are not exacerbated by any of the additional flows

459
00:25:37,080 --> 00:25:39,720
that may be coming into the plant

460
00:25:39,720 --> 00:25:42,160
as the result of all of the development

461
00:25:42,240 --> 00:25:44,600
in the TID 5 area.

462
00:25:46,440 --> 00:25:49,680
The schedule on this is that Kapoor has already surveyed

463
00:25:49,680 --> 00:25:51,720
this and has designed ongoing.

464
00:25:52,560 --> 00:25:55,800
We're looking at a 2028 construction year

465
00:25:55,800 --> 00:25:58,880
and that was selected kind of in coordination

466
00:25:58,880 --> 00:26:03,880
with Roger and Rob to be cognizant of other city projects

467
00:26:04,760 --> 00:26:08,160
that are already planned for 2027 and 2029.

468
00:26:08,160 --> 00:26:11,600
28 was the best year that was identified for this.

469
00:26:13,160 --> 00:26:15,160
And I guess with that Erin, did you want to talk

470
00:26:15,160 --> 00:26:18,080
any project stats or specifics?

471
00:26:20,320 --> 00:26:22,960
Really the only update that I have is that survey

472
00:26:22,960 --> 00:26:26,520
is mostly complete.

473
00:26:26,520 --> 00:26:29,560
We will be starting design here very shortly.

474
00:26:31,120 --> 00:26:34,520
And beyond that, I think Ben covered everything else.

475
00:26:34,520 --> 00:26:35,360
Thanks.

476
00:26:35,360 --> 00:26:36,360
All right, great.

477
00:26:37,200 --> 00:26:43,200
And then that kind of ties into the sanitary interceptor

478
00:26:43,200 --> 00:26:44,720
up sizing.

479
00:26:44,720 --> 00:26:47,800
If we look at this map, the black lines up here

480
00:26:47,800 --> 00:26:51,080
actually the projects that were completed earlier this year

481
00:26:51,080 --> 00:26:54,560
that the city took on over this last winter.

482
00:26:54,560 --> 00:26:58,160
And that was the initial sanitary and water utility

483
00:26:58,160 --> 00:27:01,080
extensions to the southern point of connection

484
00:27:01,960 --> 00:27:06,960
to the vantage development area.

485
00:27:07,680 --> 00:27:12,000
So what we identified is the need to upsize

486
00:27:12,000 --> 00:27:15,640
a couple of the portions going all the way

487
00:27:15,640 --> 00:27:17,280
from Terrace Drive all the way down

488
00:27:17,280 --> 00:27:20,640
to the wastewater treatment plant.

489
00:27:20,640 --> 00:27:24,400
Now this is broken into three separate phases.

490
00:27:25,240 --> 00:27:28,600
Phase one is, well, they're ordered here

491
00:27:28,640 --> 00:27:30,120
by construction year.

492
00:27:30,120 --> 00:27:33,720
Phase one is project 27-1.

493
00:27:33,720 --> 00:27:35,360
That's the furthest downstream,

494
00:27:35,360 --> 00:27:38,680
and we need to upsize that add capacity.

495
00:27:38,680 --> 00:27:43,680
We're actually splitting that 27-1 into two sub phases,

496
00:27:44,680 --> 00:27:48,280
A, which is actually on the grounds of the wastewater plants

497
00:27:48,280 --> 00:27:52,480
and B, which kind of follows the Valley Creek corridor

498
00:27:52,480 --> 00:27:53,520
and goes up a little bit.

499
00:27:53,520 --> 00:27:57,120
That'll include up sizing sewers

500
00:27:57,120 --> 00:28:01,120
to both 30 and 36-inch respectively.

501
00:28:02,000 --> 00:28:07,000
And 28-2 is the second piece that runs,

502
00:28:10,440 --> 00:28:12,880
forgive me, I'm blanking on the cross street here,

503
00:28:12,880 --> 00:28:15,480
but runs all the way up to Terrace Drive

504
00:28:15,480 --> 00:28:20,120
to the LL area, hails trail, thank you.

505
00:28:21,000 --> 00:28:26,000
That includes a little over 4,000 feet of 20-inch,

506
00:28:26,280 --> 00:28:28,680
21-inch diameter sewer.

507
00:28:28,680 --> 00:28:31,280
And then 30-1 is the middle piece,

508
00:28:31,280 --> 00:28:35,280
and we're saying that we're only gonna touch that if needed.

509
00:28:35,280 --> 00:28:38,120
And the background on that is,

510
00:28:40,440 --> 00:28:45,040
we included that in the TID project plan to be conservative,

511
00:28:45,040 --> 00:28:47,440
but that middle piece that 30-1

512
00:28:47,480 --> 00:28:50,280
is already 21-inches in diameter.

513
00:28:50,280 --> 00:28:52,480
And so when we've done our updated planning

514
00:28:52,480 --> 00:28:55,240
since that TID project plan was approved,

515
00:28:55,240 --> 00:28:58,400
we identified this needs to be 21-inch all the way down

516
00:28:58,400 --> 00:29:03,400
to here where it needs to get upsized to 30-36,

517
00:29:05,360 --> 00:29:07,920
accordingly, as you get closer to the plant.

518
00:29:07,920 --> 00:29:12,520
So upon further analysis, this one is in good shape

519
00:29:12,520 --> 00:29:15,640
for the flows in that planning area.

520
00:29:15,640 --> 00:29:18,680
So that's why on the bar chart at the top there,

521
00:29:18,680 --> 00:29:22,160
that 30-1, that middle portion is pushed all the way out

522
00:29:22,160 --> 00:29:23,800
on the schedule.

523
00:29:23,800 --> 00:29:26,200
It's actually more likely at this point

524
00:29:26,200 --> 00:29:28,300
that that project is not needed at all.

525
00:29:33,040 --> 00:29:38,040
Schedule on this, 27-1 is the most important piece.

526
00:29:38,200 --> 00:29:43,200
Design, Kapoor is designing this 27-1B.

527
00:29:44,200 --> 00:29:46,400
They've already started on that.

528
00:29:46,400 --> 00:29:48,680
Stream needs authorization from the board,

529
00:29:48,680 --> 00:29:51,120
which we'll be approaching you with next month

530
00:29:51,120 --> 00:29:54,040
to do the furthest downstream on the grounds

531
00:29:54,040 --> 00:29:55,920
of the wastewater plant.

532
00:29:55,920 --> 00:29:59,800
We'll need to get started on that next month.

533
00:30:03,440 --> 00:30:04,880
That's it for the interceptor.

534
00:30:06,200 --> 00:30:10,000
Utility looping projects, these are all clumped together.

535
00:30:10,000 --> 00:30:13,120
And as I stated earlier in the presentation,

536
00:30:13,120 --> 00:30:15,400
these are the projects that kind of complete

537
00:30:15,400 --> 00:30:16,400
this overall loop.

538
00:30:16,400 --> 00:30:21,400
So 26-1 and 26-2 loop the site on the west side

539
00:30:22,320 --> 00:30:24,800
all the way up to the northern point of connection

540
00:30:24,800 --> 00:30:28,320
to the existing vantage construction area.

541
00:30:29,720 --> 00:30:32,440
These last remaining projects would loop water

542
00:30:32,440 --> 00:30:35,480
and sewer up on the east side

543
00:30:35,480 --> 00:30:39,720
and also extend sanitary service on the west side

544
00:30:39,720 --> 00:30:42,920
within the Canalsville obligation areas.

545
00:30:42,920 --> 00:30:45,240
Again, we're pushing those out a little bit yet,

546
00:30:45,240 --> 00:30:49,720
just waiting to see how exactly things develop

547
00:30:49,720 --> 00:30:54,240
and allow for kind of sewer pack and DNR input

548
00:30:54,240 --> 00:30:58,240
on finalizing the service area plans

549
00:30:58,240 --> 00:31:01,120
before we get too far down the line with those.

550
00:31:06,520 --> 00:31:09,240
I believe that's all I need to say about those projects

551
00:31:09,240 --> 00:31:11,240
unless you have anything to add, Aaron.

552
00:31:12,240 --> 00:31:14,120
All right, so in summary,

553
00:31:16,200 --> 00:31:19,120
specific city-led projects are being refined

554
00:31:19,120 --> 00:31:21,280
and are becoming actionable.

555
00:31:21,280 --> 00:31:23,920
You're gonna see Aaron back next month,

556
00:31:23,920 --> 00:31:27,040
hopefully with a recommendation on awarding 26-1

557
00:31:27,040 --> 00:31:31,120
and 26-2 strand, we'll have some contracts

558
00:31:31,120 --> 00:31:33,920
coming before the board also in October

559
00:31:33,920 --> 00:31:35,380
and potentially November.

560
00:31:36,480 --> 00:31:40,400
Approximately $100 million in city-led TID-5 projects

561
00:31:40,400 --> 00:31:43,040
are planned over the next five years.

562
00:31:44,160 --> 00:31:47,440
Financing again is by the developer.

563
00:31:47,440 --> 00:31:49,600
Extensive project coordination is ongoing

564
00:31:49,600 --> 00:31:53,640
between the different projects and the project teams.

565
00:31:53,640 --> 00:31:55,520
The governments and departments involved

566
00:31:55,520 --> 00:31:58,280
as well as the community and the organizations

567
00:31:58,280 --> 00:32:02,120
and this overall plan's gonna continue to be revised

568
00:32:02,120 --> 00:32:05,920
as we work through the plan and specific projects.

569
00:32:06,920 --> 00:32:10,960
With that, all that's left is to open it up to questions,

570
00:32:10,960 --> 00:32:14,160
but as stated, I just wanted to put this overall schedule

571
00:32:14,160 --> 00:32:17,280
back in front of you and that you have a little background

572
00:32:17,280 --> 00:32:19,400
on each of these projects and can again,

573
00:32:19,400 --> 00:32:23,760
try to digest how these all kind of align together.

574
00:32:26,160 --> 00:32:27,680
We'll take any questions?

575
00:32:30,120 --> 00:32:31,280
Go ahead.

576
00:32:31,280 --> 00:32:33,960
Can we go back to 26-3 for a minute?

577
00:32:33,960 --> 00:32:35,280
Got a couple questions.

578
00:32:38,960 --> 00:32:42,040
Let's see, we've got 26-1 and 26-2

579
00:32:44,520 --> 00:32:47,840
and then we've got 27-2 is the county A-H,

580
00:32:47,840 --> 00:32:49,520
I'm sorry, the county A-H project.

581
00:32:49,520 --> 00:32:53,440
What is the project where you the Oakland Avenue?

582
00:32:53,440 --> 00:32:56,760
Oh, the booster station, 27-3, sure.

583
00:32:56,760 --> 00:32:57,720
Oh, it's 27-3, okay.

584
00:32:57,720 --> 00:32:58,800
Yep.

585
00:32:58,800 --> 00:33:02,640
So that yellow section that goes across the railroad tracks,

586
00:33:02,640 --> 00:33:04,760
is that kind of where we're moving at North

587
00:33:04,760 --> 00:33:06,800
because we keep hitting obstructions?

588
00:33:06,800 --> 00:33:08,120
Is that what that plan is?

589
00:33:09,120 --> 00:33:12,200
Yeah, I'll just say that all that is

590
00:33:13,400 --> 00:33:15,720
entirely different projects.

591
00:33:16,760 --> 00:33:18,920
It's in the same vicinity, but that yellow section

592
00:33:18,920 --> 00:33:20,840
is entirely on Oakland Avenue.

593
00:33:20,840 --> 00:33:23,520
It does have to cross our need to railroad tracks again.

594
00:33:25,120 --> 00:33:27,320
But that's water, the other project is sewer.

595
00:33:27,320 --> 00:33:28,240
Oh, I see, okay.

596
00:33:29,240 --> 00:33:33,040
So with the areas where it goes along the street,

597
00:33:33,040 --> 00:33:36,000
will the street be ripped up for a few months

598
00:33:36,000 --> 00:33:37,520
when we get to that?

599
00:33:37,520 --> 00:33:39,880
Yeah, that's actually a great question.

600
00:33:39,880 --> 00:33:43,080
What we've planned is areas of the street

601
00:33:43,080 --> 00:33:46,160
that are in good shape and are okay

602
00:33:46,160 --> 00:33:49,880
with just like your standard utility trench patch,

603
00:33:49,880 --> 00:33:52,520
fine, that'll probably be the approach.

604
00:33:52,520 --> 00:33:55,600
But a lot of these streets actually aren't in good enough

605
00:33:55,640 --> 00:33:58,680
shape that a trench patch would make sense.

606
00:33:58,680 --> 00:34:02,000
So in those cases, it's gonna be a full reconstruct

607
00:34:02,000 --> 00:34:04,200
of the road surface also.

608
00:34:04,200 --> 00:34:07,240
And then that would be scheduled to coincide

609
00:34:07,240 --> 00:34:08,880
with the lead line replacements

610
00:34:08,880 --> 00:34:09,960
when the street gets ripped down.

611
00:34:09,960 --> 00:34:10,800
Correct.

612
00:34:10,800 --> 00:34:14,240
When we're doing the water means, Dan already has

613
00:34:14,240 --> 00:34:16,800
an inventory of the lead service laterals

614
00:34:16,800 --> 00:34:20,800
and anywhere we encounter those, those will be replaced.

615
00:34:21,720 --> 00:34:22,560
Thank you.

616
00:34:22,560 --> 00:34:23,400
Yep, for sure.

617
00:34:24,400 --> 00:34:27,160
So just that, that's not probably be about

618
00:34:27,160 --> 00:34:31,280
six, seven months of construction in that area.

619
00:34:31,280 --> 00:34:33,240
Yep, road's torn up.

620
00:34:33,240 --> 00:34:36,160
So expect it to be a whole summer when we get there.

621
00:34:37,800 --> 00:34:40,080
So I don't know if you know this number

622
00:34:40,080 --> 00:34:41,880
any of the city employees know this number,

623
00:34:41,880 --> 00:34:46,120
but how many customers, commercial or residential,

624
00:34:46,120 --> 00:34:50,600
will we have in that small little blue silver strip on LL

625
00:34:51,600 --> 00:34:54,440
that runs, I mean, I know pliers is there

626
00:34:54,440 --> 00:34:57,160
in the town of Port, but are there any other

627
00:35:00,360 --> 00:35:03,240
homes or businesses along that route?

628
00:35:03,240 --> 00:35:07,200
Yeah, it's a great question on this little blue strip

629
00:35:07,200 --> 00:35:10,040
over here, right now there's only approximately

630
00:35:10,040 --> 00:35:12,560
four rooftops, I would say.

631
00:35:13,560 --> 00:35:15,680
It's agricultural.

632
00:35:15,680 --> 00:35:19,640
It's one of the reasons, you know, the city is obligated

633
00:35:19,640 --> 00:35:21,880
to provide utility service, and I know there's

634
00:35:21,880 --> 00:35:24,600
an agreement kind of ongoing, but we've won

635
00:35:24,600 --> 00:35:29,560
to at least delay and take into consideration

636
00:35:29,560 --> 00:35:32,800
will there be more users or more connections

637
00:35:32,800 --> 00:35:35,440
kind of on this corner before really starting

638
00:35:35,440 --> 00:35:37,960
to put this portion in.

639
00:35:37,960 --> 00:35:42,960
Okay, and then I'm sorry, it's in the same area,

640
00:35:43,440 --> 00:35:45,840
this utility looping project.

641
00:35:45,880 --> 00:35:49,960
So the light blue and or the dark blue,

642
00:35:49,960 --> 00:35:53,680
is any of that like redundancy or is that like,

643
00:35:53,680 --> 00:35:58,240
makes it supercharged or am I not getting it completely?

644
00:35:58,240 --> 00:36:02,520
No, actually you're asking a really great question here

645
00:36:02,520 --> 00:36:05,640
because I'm just gonna say the light blue projects

646
00:36:05,640 --> 00:36:08,760
which are labeled over here, that's just,

647
00:36:08,760 --> 00:36:11,440
they kind of go to here on LL.

648
00:36:11,440 --> 00:36:14,960
The dark blue project is just sanitary sewer

649
00:36:15,520 --> 00:36:18,800
and the sole purpose of that is to be able to serve

650
00:36:19,800 --> 00:36:22,800
the rest of the Canalsville obligation area here.

651
00:36:22,800 --> 00:36:23,880
Okay.

652
00:36:23,880 --> 00:36:27,600
And then the brown project just kind of completes

653
00:36:27,600 --> 00:36:32,600
this northeast corner to make the water main loop.

654
00:36:34,080 --> 00:36:39,080
So without this project, the water main

655
00:36:40,000 --> 00:36:42,040
the water main's will be able to serve

656
00:36:42,040 --> 00:36:47,040
the current advantage development area adequately.

657
00:36:47,560 --> 00:36:51,600
This looping adds redundancy that somewhere down the line

658
00:36:51,600 --> 00:36:53,280
if this water main is out of service

659
00:36:53,280 --> 00:36:56,720
or there's water main break as things age or whatever

660
00:36:56,720 --> 00:36:58,840
then there's another loop.

661
00:36:58,840 --> 00:36:59,680
Okay.

662
00:37:02,080 --> 00:37:04,120
And it also makes it more expandable.

663
00:37:04,960 --> 00:37:06,440
Yes.

664
00:37:06,440 --> 00:37:10,840
So within TID-5, all of the pink lands are also in TID-5.

665
00:37:10,840 --> 00:37:15,280
There is, there has not been any specific site development

666
00:37:15,280 --> 00:37:17,000
proposal for that.

667
00:37:17,960 --> 00:37:22,960
But yeah, that's another good point is that

668
00:37:23,280 --> 00:37:25,640
and why we're kind of delaying these projects

669
00:37:25,640 --> 00:37:29,760
is depending on how the pink lands develop,

670
00:37:29,760 --> 00:37:33,680
it might be better, more strategic to expand sewer over here

671
00:37:33,680 --> 00:37:35,600
or sewer over here.

672
00:37:35,600 --> 00:37:37,720
Maybe it still makes sense to do both.

673
00:37:37,720 --> 00:37:39,360
It all kind of depends, but.

674
00:37:39,360 --> 00:37:41,560
Oh, that date might change depending on.

675
00:37:41,560 --> 00:37:42,880
Correct.

676
00:37:42,880 --> 00:37:44,000
Whatever is other.

677
00:37:44,000 --> 00:37:44,840
Yep.

678
00:37:44,840 --> 00:37:45,680
Thank you.

679
00:37:45,680 --> 00:37:46,520
Yep.

680
00:37:50,600 --> 00:37:52,720
Any other questions, comments?

681
00:37:54,160 --> 00:37:55,400
Well, thank you.

682
00:37:55,400 --> 00:37:57,240
Yes, absolutely.

683
00:37:57,240 --> 00:38:00,880
We'll be doing it again at the council meeting on the 15th.

684
00:38:00,880 --> 00:38:01,720
Cool.

685
00:38:04,680 --> 00:38:08,840
Moving on to agenda item number five,

686
00:38:08,840 --> 00:38:12,560
consideration and possible action on water treatment plant

687
00:38:12,560 --> 00:38:16,080
change order number seven to improve the east path

688
00:38:16,080 --> 00:38:17,880
behind the water treatment plant

689
00:38:17,880 --> 00:38:22,240
with concrete paving, a ramp and storm water drainage.

690
00:38:23,200 --> 00:38:24,040
Dan.

691
00:38:34,640 --> 00:38:35,480
Sure.

692
00:39:02,040 --> 00:39:02,880
Okay.

693
00:39:03,680 --> 00:39:08,680
So I'm just going to have some pictures in the background, but I'll start talking first.

694
00:39:08,680 --> 00:39:15,680
The East Path Project has been on our list for improvement since the treatment plant project started.

695
00:39:15,680 --> 00:39:24,680
Unfortunately, we had a rough start with some of the unknowns which caused a lot of the change orders before this one.

696
00:39:24,680 --> 00:39:32,680
It was unknown if we were going to have enough time or funds available to plan and complete a project like this.

697
00:39:32,680 --> 00:39:40,680
So what we did is we put it on our 10-year CIP, identified it as a project that we wanted to do,

698
00:39:40,680 --> 00:39:47,680
and basically had a placeholder in case we were unable to complete this as part of this project.

699
00:39:47,680 --> 00:39:56,680
With our current schedule, we are showing in two weeks from now we're going to do our last underground work

700
00:39:56,680 --> 00:39:59,680
behind the building on the east side of the property.

701
00:39:59,680 --> 00:40:06,680
So this created an opportunity for this project to be completed before winter.

702
00:40:06,680 --> 00:40:14,680
So we asked SCH and CD Smith to design and give a surprise for completing a project like this.

703
00:40:14,680 --> 00:40:24,680
I just want to say that so this project is not only for utility needs,

704
00:40:24,680 --> 00:40:33,680
but it's also to kind of bring back the popular destination that this area was before the project started.

705
00:40:33,680 --> 00:40:44,680
It's been two years now since this path has been closed and we're looking at another eight months potentially if nothing is done now.

706
00:40:44,680 --> 00:40:53,680
We have had many surrounding citizens and residents reach out and ask when the path was going to be completed.

707
00:40:53,680 --> 00:41:01,680
Or what's going to happen with it and concerned about security of with the fencing around and not being able to access

708
00:41:01,680 --> 00:41:07,680
between the park and the south side of where the lighthouse is and everything.

709
00:41:07,680 --> 00:41:19,680
So restoring this path, gaining access and I guess making it more safe for customers and residences.

710
00:41:19,680 --> 00:41:22,680
Another big deal for us.

711
00:41:22,680 --> 00:41:26,680
So we want to move on with this.

712
00:41:26,680 --> 00:41:31,680
So I want to just show some pictures. This is kind of the before of what the path looked like.

713
00:41:31,680 --> 00:41:43,680
You can see basically what they did in the past is they put grass and topsoil right up to the building wall.

714
00:41:43,680 --> 00:41:47,680
When they redid the plant in the 90s and they put this EFS finish on the plant.

715
00:41:47,680 --> 00:41:54,680
So what that grass did is actually destroyed all of the EFS that it is touching right now.

716
00:41:54,680 --> 00:42:03,680
So when we had to remove all of this to do some of the underground work in the back, we also had to replace all the EFS along here.

717
00:42:03,680 --> 00:42:10,680
These are the two pump rooms, the current pump room plant one and plant two.

718
00:42:10,680 --> 00:42:18,680
And this is kind of looking to the north that larger grassy area is the plant to clear well.

719
00:42:18,680 --> 00:42:24,680
So the more flat area is actually an underground tank.

720
00:42:24,680 --> 00:42:30,680
And then this is kind of just looking at it to the south. So this is standing in the park looking south.

721
00:42:30,680 --> 00:42:39,680
A lot of the say brush bushes you see those are kind of just overgrown bushes that were allowed to grow.

722
00:42:39,680 --> 00:42:42,680
That has since been removed with the project.

723
00:42:42,680 --> 00:42:50,680
So this is just an overview of what it kind of looks like right now.

724
00:42:50,680 --> 00:42:55,680
And then I'll get to the rendering here. So this is what we're looking to do.

725
00:42:55,680 --> 00:42:58,680
This is from the south side looking north.

726
00:42:59,680 --> 00:43:12,680
You'll see the very south portion of the building. That's the new clear well tank and then pump room right to the west of the tank is a ramp.

727
00:43:12,680 --> 00:43:18,680
So that ramp leads to a new pump room door. The original plan had just a stoop with staircase.

728
00:43:18,680 --> 00:43:24,680
But the tank would have needed extra cover along the footing.

729
00:43:24,680 --> 00:43:38,680
So we would have had to have gone back to this type of look to get that extra weight over the footing.

730
00:43:38,680 --> 00:43:44,680
If we didn't decide to put a ramp there.

731
00:43:44,680 --> 00:43:53,680
So the ramp also gives us access. You can kind of see the the white door where I was showing the pointer.

732
00:43:53,680 --> 00:44:00,680
It gives us access to the new pump room. Right. Thanks. So, yeah.

733
00:44:00,680 --> 00:44:03,680
Okay. So right here is the new pump room door.

734
00:44:03,680 --> 00:44:09,680
And then the ramp gives us access to get in that door.

735
00:44:09,680 --> 00:44:16,680
Otherwise we're having to go upstairs and we have to bring in service trucks and potentially cranes to pull up pumps and stuff.

736
00:44:16,680 --> 00:44:22,680
So this makes access a lot better.

737
00:44:22,680 --> 00:44:26,680
This is from the north looking south.

738
00:44:26,680 --> 00:44:29,680
I'm just actually going to go back to this first slide. So.

739
00:44:29,680 --> 00:44:32,680
Right here, these are.

740
00:44:32,680 --> 00:44:37,680
Kind of bump outs, but they're actually our two shore well tanks.

741
00:44:37,680 --> 00:44:45,680
So the plan would be to actually have a curb go north south in front of the tanks.

742
00:44:45,680 --> 00:44:48,680
So it's kind of not exactly how it would be.

743
00:44:48,680 --> 00:44:54,680
But we want to we have to access those tanks with large vehicles and.

744
00:44:54,680 --> 00:44:59,680
Our large jet truck every couple of years. We actually sent a diver into these tanks to clean them.

745
00:44:59,680 --> 00:45:06,680
So currently before this project, it was kind of logistic nightmare to get bigger equipment back there.

746
00:45:06,680 --> 00:45:11,680
So making this path concrete and widening it.

747
00:45:11,680 --> 00:45:15,680
Not only gives us better access to inside the facility, it's a better access to the.

748
00:45:16,680 --> 00:45:18,680
The actual shore wells.

749
00:45:18,680 --> 00:45:22,680
So that's the utility need of this.

750
00:45:22,680 --> 00:45:25,680
If we.

751
00:45:25,680 --> 00:45:30,680
Continue on to the north, like I said, this is the current clear well.

752
00:45:30,680 --> 00:45:36,680
The plan would be to get rid of the soil that's on it right now and push the path to the west.

753
00:45:36,680 --> 00:45:42,680
So we would have an exposed tank wall just like we do in many other spots throughout the building.

754
00:45:42,680 --> 00:45:48,680
And then the path would hug the wall and we would open up more green space to the east.

755
00:45:48,680 --> 00:45:50,680
So all of this space over here.

756
00:45:50,680 --> 00:45:54,680
Would be approximately 20 22 feet wide.

757
00:45:54,680 --> 00:45:57,680
We're now in spaces. It's maybe eight feet.

758
00:45:57,680 --> 00:46:02,680
So this gives us potential for future bench spots picnic table spots.

759
00:46:02,680 --> 00:46:09,680
If you guys remember the south side of the property had was all grass and some trees and we had a couple of picnic tables and.

760
00:46:09,680 --> 00:46:14,680
Quite a few people throughout the seasons came and sat there and enjoyed the time.

761
00:46:14,680 --> 00:46:19,680
So we want to open up the view again and make it more accessible for.

762
00:46:19,680 --> 00:46:26,680
Residents and visitors to enjoy the beautiful view that's right there.

763
00:46:26,680 --> 00:46:29,680
Part of the cost.

764
00:46:29,680 --> 00:46:31,680
So.

765
00:46:31,680 --> 00:46:36,680
The ramp up I go back.

766
00:46:36,680 --> 00:46:45,680
The ramp was about 32,000 of this cost was to build this ramp.

767
00:46:45,680 --> 00:46:51,680
And then it was about 80,000 to do the utility portion of the concrete path.

768
00:46:51,680 --> 00:47:00,680
And then an additional about 27,000 to do the extended footage to get us to.

769
00:47:00,680 --> 00:47:05,680
The north portion of this property where the water treatment plant meets the park.

770
00:47:05,680 --> 00:47:10,680
It was brought up.

771
00:47:10,680 --> 00:47:14,680
What would the cost be if we did this at a future date?

772
00:47:14,680 --> 00:47:18,680
Are we reached out to CD Smith and they said that.

773
00:47:18,680 --> 00:47:25,680
Next year they're they're anticipating maybe a 15 to 18% increase on the construction costs and materials with.

774
00:47:25,680 --> 00:47:29,680
The high construction demand as you just heard.

775
00:47:29,680 --> 00:47:30,680
So.

776
00:47:30,680 --> 00:47:35,680
Doing this project now not only gets us to a faster.

777
00:47:35,680 --> 00:47:38,680
Opening but then also.

778
00:47:38,680 --> 00:47:43,680
If we choose to do this saves us money by waiting to do it in the future.

779
00:47:43,680 --> 00:47:46,680
Any questions?

780
00:47:46,680 --> 00:47:47,680
Of course.

781
00:47:47,680 --> 00:47:48,680
Yeah.

782
00:47:48,680 --> 00:47:52,680
So I just thought of this now and I apologize for not bringing it up earlier.

783
00:47:53,680 --> 00:47:54,680
But.

784
00:47:54,680 --> 00:47:56,680
The Cedar Creek Valley project.

785
00:47:56,680 --> 00:48:00,680
One of the things at the very end will have a bridge.

786
00:48:00,680 --> 00:48:03,680
Where the creek's going to flow into the.

787
00:48:03,680 --> 00:48:08,680
How will that work with this new project.

788
00:48:08,680 --> 00:48:11,680
Or do we have have we thought about that.

789
00:48:11,680 --> 00:48:13,680
So it's.

790
00:48:13,680 --> 00:48:16,680
Kind of hard to see but the outfall is right here.

791
00:48:16,680 --> 00:48:17,680
Yeah.

792
00:48:17,680 --> 00:48:19,680
So it's kind of like at the end there.

793
00:48:20,680 --> 00:48:22,680
So this very last pipe.

794
00:48:22,680 --> 00:48:23,680
Yeah.

795
00:48:23,680 --> 00:48:26,680
That would be the end of the path which there's already kind of a break there anyway.

796
00:48:26,680 --> 00:48:27,680
Okay.

797
00:48:27,680 --> 00:48:28,680
So that.

798
00:48:28,680 --> 00:48:31,680
Kind of would be the start of that.

799
00:48:31,680 --> 00:48:32,680
That other.

800
00:48:32,680 --> 00:48:35,680
We wouldn't be laying down concrete just to pull it up later.

801
00:48:35,680 --> 00:48:36,680
Correct.

802
00:48:36,680 --> 00:48:37,680
Thank you.

803
00:48:41,680 --> 00:48:44,680
Continuing north of that bridge then is there.

804
00:48:45,680 --> 00:48:50,680
To replace the asphalt behind the Yacht Club to the wastewater.

805
00:48:50,680 --> 00:48:53,680
Concrete because there's kind of that section of ready asphalt.

806
00:48:53,680 --> 00:48:54,680
Yeah.

807
00:48:54,680 --> 00:48:56,680
I think that would be that would tie into the.

808
00:48:56,680 --> 00:48:58,680
The Valley Creek project is.

809
00:48:58,680 --> 00:49:01,680
Replacing that final footage.

810
00:49:01,680 --> 00:49:03,680
Of that section.

811
00:49:03,680 --> 00:49:04,680
Yeah.

812
00:49:04,680 --> 00:49:08,680
So with the budget you said 80,000 is the.

813
00:49:08,680 --> 00:49:12,680
The tanks and the infrastructure is does that need to happen right now.

814
00:49:12,680 --> 00:49:17,680
Regardless or is that part of the original plan was to just.

815
00:49:17,680 --> 00:49:21,680
Replace the asphalt and put back top soil.

816
00:49:21,680 --> 00:49:25,680
So there's about 10,000 in the project.

817
00:49:25,680 --> 00:49:27,680
So we'd actually have a 10,000 credit.

818
00:49:27,680 --> 00:49:30,680
If we did this that would go towards this price.

819
00:49:30,680 --> 00:49:34,680
But there is money in the budget to just put the asphalt back.

820
00:49:34,680 --> 00:49:37,680
And then put the soil back where it was.

821
00:49:38,680 --> 00:49:42,680
Also with that the path itself right now.

822
00:49:42,680 --> 00:49:44,680
Like to the north here.

823
00:49:44,680 --> 00:49:46,680
It's barely 10 feet wide.

824
00:49:46,680 --> 00:49:49,680
So we're adding another four to six feet.

825
00:49:49,680 --> 00:49:51,680
So if.

826
00:49:51,680 --> 00:49:56,680
If there were to be some sort of emergency in the park or the Yacht Club.

827
00:49:56,680 --> 00:50:00,680
It's pretty impossible to get a fire truck back there right now.

828
00:50:00,680 --> 00:50:03,680
Or any ambulance would fit, but it'd be pretty tight.

829
00:50:04,680 --> 00:50:08,680
Can you go back to the rendering slide.

830
00:50:08,680 --> 00:50:14,680
Maybe the one with the view from the north.

831
00:50:14,680 --> 00:50:15,680
Yeah.

832
00:50:15,680 --> 00:50:18,680
So it's 20 feet between the rocks and the.

833
00:50:18,680 --> 00:50:21,680
East edge of the concrete there.

834
00:50:21,680 --> 00:50:22,680
Yeah.

835
00:50:22,680 --> 00:50:24,680
With this were to be 16 feet.

836
00:50:24,680 --> 00:50:29,680
We could even take this and take it down to 14 to give two more feet here.

837
00:50:30,680 --> 00:50:34,680
If you remember being down here, this is a pretty steep.

838
00:50:34,680 --> 00:50:37,680
Decline from the the rock wall.

839
00:50:37,680 --> 00:50:42,680
So this curb that would go north south would actually be 12 inches.

840
00:50:42,680 --> 00:50:46,680
So we're going to gain a little bit elevation where we'll try to level this.

841
00:50:46,680 --> 00:50:49,680
Grassy air out as best as we can with that extra footage.

842
00:50:49,680 --> 00:50:51,680
We'll be able to make it a little.

843
00:50:51,680 --> 00:50:52,680
Yeah.

844
00:50:52,680 --> 00:50:56,680
So the rendering is a little deceiving because the grade actually comes down.

845
00:50:57,680 --> 00:50:58,680
Yeah.

846
00:50:58,680 --> 00:51:00,680
To that path rather than being flat across there.

847
00:51:00,680 --> 00:51:06,680
And then there's a storm, a catch basin on the south end of the walk to.

848
00:51:06,680 --> 00:51:07,680
Yeah.

849
00:51:07,680 --> 00:51:12,680
So not shown, but right about in, in this area, we'd have a catch basin and it'd connect

850
00:51:12,680 --> 00:51:16,680
into a storm catch basin right here.

851
00:51:16,680 --> 00:51:19,680
So we'd be able to take most of the pass flow.

852
00:51:19,680 --> 00:51:23,680
Catch it and then, you know, put it into our sewers.

853
00:51:23,680 --> 00:51:26,680
Right now, we'll pre project.

854
00:51:26,680 --> 00:51:31,680
It was pretty icy back there during winter.

855
00:51:31,680 --> 00:51:37,680
So that curb is going to extend past those kind of half circle concrete areas where the

856
00:51:37,680 --> 00:51:38,680
benches are.

857
00:51:38,680 --> 00:51:39,680
Yeah.

858
00:51:39,680 --> 00:51:40,680
It'll be a step there.

859
00:51:40,680 --> 00:51:41,680
And how, how high did you say that was?

860
00:51:41,680 --> 00:51:44,680
12 inches, 12 inches.

861
00:51:44,680 --> 00:51:49,680
And we have a, there's an electrical transfer box right here too.

862
00:51:49,680 --> 00:51:52,680
That's not shown, but that would be protected by the curb too then.

863
00:51:53,680 --> 00:52:00,680
Will there be breaks in that curb every so often to allow access onto the green space?

864
00:52:00,680 --> 00:52:01,680
Yeah.

865
00:52:01,680 --> 00:52:02,680
Good question.

866
00:52:02,680 --> 00:52:04,680
So we were anticipating.

867
00:52:04,680 --> 00:52:10,680
Two or three spots on the north side more, kind of away from our working area that we

868
00:52:10,680 --> 00:52:13,680
would do stairs into the area.

869
00:52:13,680 --> 00:52:20,680
So that's built into this quote too.

870
00:52:21,680 --> 00:52:22,680
Well, I think it looks great.

871
00:52:22,680 --> 00:52:25,680
I'm thrilled to have a path back.

872
00:52:25,680 --> 00:52:26,680
Yeah.

873
00:52:26,680 --> 00:52:30,680
Any other questions or.

874
00:52:30,680 --> 00:52:35,680
How long do you think the project will take and like what's the, what's the, is there any

875
00:52:35,680 --> 00:52:39,680
risk with lead times and parts or anything that gets started yet this year?

876
00:52:39,680 --> 00:52:41,680
Luckily most of it is concrete.

877
00:52:41,680 --> 00:52:47,680
The only lead time issue might be a getting the storm catch basin.

878
00:52:48,680 --> 00:52:51,680
But there's plenty to do for CD Smith in the meantime.

879
00:52:51,680 --> 00:52:59,680
So if the underground work is slated to start September 21st, if that takes two weeks or

880
00:52:59,680 --> 00:53:08,680
one to two weeks, CD Smith would basically start immediately going into this project with hopefully

881
00:53:08,680 --> 00:53:10,680
completing it by the end of fall.

882
00:53:10,680 --> 00:53:13,680
It should be pretty easy to get down to further ground freezes.

883
00:53:13,680 --> 00:53:14,680
Yep.

884
00:53:15,680 --> 00:53:20,680
And avoiding any winter concrete costs.

885
00:53:20,680 --> 00:53:21,680
One last question.

886
00:53:21,680 --> 00:53:25,680
So I can't tell by the existing site.

887
00:53:25,680 --> 00:53:28,680
Are there trees there or would trees have to be planted?

888
00:53:28,680 --> 00:53:31,680
There's currently no trees and there, there wasn't any trees.

889
00:53:31,680 --> 00:53:32,680
Any kind of like.

890
00:53:32,680 --> 00:53:33,680
Shade.

891
00:53:33,680 --> 00:53:34,680
Any kind.

892
00:53:34,680 --> 00:53:38,680
We could try to add trees more to the north area.

893
00:53:38,680 --> 00:53:40,680
But again, this is a rock wall.

894
00:53:40,680 --> 00:53:45,680
So the rocks, although you see them here, they do extend to the west.

895
00:53:45,680 --> 00:53:50,680
So we'd have to pick the right kind of tree to.

896
00:53:50,680 --> 00:53:55,680
Our wastewater treatment plant outfall runs down that path too.

897
00:53:55,680 --> 00:53:57,680
So we can be cognizant of that.

898
00:53:57,680 --> 00:53:58,680
Okay.

899
00:53:58,680 --> 00:54:02,680
But we could do we approve those paths in the front.

900
00:54:02,680 --> 00:54:06,680
It could be something similar maybe later on down the road.

901
00:54:06,680 --> 00:54:07,680
Yeah.

902
00:54:07,680 --> 00:54:08,680
Absolutely.

903
00:54:09,680 --> 00:54:18,680
How many benches do you actually anticipate being along there?

904
00:54:18,680 --> 00:54:19,680
That depends.

905
00:54:19,680 --> 00:54:23,680
I don't know our bench policy here.

906
00:54:23,680 --> 00:54:27,680
I was I was anticipating to.

907
00:54:28,680 --> 00:54:30,680
I was thinking about the.

908
00:54:30,680 --> 00:54:32,680
Picking table areas.

909
00:54:32,680 --> 00:54:36,680
You know, with hopefully shade in the future and then benches between.

910
00:54:36,680 --> 00:54:40,680
So I would say at least for benches.

911
00:54:40,680 --> 00:54:48,680
It's a it's a large area.

912
00:54:48,680 --> 00:54:49,680
Okay.

913
00:54:49,680 --> 00:54:52,680
Only ask because the rendering looks really nice.

914
00:54:52,680 --> 00:54:53,680
Yeah.

915
00:54:54,680 --> 00:54:55,680
Yep.

916
00:54:55,680 --> 00:54:57,680
That's the goal.

917
00:54:57,680 --> 00:54:59,680
Any more questions?

918
00:54:59,680 --> 00:55:01,680
Just just one.

919
00:55:01,680 --> 00:55:05,680
Would this be considered under park and rec then as part of the park?

920
00:55:05,680 --> 00:55:08,680
Or is it going to be part of the water treatment?

921
00:55:08,680 --> 00:55:09,680
This would be water treatment.

922
00:55:09,680 --> 00:55:11,680
I mean, we we take care of it.

923
00:55:11,680 --> 00:55:12,680
Right now.

924
00:55:12,680 --> 00:55:13,680
Okay.

925
00:55:13,680 --> 00:55:20,680
Yeah.

926
00:55:21,680 --> 00:55:23,680
There's no more questions.

927
00:55:23,680 --> 00:55:26,680
They entertain a motion.

928
00:55:26,680 --> 00:55:33,680
I'll move to accept or to approve the recommendation of staff on this project.

929
00:55:33,680 --> 00:55:34,680
As written.

930
00:55:34,680 --> 00:55:37,680
The motion by elder woman Miller.

931
00:55:37,680 --> 00:55:39,680
The second.

932
00:55:39,680 --> 00:55:43,680
I'll second.

933
00:55:43,680 --> 00:55:47,680
I guess if there's no more comments or discussion all in favor.

934
00:55:47,680 --> 00:55:48,680
Hi.

935
00:55:49,680 --> 00:55:50,680
Motion carries.

936
00:55:50,680 --> 00:55:58,680
Thank you.

937
00:55:58,680 --> 00:56:00,680
Thanks, Dan.

938
00:56:00,680 --> 00:56:04,680
That brings us to item number six.

939
00:56:04,680 --> 00:56:08,680
Review staff monthly reports.

940
00:56:08,680 --> 00:56:10,680
Okay.

941
00:56:11,680 --> 00:56:14,680
I'll just add.

942
00:56:14,680 --> 00:56:16,680
We just met two weeks ago.

943
00:56:16,680 --> 00:56:20,680
So I won't necessarily go through all these, but are there.

944
00:56:20,680 --> 00:56:24,680
Are there any questions about anything in any of the reports.

945
00:56:24,680 --> 00:56:26,680
For this evening.

946
00:56:26,680 --> 00:56:27,680
Yeah.

947
00:56:27,680 --> 00:56:35,680
Not that we're not very busy or that there aren't exciting things, but.

948
00:56:35,680 --> 00:56:39,680
Yeah, I'll just take any questions if anyone has any on the reports.

949
00:56:40,680 --> 00:56:44,680
I guess not.

950
00:56:44,680 --> 00:56:45,680
Okay.

951
00:56:45,680 --> 00:56:48,680
Moving on to chairman's business.

952
00:56:48,680 --> 00:56:50,680
I have none.

953
00:56:50,680 --> 00:56:54,680
Members liaison's business.

954
00:56:54,680 --> 00:56:57,680
Nope.

955
00:56:57,680 --> 00:57:05,680
Next meeting is October 13th, 2026 here at 530 p.m.

956
00:57:06,680 --> 00:57:11,680
And I guess that brings us to item 10 adjournment.

957
00:57:11,680 --> 00:57:14,680
I have a motion.

958
00:57:14,680 --> 00:57:16,680
I'll make the motion to adjourn the meeting.

959
00:57:16,680 --> 00:57:18,680
Motion by Alderman Beaster.

960
00:57:18,680 --> 00:57:19,680
Second.

961
00:57:19,680 --> 00:57:20,680
Second by Mr. Polly.

962
00:57:20,680 --> 00:57:22,680
I'm all in favor.

963
00:57:22,680 --> 00:57:23,680
Hi.

964
00:57:23,680 --> 00:57:25,680
Do I do this again?

965
00:57:25,680 --> 00:57:26,680
Yeah.

966
00:57:26,680 --> 00:57:31,680
Thanks, Nick.
