WEBVTT

00:00.000 --> 00:07.000
I'm going to make a motion to

00:07.000 --> 00:08.000
approve.

00:08.000 --> 00:10.000
I 22nd, 2026 meeting of the

00:10.000 --> 00:12.000
city of Port Washington,

00:12.000 --> 00:14.000
Board of Public Works.

00:14.000 --> 00:16.000
Board member Camp Holly is

00:16.000 --> 00:18.000
absent today, but otherwise we

00:18.000 --> 00:20.000
do have a quorum.

00:20.000 --> 00:22.000
So we'll first go to item two

00:22.000 --> 00:25.000
approve the minutes of the

00:25.000 --> 00:26.000
previous meeting.

00:26.000 --> 00:27.000
Motion to approve.

00:27.000 --> 00:29.000
Motion to approve by Alderman

00:29.000 --> 00:30.000
City.

00:30.000 --> 00:31.000
Any questions or comments on

00:31.000 --> 00:32.000
the motion?

00:32.000 --> 00:33.000
Seeing none, all those in favor

00:33.000 --> 00:34.000
say aye.

00:34.000 --> 00:35.000
Aye.

00:35.000 --> 00:36.000
Aye.

00:36.000 --> 00:37.000
Opposed?

00:37.000 --> 00:38.000
Motion carries.

00:38.000 --> 00:40.000
That will take us to item three

00:40.000 --> 00:41.000
public comments and

00:41.000 --> 00:42.000
appearances.

00:42.000 --> 00:44.000
If you have a public comment

00:44.000 --> 00:47.000
or appearance, please limit

00:47.000 --> 00:49.000
your comments to three minutes.

00:49.000 --> 00:51.000
We will give 30 minutes for

00:51.000 --> 00:53.000
public comments and appearances.

00:53.000 --> 00:54.000
Please state your name and

00:54.000 --> 00:56.000
address and make sure to sign

00:56.000 --> 00:58.000
in and try to keep your

00:58.000 --> 01:00.000
comments relevant to the items

01:00.000 --> 01:01.000
on tonight's agenda.

01:01.000 --> 01:03.000
Do we have any public comments

01:03.000 --> 01:11.000
or appearances?

01:11.000 --> 01:13.000
My name is Dean Wiegert, my

01:13.000 --> 01:15.000
address is 3708 East Northport

01:15.000 --> 01:17.000
Drive in the town of Port

01:17.000 --> 01:18.000
Washington.

01:18.000 --> 01:20.000
And I'm here talking about the

01:20.000 --> 01:22.000
decision or the discussion and

01:22.000 --> 01:25.000
possible decisions on well use

01:25.000 --> 01:27.000
at the data center site.

01:27.000 --> 01:29.000
I have a copy of the letter

01:29.000 --> 01:31.000
that they received from the

01:31.000 --> 01:33.000
DNR regarding the use of the

01:33.000 --> 01:34.000
wells.

01:34.000 --> 01:36.000
What bothers me is that it

01:36.000 --> 01:38.000
seems that we were told that

01:38.000 --> 01:39.000
there would be no water taken

01:39.000 --> 01:41.000
directly from the lake and there

01:41.000 --> 01:43.000
would be no ground water so the

01:43.000 --> 01:45.000
city was running up water and

01:45.000 --> 01:47.000
sewer to the data center site and

01:47.000 --> 01:49.000
I don't even know if they still

01:49.000 --> 01:51.000
if they yet have that water is

01:51.000 --> 01:53.000
that why they're asking to use

01:53.000 --> 01:54.000
the wells.

01:54.000 --> 01:56.000
So I think that the public should

01:56.000 --> 01:58.000
know whether they actually have

01:58.000 --> 02:00.000
water and sewer running up to

02:00.000 --> 02:02.000
the data center and whether

02:02.000 --> 02:04.000
they're using city water.

02:04.000 --> 02:06.000
The wells that are approved by

02:06.000 --> 02:08.000
this letter say that they are

02:08.000 --> 02:10.000
under 70 gallons per minute,

02:10.000 --> 02:12.000
which is below the required

02:12.000 --> 02:14.000
the required amount from

02:14.000 --> 02:16.000
metering per the DNR letter.

02:16.000 --> 02:18.000
So how are we going to know how

02:18.000 --> 02:20.000
much water they use if it isn't

02:20.000 --> 02:22.000
metered or are you going to

02:22.000 --> 02:24.000
require it to be metered?

02:24.000 --> 02:26.000
Well, it's a very independent

02:26.000 --> 02:28.000
inspection of these wells and

02:28.000 --> 02:30.000
their usage.

02:30.000 --> 02:32.000
And what is the water used for?

02:32.000 --> 02:34.000
Will there be chemicals in the

02:34.000 --> 02:35.000
wastewater?

02:35.000 --> 02:37.000
How will the wastewater be

02:37.000 --> 02:38.000
disposed of?

02:38.000 --> 02:40.000
How long will they be able to

02:40.000 --> 02:42.000
use the wells indefinitely?

02:42.000 --> 02:44.000
The letter from the DNR

02:44.000 --> 02:46.000
mentions that two of the wells

02:46.000 --> 02:48.000
are going to be filled and sealed

02:48.000 --> 02:50.000
but the other two wells they don't

02:50.000 --> 02:51.000
mention anything about.

02:51.000 --> 02:53.000
So does that mean they're going

02:53.000 --> 02:55.000
to be able to use the wells to

02:55.000 --> 02:56.000
use the wells?

02:56.000 --> 02:58.000
Well, the water is going to be

02:58.000 --> 03:00.000
able to use the wells since it is

03:00.000 --> 03:01.000
city property.

03:01.000 --> 03:02.000
Has the city hired a hydrologist

03:02.000 --> 03:04.000
to confirm any of the details of

03:04.000 --> 03:05.000
this?

03:05.000 --> 03:07.000
As a town of Port homeowner with

03:07.000 --> 03:09.000
a well about a mile from the

03:09.000 --> 03:11.000
data center, I am begging you to

03:11.000 --> 03:13.000
be able to answer these questions

03:13.000 --> 03:15.000
before you allow the data center

03:15.000 --> 03:16.000
to use the wells.

03:16.000 --> 03:18.000
Please do your deal.

03:18.000 --> 03:20.000
Your due diligence and figure

03:20.000 --> 03:22.000
out what the water is being used

03:22.000 --> 03:24.000
and how it will be monitored and

03:24.000 --> 03:25.000
reported.

03:25.000 --> 03:27.000
The Beaver dam residents have

03:27.000 --> 03:28.000
already had their wells go dry

03:28.000 --> 03:30.000
from the data center that's being

03:30.000 --> 03:31.000
built there.

03:31.000 --> 03:33.000
Please don't be responsible for

03:33.000 --> 03:34.000
this happening here.

03:34.000 --> 03:36.000
All of the residents in the town

03:36.000 --> 03:38.000
of Port are depending on this.

03:38.000 --> 03:40.000
Thank you for your time.

03:40.000 --> 03:41.000
Thank you.

03:41.000 --> 03:48.000
Tracy Finch of Port Washington.

03:48.000 --> 03:55.000
I am asking.

03:55.000 --> 03:57.000
You know where I live.

03:57.000 --> 03:58.000
I need your address.

03:58.000 --> 04:00.000
1142 West Portview Drive.

04:00.000 --> 04:02.000
And make sure you sign in also.

04:02.000 --> 04:04.000
I'm asking the public worse to

04:04.000 --> 04:06.000
deny any permit that would allow

04:06.000 --> 04:08.000
Vantage to use the wells on their

04:08.000 --> 04:09.000
property.

04:09.000 --> 04:11.000
I'm asking the public worse to

04:11.000 --> 04:13.000
deny any permit that would allow

04:13.000 --> 04:15.000
small water user.

04:15.000 --> 04:17.000
Vantage has shown has not shown

04:17.000 --> 04:19.000
how much water their closed-loop

04:19.000 --> 04:21.000
system actually needs and without

04:21.000 --> 04:23.000
that information, any withdrawal

04:23.000 --> 04:25.000
from the local wells puts nearby

04:25.000 --> 04:27.000
residents at risk.

04:27.000 --> 04:29.000
Heavy pumping lowers the water

04:29.000 --> 04:31.000
table, slows recharge and cause

04:31.000 --> 04:33.000
well interference.

04:33.000 --> 04:35.000
Meaning homes and farms can lose

04:35.000 --> 04:37.000
pressure, lose access entirely,

04:37.000 --> 04:39.000
and have their own expense,

04:39.000 --> 04:41.000
which shouldn't happen.

04:41.000 --> 04:43.000
This isn't theoretical.

04:43.000 --> 04:45.000
It has already happened in other

04:45.000 --> 04:47.000
Wisconsin communities, including

04:47.000 --> 04:48.000
Beaver Dam.

04:48.000 --> 04:49.000
We also have a serious

04:49.000 --> 04:51.000
concern about water quality.

04:51.000 --> 04:53.000
We don't know what chemicals

04:53.000 --> 04:55.000
Vantage plants use their closed-loop

04:55.000 --> 04:56.000
system.

04:56.000 --> 04:58.000
A system that has never been tested

04:58.000 --> 05:00.000
anywhere else, cooling water

05:00.000 --> 05:02.000
collects dissolved solids and

05:02.000 --> 05:04.000
treatment chemicals, if any of

05:04.000 --> 05:06.000
that leaks or is discharged, it

05:06.000 --> 05:08.000
can move straight into the aquifer

05:08.000 --> 05:10.000
our residents rely on.

05:10.000 --> 05:12.000
Private wells don't have that same

05:12.000 --> 05:14.000
protection as municipal's

05:14.000 --> 05:15.000
system.

05:15.000 --> 05:17.000
And once an aquifer is contaminated,

05:17.000 --> 05:19.000
it's almost impossible to fix.

05:19.000 --> 05:21.000
And there's a basic question no one

05:21.000 --> 05:23.000
has answered.

05:23.000 --> 05:25.000
Why isn't Vantage using the

05:25.000 --> 05:27.000
municipal water line that was

05:27.000 --> 05:29.000
already built from the water plant

05:29.000 --> 05:30.000
to their sites?

05:30.000 --> 05:32.000
That line exists.

05:32.000 --> 05:33.000
It was designed for industrial

05:33.000 --> 05:34.000
users.

05:34.000 --> 05:36.000
If that system is safe, why avoid

05:36.000 --> 05:38.000
regulated water source and

05:38.000 --> 05:40.000
instead turn to private wells?

05:40.000 --> 05:42.000
The option with the highest risk

05:42.000 --> 05:43.000
to residents.

05:43.000 --> 05:45.000
Choosing wells is choosing less

05:45.000 --> 05:46.000
oversight.

05:46.000 --> 05:48.000
Port Washington wells were built

05:48.000 --> 05:50.000
for community use, not industrial

05:50.000 --> 05:51.000
extraction.

05:51.000 --> 05:53.000
Allowing Vantage to tap them

05:53.000 --> 05:55.000
creates a long risk that

05:55.000 --> 05:58.000
residents, not the company, will

05:58.000 --> 06:00.000
carry for decades.

06:00.000 --> 06:02.000
This is completely preventable.

06:02.000 --> 06:05.000
The responsible choice is simple.

06:05.000 --> 06:07.000
Don't grant the permits for the

06:07.000 --> 06:08.000
well use.

06:08.000 --> 06:10.000
We can support development without

06:10.000 --> 06:12.000
sacrificing our water security, but

06:12.000 --> 06:14.000
we cannot replace an aquifer once

06:14.000 --> 06:15.000
it's damaged.

06:15.000 --> 06:22.000
Thank you.

06:22.000 --> 06:23.000
Any other public comments or

06:23.000 --> 06:24.000
appearances?

06:25.000 --> 06:33.000
We have a few more.

06:33.000 --> 06:38.000
Okay.

06:38.000 --> 06:40.000
Chris Ackman, one would say

06:40.000 --> 06:42.000
South Garfield Avenue,

06:42.000 --> 06:43.000
or Washington.

06:43.000 --> 06:45.000
This is also addressed to the

06:45.000 --> 06:46.000
rest of the Common Council who's

06:46.000 --> 06:49.000
not here to me, including mayor.

06:49.000 --> 06:51.000
Well, I'm back.

06:51.000 --> 06:53.000
The fight is not over.

06:54.000 --> 06:56.000
Since I've been here last, a

06:56.000 --> 06:58.000
plethora of new developments and

06:58.000 --> 06:59.000
lawsuits are right.

06:59.000 --> 07:01.000
We're showcasing what a debacle

07:01.000 --> 07:02.000
this entire thing is.

07:02.000 --> 07:04.000
From Oracle trying to shape down

07:04.000 --> 07:07.000
and sue the PSC because Oracle

07:07.000 --> 07:09.000
refuses to honor their end of the

07:09.000 --> 07:11.000
agreement, all while seeing their

07:11.000 --> 07:13.000
business readings drop showing us

07:13.000 --> 07:15.000
what a bad deal it is to be doing

07:15.000 --> 07:16.000
business with them.

07:16.000 --> 07:18.000
And the Sierra Club suing the

07:18.000 --> 07:20.000
DNR for failing their duties of

07:20.000 --> 07:22.000
holding Vantage accountable and

07:22.000 --> 07:23.000
doing a thorough impact

07:23.000 --> 07:24.000
investigation before giving the

07:24.000 --> 07:25.000
green light.

07:25.000 --> 07:27.000
It's just bad, bad, bad.

07:27.000 --> 07:28.000
Don't get me started on these

07:28.000 --> 07:30.000
comments from Cloverleaf.

07:30.000 --> 07:31.000
You did this.

07:31.000 --> 07:34.000
Everything you promised is a lie.

07:34.000 --> 07:36.000
And it's now blowing up in our

07:36.000 --> 07:37.000
faces.

07:37.000 --> 07:39.000
And we told you for all your

07:39.000 --> 07:40.000
comments that are relevant to

07:40.000 --> 07:41.000
this work.

07:41.000 --> 07:42.000
Thank you.

07:42.000 --> 07:43.000
Don't interrupt me.

07:43.000 --> 07:44.000
Ted?

07:44.000 --> 07:45.000
Okay.

07:45.000 --> 07:46.000
Should I start over?

07:46.000 --> 07:48.000
Can I have my time back?

07:48.000 --> 07:49.000
You can give your relevant

07:49.000 --> 07:51.000
comments or you can sit down.

07:51.000 --> 07:52.000
Those are your choices.

07:52.000 --> 07:53.000
It's in the speech.

07:53.000 --> 07:54.000
Thank you.

07:54.000 --> 07:55.000
Then jump to the relevant

07:55.000 --> 07:56.000
portion for this board.

07:56.000 --> 07:59.000
It leads into that.

07:59.000 --> 08:00.000
Please continue.

08:00.000 --> 08:02.000
Get to your relevant comments.

08:02.000 --> 08:04.000
Ooh, sucking me up on my time,

08:04.000 --> 08:05.000
I guess.

08:05.000 --> 08:07.000
All right.

08:07.000 --> 08:10.000
Now tonight you talk about

08:10.000 --> 08:12.000
granting these white collar

08:12.000 --> 08:14.000
criminals permits for well

08:14.000 --> 08:15.000
water.

08:15.000 --> 08:16.000
I am sick.

08:16.000 --> 08:17.000
Vantage, if you are here tonight

08:17.000 --> 08:19.000
in this crowd, turn around and

08:19.000 --> 08:20.000
get out of our town.

08:20.000 --> 08:22.000
Go ahead and look at what's

08:22.000 --> 08:24.000
happening to several towns in

08:24.000 --> 08:26.000
the state after data centers

08:26.000 --> 08:28.000
powered on streams, rivers and

08:28.000 --> 08:29.000
creeks run dry.

08:29.000 --> 08:30.000
Wells run dry.

08:30.000 --> 08:32.000
When the water comes back,

08:32.000 --> 08:33.000
it's poisoned.

08:33.000 --> 08:35.000
We don't want you here.

08:35.000 --> 08:37.000
The common council here is a

08:37.000 --> 08:38.000
disgrace.

08:38.000 --> 08:40.000
All of you who approved this are

08:40.000 --> 08:41.000
no better than any of this.

08:41.000 --> 08:43.000
In fact, you may be even worse

08:43.000 --> 08:45.000
for bending over for such

08:45.000 --> 08:46.000
destruction.

08:46.000 --> 08:48.000
Now I have to hear about

08:48.000 --> 08:49.000
this.

08:49.000 --> 08:50.000
This is happening in states

08:50.000 --> 08:51.000
all across the country and you

08:51.000 --> 08:52.000
think it's going to be

08:52.000 --> 08:54.000
different here, sickening.

08:54.000 --> 08:56.000
I would like to take a moment

08:56.000 --> 08:58.000
and give a nod of appreciation

08:58.000 --> 09:01.000
to Michael Beaster for being the

09:01.000 --> 09:03.000
only man sitting at the table

09:03.000 --> 09:05.000
with a backbone and truly

09:05.000 --> 09:07.000
earning his position with the

09:07.000 --> 09:08.000
people's seat.

09:08.000 --> 09:09.000
The rest of you failed.

09:09.000 --> 09:11.000
Oh, and to add, yes, I'm aware

09:11.000 --> 09:12.000
this is for the construction

09:12.000 --> 09:13.000
phase.

09:13.000 --> 09:14.000
But let's face the facts.

09:14.000 --> 09:16.000
When it is built and they are

09:16.000 --> 09:18.000
ready to power on, where do you

09:18.000 --> 09:19.000
think they're going to get this

09:19.000 --> 09:20.000
water from?

09:20.000 --> 09:21.000
City water?

09:21.000 --> 09:22.000
Guess where that comes from?

09:22.000 --> 09:23.000
Exactly.

09:23.000 --> 09:25.000
Allowing this allows that

09:25.000 --> 09:26.000
doom day to come.

09:26.000 --> 09:29.000
Now is our time to obstruct.

09:29.000 --> 09:31.000
Our aquifers and lake is more

09:31.000 --> 09:33.000
important than your

09:33.000 --> 09:35.000
sheisty business deals.

09:35.000 --> 09:37.000
Go poison someone else.

09:37.000 --> 09:39.000
Thank you for robbing me of my

09:39.000 --> 09:40.000
time.

09:40.000 --> 09:41.000
All right.

09:41.000 --> 09:42.000
Thank you.

09:42.000 --> 09:43.000
Everybody.

09:43.000 --> 09:44.000
All right.

09:44.000 --> 09:45.000
Thank you.

09:45.000 --> 09:46.000
Thank you.

09:46.000 --> 09:47.000
Thank you.

09:47.000 --> 09:48.000
Thank you.

09:48.000 --> 09:49.000
Thank you.

09:49.000 --> 09:50.000
Hi.

09:50.000 --> 09:52.000
My name is Sebastian Elicher.

09:52.000 --> 09:54.000
I live in 137 East Cleveland

09:54.000 --> 09:57.000
Road, just up the hill.

09:57.000 --> 09:59.000
I'm asking the common council

09:59.000 --> 10:01.000
members today to deny the

10:01.000 --> 10:04.000
wells permit requested by

10:04.000 --> 10:06.000
Vantage data center.

10:06.000 --> 10:09.000
I don't ask you to deny them

10:09.000 --> 10:12.000
forever or for good, but I would

10:12.000 --> 10:16.000
ask you to pause any further

10:16.000 --> 10:18.000
permits.

10:18.000 --> 10:20.000
The current lawsuit against the

10:20.000 --> 10:23.000
DNR has already revealed

10:23.000 --> 10:26.000
deeply concerning details about

10:26.000 --> 10:28.000
the possible implications of

10:28.000 --> 10:30.000
this project.

10:30.000 --> 10:32.000
And these details were never

10:32.000 --> 10:34.000
disclosed to the public and

10:34.000 --> 10:37.000
they call into question, at least

10:37.000 --> 10:39.000
temporarily.

10:39.000 --> 10:41.000
The safety and the

10:41.000 --> 10:45.000
sustainability of the proposed

10:45.000 --> 10:47.000
project.

10:47.000 --> 10:49.000
I want to remind the council also

10:49.000 --> 10:51.000
of something very simple and

10:51.000 --> 10:54.000
Aldermann Gasper thankfully

10:54.000 --> 10:58.000
shared those public in social

10:58.000 --> 11:00.000
media today.

11:00.000 --> 11:02.000
And that is that the city was

11:02.000 --> 11:04.000
told or the citizens were told

11:04.000 --> 11:06.000
that Vantage would not use

11:06.000 --> 11:07.000
wells.

11:07.000 --> 11:09.000
And that commitment matters.

11:09.000 --> 11:11.000
It was part of public trust

11:11.000 --> 11:13.000
and that should not be discarded

11:13.000 --> 11:15.000
now.

11:15.000 --> 11:17.000
And therefore I would ask the

11:17.000 --> 11:19.000
voting members today to deny

11:19.000 --> 11:21.000
that request by Vantage.

11:21.000 --> 11:23.000
Thank you.

11:23.000 --> 11:25.000
Are there any other public

11:25.000 --> 11:27.000
comments or appearances?

11:35.000 --> 11:37.000
Good afternoon.

11:37.000 --> 11:39.000
Thank you.

11:39.000 --> 11:41.000
I'm just going to reinforce a

11:41.000 --> 11:43.000
lot of what some of these other

11:43.000 --> 11:45.000
people said.

11:45.000 --> 11:47.000
We were told no well water.

11:47.000 --> 11:49.000
I spent six months having to

11:49.000 --> 11:51.000
drive on gravel and on crappy

11:51.000 --> 11:53.000
roads because you guys were

11:53.000 --> 11:55.000
putting a pipe in to give them

11:55.000 --> 11:57.000
the water that they claim they

11:57.000 --> 11:59.000
need.

11:59.000 --> 12:01.000
So why now do they also need the

12:01.000 --> 12:03.000
water from the aquifer?

12:03.000 --> 12:05.000
Just more BS.

12:05.000 --> 12:07.000
They have lied about everything

12:07.000 --> 12:09.000
from the get go.

12:09.000 --> 12:11.000
Okay.

12:11.000 --> 12:13.000
I'm going to put you all on

12:13.000 --> 12:15.000
notice too.

12:15.000 --> 12:17.000
That if and when there's a

12:17.000 --> 12:19.000
problem with my well, I will be

12:19.000 --> 12:21.000
holding the city libel.

12:21.000 --> 12:23.000
So be prepared for more lawsuits

12:23.000 --> 12:25.000
because all these other neighbors

12:25.000 --> 12:27.000
feel the exact same way.

12:27.000 --> 12:29.000
So this is public notice that we

12:29.000 --> 12:31.000
are aware of what you're doing

12:31.000 --> 12:33.000
and we're going to hold you

12:33.000 --> 12:35.000
libel.

12:35.000 --> 12:37.000
Vantage isn't here because they're

12:37.000 --> 12:39.000
too busy schmoozing with

12:39.000 --> 12:41.000
Jody Habersch-Cineken today.

12:41.000 --> 12:43.000
So they're not here as usual to

12:43.000 --> 12:45.000
listen to how the people actually

12:45.000 --> 12:47.000
feel.

12:47.000 --> 12:49.000
Our good neighbors are never

12:49.000 --> 12:51.000
here to listen to how we feel

12:51.000 --> 12:53.000
because they don't care.

12:53.000 --> 12:55.000
The city has proven time and time

12:55.000 --> 12:57.000
again that none of you care either.

12:57.000 --> 13:01.000
As a couple of people have

13:01.000 --> 13:03.000
mentioned, people in Beaver Dam

13:03.000 --> 13:05.000
have had water problems.

13:05.000 --> 13:07.000
I've seen people in Georgia, people

13:07.000 --> 13:09.000
in Oregon, people in Virginia.

13:09.000 --> 13:11.000
All of a sudden it's the same thing.

13:11.000 --> 13:13.000
The developer says that

13:13.000 --> 13:15.000
they're going to use whatever

13:15.000 --> 13:17.000
water and then next thing you know,

13:17.000 --> 13:19.000
during construction they're using

13:19.000 --> 13:21.000
the well water.

13:21.000 --> 13:23.000
And then the citizens who have

13:23.000 --> 13:25.000
been here and will be here after

13:25.000 --> 13:27.000
Vantage leaves in the 15 years

13:27.000 --> 13:29.000
that they committed to

13:29.000 --> 13:31.000
are the ones that are screwed.

13:31.000 --> 13:33.000
And I have to pay tens of thousands

13:33.000 --> 13:35.000
of dollars for new wells.

13:35.000 --> 13:37.000
Make this make sense.

13:37.000 --> 13:39.000
Make it make sense

13:39.000 --> 13:41.000
for anyone.

13:41.000 --> 13:43.000
Who's monitoring the water?

13:43.000 --> 13:45.000
What enforcement teeth

13:45.000 --> 13:47.000
come with that?

13:47.000 --> 13:49.000
So far there's been nothing.

13:49.000 --> 13:51.000
They've not been punished for anything

13:51.000 --> 13:53.000
that they have lied about in the past.

13:53.000 --> 13:55.000
We're tired of it.

13:55.000 --> 13:57.000
We are the citizens.

13:57.000 --> 13:59.000
We are the citizens who elect

13:59.000 --> 14:01.000
these clowns that are serving us.

14:01.000 --> 14:03.000
What happened to the promise

14:03.000 --> 14:05.000
that Vantage made that they would

14:05.000 --> 14:07.000
only be using the city water

14:07.000 --> 14:09.000
and in limited numbers?

14:13.000 --> 14:15.000
You know, I keep reading

14:15.000 --> 14:17.000
about a supposed truck wash.

14:17.000 --> 14:19.000
Is that what this water's going

14:19.000 --> 14:21.000
for to wash their trucks?

14:21.000 --> 14:23.000
Come on.

14:24.000 --> 14:26.000
And you know,

14:26.000 --> 14:28.000
if they claim they only need 12,000

14:28.000 --> 14:29.000
gallons per day,

14:29.000 --> 14:31.000
why can't they drive their tanker

14:31.000 --> 14:33.000
truck over to the hydrant like they've

14:33.000 --> 14:35.000
been doing ever since construction started?

14:35.000 --> 14:37.000
What has changed?

14:37.000 --> 14:39.000
Is it that they don't want to pay for

14:39.000 --> 14:41.000
the city water now that it's gotten so expensive?

14:43.000 --> 14:45.000
Where's the accountability?

14:45.000 --> 14:47.000
Thank you.

14:47.000 --> 14:49.000
You should all be ashamed.

14:49.000 --> 14:51.000
Do we have any other public comments

14:51.000 --> 14:53.000
or appearances?

14:57.000 --> 14:59.000
Carry one stole 1036

14:59.000 --> 15:01.000
shady lane in Grafton.

15:01.000 --> 15:05.000
I am going to not reiterate

15:05.000 --> 15:07.000
everything that's been said here,

15:07.000 --> 15:09.000
though I share a lot of the feelings

15:09.000 --> 15:11.000
that have been shared here.

15:11.000 --> 15:13.000
And I really want to ask you to look at

15:13.000 --> 15:15.000
the folks that are over here and look them in the

15:15.000 --> 15:17.000
eye. These are your neighbors.

15:17.000 --> 15:19.000
These are the people that live in your

15:19.000 --> 15:21.000
city who have trusted

15:21.000 --> 15:23.000
port to act in the best interest of their

15:23.000 --> 15:25.000
citizens.

15:25.000 --> 15:27.000
And there is no going back.

15:29.000 --> 15:31.000
There is no going back once an aquaphor

15:31.000 --> 15:33.000
has been contaminated

15:33.000 --> 15:35.000
or drained dry.

15:35.000 --> 15:37.000
And I really would like you to pause

15:37.000 --> 15:39.000
and take a look at the movement

15:39.000 --> 15:41.000
that has happened in Cedarburg

15:41.000 --> 15:43.000
called Save Cedar Creek

15:43.000 --> 15:45.000
where the gothiers wanted to put in

15:45.000 --> 15:47.000
high-capacity wells

15:47.000 --> 15:49.000
to fill a ski lake.

15:49.000 --> 15:51.000
And the outrage at that.

15:51.000 --> 15:53.000
And that isn't even talking about

15:53.000 --> 15:55.000
possible contamination.

15:55.000 --> 15:57.000
So I'm asking you to really

15:57.000 --> 15:59.000
pause, do not vote

15:59.000 --> 16:01.000
for a yes on this today

16:01.000 --> 16:03.000
and take a look.

16:03.000 --> 16:05.000
Ask for environmental studies to be done

16:05.000 --> 16:07.000
like they did in Cedarburg.

16:07.000 --> 16:09.000
Ask for the accountability.

16:09.000 --> 16:11.000
Time and time again what we have seen

16:11.000 --> 16:13.000
happening in Port Washington

16:13.000 --> 16:15.000
and that is being discussed throughout

16:15.000 --> 16:17.000
the summer is how sad it is

16:17.000 --> 16:19.000
that vantage is getting

16:19.000 --> 16:21.000
everything that they want.

16:21.000 --> 16:23.000
They have walked back

16:23.000 --> 16:25.000
everything they said they were going to

16:25.000 --> 16:27.000
do and doubled down

16:27.000 --> 16:29.000
and at every step they have gotten

16:29.000 --> 16:31.000
a positive vote to support

16:31.000 --> 16:33.000
them and gone back

16:33.000 --> 16:35.000
on the promises that they have made.

16:35.000 --> 16:37.000
And so guys,

16:37.000 --> 16:39.000
Port Washington needs some positive PR.

16:39.000 --> 16:41.000
Let's be real here.

16:41.000 --> 16:43.000
So how about today we take a

16:43.000 --> 16:47.000
pause and we support the citizens

16:47.000 --> 16:49.000
and the community not

16:49.000 --> 16:51.000
vantage and just

16:51.000 --> 16:53.000
take the time to make sure the

16:53.000 --> 16:55.000
studies are being done to hold

16:55.000 --> 16:57.000
vantage accountable to one

16:57.000 --> 16:59.000
thing which is that they were not

16:59.000 --> 17:01.000
going to be using any well water.

17:01.000 --> 17:03.000
Thank you.

17:03.000 --> 17:07.000
If you spoke please make sure you sign

17:07.000 --> 17:09.000
in on the sign sheet.

17:09.000 --> 17:17.000
Hi, I'm Heidi Janis

17:17.000 --> 17:19.000
44-46 Wylers way

17:19.000 --> 17:21.000
in the town of Port

17:21.000 --> 17:23.000
neighbor of the data center.

17:23.000 --> 17:25.000
I just want you to know

17:25.000 --> 17:27.000
I'm not going to repeat what

17:27.000 --> 17:29.000
they said either you know what's going on.

17:29.000 --> 17:31.000
We really don't want to

17:31.000 --> 17:33.000
come see you all the time.

17:33.000 --> 17:35.000
We're so tired of everything

17:35.000 --> 17:37.000
and you just sit there and stare at us

17:37.000 --> 17:39.000
and you don't say anything.

17:39.000 --> 17:41.000
We don't have anything in return

17:41.000 --> 17:43.000
we never get a response.

17:43.000 --> 17:45.000
You're not living there

17:45.000 --> 17:47.000
with the god awful dust

17:47.000 --> 17:49.000
that's in our house all the time

17:49.000 --> 17:51.000
the crap on the roads

17:51.000 --> 17:53.000
the broken windshield just name it

17:53.000 --> 17:55.000
right?

17:55.000 --> 17:57.000
I mean we're so sick of it

17:57.000 --> 17:59.000
I've had to see a cardiologist

17:59.000 --> 18:01.000
because I'm so upset about everything

18:01.000 --> 18:03.000
and I'm a healthy person.

18:03.000 --> 18:05.000
Have you had to?

18:05.000 --> 18:07.000
Thank God.

18:07.000 --> 18:09.000
Thank God.

18:09.000 --> 18:11.000
We have Michael Bista.

18:11.000 --> 18:13.000
So that's all I have to say is

18:13.000 --> 18:15.000
for God's sake listen to us

18:15.000 --> 18:17.000
we're the ones living with it

18:17.000 --> 18:19.000
not you.

18:19.000 --> 18:21.000
All right.

18:21.000 --> 18:23.000
Thank you.

18:23.000 --> 18:25.000
Any other comments or questions?

18:25.000 --> 18:27.000
All right. There are no more

18:27.000 --> 18:29.000
than we will move on to item four

18:29.000 --> 18:31.000
which is consideration

18:31.000 --> 18:33.000
and possible action

18:33.000 --> 18:35.000
for collection of garbage

18:35.000 --> 18:37.000
and recyclables.

18:37.000 --> 18:39.000
All right.

18:39.000 --> 18:41.000
So five years ago the city

18:41.000 --> 18:43.000
switched.

18:43.000 --> 18:45.000
It's a collector for garbage

18:45.000 --> 18:47.000
and recycling from waste

18:47.000 --> 18:49.000
management to harders

18:49.000 --> 18:51.000
and they've done an excellent job

18:51.000 --> 18:53.000
over the last five years.

18:53.000 --> 18:55.000
In fact, they couldn't find any

18:55.000 --> 18:57.000
records of any complaints.

18:57.000 --> 18:59.000
So they have submitted

18:59.000 --> 19:03.000
a amendment to renew

19:03.000 --> 19:05.000
their contract per the original

19:05.000 --> 19:07.000
contract.

19:07.000 --> 19:09.000
We also received a proposal

19:09.000 --> 19:11.000
from GFL green for life

19:11.000 --> 19:13.000
that was similar in price

19:13.000 --> 19:15.000
but just a little bit

19:15.000 --> 19:17.000
more expensive than the

19:17.000 --> 19:19.000
harders renewal.

19:19.000 --> 19:21.000
Mike Thune is here from

19:21.000 --> 19:23.000
harders.

19:23.000 --> 19:25.000
If there are any questions but the

19:25.000 --> 19:27.000
recommendation from the Board

19:27.000 --> 19:29.000
rather to the Board of Public

19:29.000 --> 19:31.000
Works is to renew the

19:31.000 --> 19:33.000
agreement with harders.

19:33.000 --> 19:35.000
And I should point out that

19:35.000 --> 19:37.000
this will result in

19:37.000 --> 19:39.000
because we are seeing a

19:39.000 --> 19:41.000
reduction in cost.

19:41.000 --> 19:43.000
So result in some cost savings

19:43.000 --> 19:45.000
already yet this year

19:45.000 --> 19:47.000
and then next year.

19:47.000 --> 19:49.000
All right.

19:49.000 --> 19:51.000
Do we have any questions

19:51.000 --> 19:53.000
comments?

19:53.000 --> 19:55.000
All right. I just had one small

19:55.000 --> 19:56.000
one and we had spoke about it

19:56.000 --> 19:58.000
and we had a lot of questions

19:58.000 --> 20:00.000
and in lieu of the

20:00.000 --> 20:02.000
doctor's excuse which I think

20:02.000 --> 20:04.000
is an overreach on their behalf.

20:04.000 --> 20:06.000
I understand it for the

20:06.000 --> 20:08.000
backdoor pickup but I think

20:08.000 --> 20:10.000
as a resident if we want a

20:10.000 --> 20:12.000
smaller trash can because many

20:12.000 --> 20:14.000
of us live in smaller houses

20:14.000 --> 20:16.000
that that should be an option

20:16.000 --> 20:18.000
and I don't know what the price

20:18.000 --> 20:20.000
of the can is but.

20:20.000 --> 20:22.000
So I talked to Mike and they

20:22.000 --> 20:24.000
already have so if somebody

20:24.000 --> 20:26.000
wants to switch out their can

20:26.000 --> 20:28.000
because it's their cart

20:28.000 --> 20:30.000
because it's dirty or whatever

20:30.000 --> 20:32.000
reason if it's broken

20:32.000 --> 20:34.000
harders replaces it at no charge

20:34.000 --> 20:36.000
but if you just want to replace

20:36.000 --> 20:38.000
your cart because it's looking

20:38.000 --> 20:40.000
dingy they charge $100.

20:40.000 --> 20:42.000
So this would be the same thing

20:42.000 --> 20:44.000
if you want to change out your

20:44.000 --> 20:46.000
cart to a different cart

20:46.000 --> 20:48.000
it would be a $100 fee.

20:48.000 --> 20:50.000
I would be good with that.

20:50.000 --> 20:52.000
All right. Any other comments

20:52.000 --> 20:54.000
otherwise I will be entertaining

20:54.000 --> 20:56.000
a motion on this item.

20:56.000 --> 20:58.000
I'll make a motion to approve

20:58.000 --> 21:00.000
harder renewal of contract.

21:00.000 --> 21:02.000
All right staff recommended.

21:02.000 --> 21:04.000
We have a motion by Alderman

21:04.000 --> 21:06.000
Miller is there a second?

21:06.000 --> 21:08.000
Second. Second by Alderman

21:08.000 --> 21:10.000
Beaster. Any questions

21:10.000 --> 21:12.000
on the motion? Seeing none

21:12.000 --> 21:14.000
all those in favor say aye.

21:14.000 --> 21:16.000
Aye. Opposed? Motion carries

21:16.000 --> 21:18.000
All right.

21:18.000 --> 21:20.000
Thank you. All right that

21:20.000 --> 21:22.000
goes to item five.

21:22.000 --> 21:24.000
Consideration and possible

21:24.000 --> 21:26.000
action on a state municipal

21:26.000 --> 21:28.000
agreement with WISTOT for

21:28.000 --> 21:30.000
constructing a bump out to the

21:30.000 --> 21:32.000
crosswalk at Portview and

21:32.000 --> 21:34.000
State Trunk Highway 32 and

21:34.000 --> 21:36.000
painting high visibility

21:36.000 --> 21:38.000
crosswalks at all locations

21:38.000 --> 21:40.000
on State Trunk Highway 32.

21:40.000 --> 21:42.000
Okay. So this is an item that

21:42.000 --> 21:44.000
we discussed. I think I put

21:44.000 --> 21:46.000
in the memo in our January

21:46.000 --> 21:48.000
meeting and there was

21:48.000 --> 21:50.000
a motion from the Board of

21:50.000 --> 21:52.000
Public Works at the time once

21:52.000 --> 21:54.000
we reviewed the plans that

21:54.000 --> 21:56.000
WISTOT has for updating

21:56.000 --> 21:58.000
all the handicapped

21:58.000 --> 22:00.000
rams to the new ADA

22:00.000 --> 22:02.000
requirements that are in

22:02.000 --> 22:04.000
place.

22:04.000 --> 22:06.000
The consensus of the

22:06.000 --> 22:08.000
committee was to add high

22:08.000 --> 22:10.000
visibility crosswalks to the

22:10.000 --> 22:12.000
crossings and that was

22:12.000 --> 22:14.000
consistent with the

22:14.000 --> 22:16.000
recommendation that we received

22:16.000 --> 22:18.000
that was just completed

22:18.000 --> 22:22.000
and approved in June.

22:22.000 --> 22:24.000
Okay. So we've added

22:24.000 --> 22:26.000
so we've added high visibility

22:26.000 --> 22:28.000
crosswalks to all

22:28.000 --> 22:30.000
crosswalks on the

22:30.000 --> 22:32.000
State Highway and then

22:32.000 --> 22:34.000
in consultation with

22:34.000 --> 22:36.000
our traffic safety

22:36.000 --> 22:38.000
committee as well as the

22:38.000 --> 22:40.000
Board of Public Works.

22:40.000 --> 22:42.000
Again, there was consensus that

22:42.000 --> 22:44.000
there was a desire to

22:44.000 --> 22:46.000
have a bump out at

22:46.000 --> 22:48.000
Portview Drive to protect

22:48.000 --> 22:50.000
bicyclists and pedestrians

22:50.000 --> 22:52.000
from cars going around

22:52.000 --> 22:54.000
cars that are stopped

22:54.000 --> 22:56.000
for, again, for people

22:56.000 --> 22:58.000
crossing in the northbound

22:58.000 --> 23:00.000
direction. So if they're in the

23:00.000 --> 23:02.000
northbound direction, sometimes

23:02.000 --> 23:04.000
people get confused. They think

23:04.000 --> 23:06.000
the cars is stopped just to

23:06.000 --> 23:08.000
make a left turn and then

23:08.000 --> 23:10.000
people go around and could

23:10.000 --> 23:12.000
possibly have an accident

23:12.000 --> 23:16.000
or something like that.

23:16.000 --> 23:18.000
Okay. So we are

23:18.000 --> 23:20.000
recommending that as part of

23:20.000 --> 23:22.000
this crosswalk improvement

23:22.000 --> 23:24.000
program that we add a bump

23:24.000 --> 23:26.000
out to add additional safety

23:26.000 --> 23:28.000
for people crossing at the

23:28.000 --> 23:30.000
Interurban Trail at Portview

23:30.000 --> 23:32.000
and South Spring Street.

23:32.000 --> 23:34.000
And so if approved, this

23:34.000 --> 23:36.000
would go into the we would

23:36.000 --> 23:38.000
have this this would go to

23:38.000 --> 23:40.000
the Council for approval

23:40.000 --> 23:42.000
of the State Municipal Agreement

23:42.000 --> 23:44.000
and then be put in the

23:44.000 --> 23:48.000
budget for 2029.

23:48.000 --> 23:50.000
All right. Do any questions

23:50.000 --> 23:52.000
comments on this item?

23:52.000 --> 23:54.000
If not, I will entertain

23:54.000 --> 23:57.000
a motion on this item.

23:57.000 --> 24:00.000
I'll move to accept the staff

24:00.000 --> 24:02.000
recommendation to

24:02.000 --> 24:04.000
move this forward.

24:04.000 --> 24:06.000
All right. We have a motion by

24:06.000 --> 24:08.000
Alderman Beaster. Is there a

24:08.000 --> 24:10.000
second?

24:10.000 --> 24:12.000
What? Miller? Miller?

24:12.000 --> 24:14.000
Oh, sorry. All around Miller.

24:14.000 --> 24:16.000
Sorry.

24:16.000 --> 24:18.000
Is there a second? Mr.

24:18.000 --> 24:20.000
Sundorf? Sorry. I was

24:20.000 --> 24:22.000
writing the note.

24:22.000 --> 24:24.000
Yeah.

24:24.000 --> 24:28.000
Any questions on the motion?

24:28.000 --> 24:30.000
Seeing none. All those in favor?

24:30.000 --> 24:32.000
Say aye. Aye. Opposed? Motion

24:32.000 --> 24:34.000
carries. All right.

24:34.000 --> 24:36.000
That brings us to item six

24:36.000 --> 24:38.000
consideration and possible action

24:38.000 --> 24:40.000
on well permits for the

24:40.000 --> 24:42.000
data center. Roger.

24:48.000 --> 24:50.000
All right. So

24:50.000 --> 24:52.000
as everyone's noted here at

24:52.000 --> 24:54.000
public comments, we have

24:54.000 --> 24:56.000
well permits here for the data

24:56.000 --> 24:58.000
center. What our ordinance is

24:58.000 --> 25:00.000
and the intention of this really

25:00.000 --> 25:02.000
is to make sure that we're not

25:02.000 --> 25:04.000
getting cross connections

25:04.000 --> 25:06.000
from the water supply line.

25:06.000 --> 25:08.000
That's the purpose of our ordinance.

25:08.000 --> 25:10.000
So in that regard,

25:10.000 --> 25:12.000
as it's been noted,

25:12.000 --> 25:14.000
water to water, our water

25:14.000 --> 25:16.000
means are not

25:16.000 --> 25:18.000
brought up to Lake Drive at this time

25:18.000 --> 25:20.000
yet. So there's no

25:20.000 --> 25:22.000
concern about a cross connection.

25:22.000 --> 25:24.000
So we do

25:24.000 --> 25:26.000
have

25:26.000 --> 25:28.000
I guess we

25:28.000 --> 25:30.000
do have some other existing wells

25:30.000 --> 25:32.000
in the city.

25:32.000 --> 25:34.000
We don't have those permits at this time.

25:34.000 --> 25:36.000
The water superintendents working

25:36.000 --> 25:38.000
on bringing

25:38.000 --> 25:40.000
those in, but we don't want to hold

25:40.000 --> 25:42.000
hold these up any longer

25:42.000 --> 25:44.000
because this community knows

25:44.000 --> 25:46.000
they're using water using

25:46.000 --> 25:48.000
the wells.

25:54.000 --> 25:56.000
So originally they had four

25:56.000 --> 25:58.000
wells in their application.

25:58.000 --> 26:00.000
One well has been abandoned

26:00.000 --> 26:02.000
approximately a month ago.

26:02.000 --> 26:04.000
The

26:04.000 --> 26:06.000
three wells,

26:06.000 --> 26:08.000
one of the remaining three

26:08.000 --> 26:10.000
wells is used for a rental property

26:10.000 --> 26:12.000
they have, which is rented to the

26:12.000 --> 26:14.000
same

26:14.000 --> 26:16.000
my understanding as the seed company

26:16.000 --> 26:18.000
that's been there previously.

26:18.000 --> 26:20.000
So it's

26:20.000 --> 26:22.000
same capacity, same use at that

26:22.000 --> 26:24.000
well.

26:24.000 --> 26:26.000
So there are the two remaining

26:26.000 --> 26:28.000
wells

26:28.000 --> 26:30.000
they're

26:30.000 --> 26:32.000
combining to provide 12,000 gallons

26:32.000 --> 26:34.000
of water a day to their

26:34.000 --> 26:36.000
trailer city.

26:36.000 --> 26:40.000
Our

26:40.000 --> 26:44.000
ordinances don't regulate

26:44.000 --> 26:48.000
capacity.

26:48.000 --> 26:50.000
DNR has issued a high capacity

26:50.000 --> 26:52.000
well permit to them

26:52.000 --> 26:56.000
that does regulate their capacity.

26:56.000 --> 26:58.000
The two address some of the

26:58.000 --> 27:00.000
comments what what we could add

27:00.000 --> 27:02.000
to our permit would be

27:02.000 --> 27:04.000
the wells are metered.

27:04.000 --> 27:06.000
That's one of the DNR

27:06.000 --> 27:08.000
requirements.

27:08.000 --> 27:10.000
We could ask for monthly reporting

27:10.000 --> 27:12.000
of the water usage.

27:12.000 --> 27:14.000
The other

27:14.000 --> 27:16.000
the easy thing to ask

27:16.000 --> 27:18.000
would be if there's any

27:18.000 --> 27:20.000
modifications to the wells

27:20.000 --> 27:22.000
most specifically if the pumps are

27:22.000 --> 27:24.000
lowered, that we be notified

27:24.000 --> 27:26.000
of.

27:26.000 --> 27:28.000
And the reason I say that

27:28.000 --> 27:30.000
the only reason you'd be lowering

27:30.000 --> 27:32.000
the pumps is because

27:32.000 --> 27:34.000
the aquifer level is coming down

27:34.000 --> 27:36.000
and they would be the first people

27:36.000 --> 27:38.000
impacted.

27:38.000 --> 27:40.000
I think those could be two

27:40.000 --> 27:42.000
reasonable things to add to

27:42.000 --> 27:44.000
the permit.

27:44.000 --> 27:46.000
And other than that

27:46.000 --> 27:48.000
doesn't entertain any questions.

27:48.000 --> 27:50.000
Roger.

27:50.000 --> 27:52.000
So is there anyone from

27:52.000 --> 27:54.000
the public?

27:54.000 --> 27:56.000
I'm just asking.

27:56.000 --> 27:58.000
Trying to answer some of your

27:58.000 --> 28:00.000
questions.

28:00.000 --> 28:02.000
So the public water

28:02.000 --> 28:04.000
and sewer that was on track

28:04.000 --> 28:06.000
to be installed is not yet

28:06.000 --> 28:08.000
at a point where they can use

28:08.000 --> 28:10.000
that water.

28:10.000 --> 28:12.000
Correct?

28:12.000 --> 28:14.000
Yes or no?

28:14.000 --> 28:16.000
Yes or no?

28:16.000 --> 28:18.000
What does that mean?

28:18.000 --> 28:20.000
The water is at the south end

28:20.000 --> 28:24.000
but they are using

28:24.000 --> 28:26.000
from the hydrants down there

28:26.000 --> 28:28.000
they are getting water in

28:28.000 --> 28:30.000
or water tankers for dust

28:30.000 --> 28:32.000
control

28:32.000 --> 28:34.000
other uses that they have on

28:34.000 --> 28:36.000
site.

28:36.000 --> 28:38.000
It's not all the way up the lake

28:38.000 --> 28:40.000
drive.

28:40.000 --> 28:42.000
So from island drive to lake

28:42.000 --> 28:44.000
drive that runs through

28:44.000 --> 28:46.000
vanishes property that's

28:46.000 --> 28:48.000
a private water main

28:48.000 --> 28:50.000
they are in the process of

28:50.000 --> 28:52.000
installing it.

28:52.000 --> 28:56.000
What is the ETA on that?

28:56.000 --> 28:58.000
I don't know.

28:58.000 --> 29:00.000
I have to get back to you on

29:00.000 --> 29:02.000
that question.

29:02.000 --> 29:04.000
So we have

29:04.000 --> 29:06.000
two projects that will go out

29:06.000 --> 29:08.000
to bed this fall to bring

29:08.000 --> 29:10.000
water up to lake drive

29:10.000 --> 29:12.000
for by next summer.

29:12.000 --> 29:14.000
So lake drive shouldn't be

29:14.000 --> 29:16.000
completed for another year

29:16.000 --> 29:18.000
at the most.

29:18.000 --> 29:20.000
I would say that's a good

29:20.000 --> 29:22.000
assumption.

29:22.000 --> 29:24.000
So the

29:24.000 --> 29:26.000
well water that is being used

29:26.000 --> 29:28.000
what I just heard you say is

29:28.000 --> 29:30.000
that one is in a seed

29:30.000 --> 29:32.000
company's rental property

29:32.000 --> 29:34.000
that they are currently

29:34.000 --> 29:36.000
working out of still

29:36.000 --> 29:38.000
and then the two remaining

29:38.000 --> 29:40.000
wells water their

29:40.000 --> 29:44.000
trailer city which are adjacent

29:44.000 --> 29:46.000
to the existing homes that

29:46.000 --> 29:48.000
were there are still there.

29:48.000 --> 29:50.000
But are

29:50.000 --> 29:52.000
they're using it not only in

29:52.000 --> 29:54.000
that building but to also

29:54.000 --> 29:56.000
with their trailer city.

29:56.000 --> 29:58.000
It's the

29:58.000 --> 30:00.000
provide domestic plumbing to

30:00.000 --> 30:02.000
trailer city.

30:02.000 --> 30:04.000
And you said that those wells are

30:04.000 --> 30:06.000
metered or are they

30:06.000 --> 30:08.000
metered?

30:08.000 --> 30:10.000
They are metered.

30:10.000 --> 30:12.000
And so have we seen any

30:12.000 --> 30:14.000
of these wells that are

30:14.000 --> 30:16.000
using?

30:16.000 --> 30:18.000
I should back up.

30:18.000 --> 30:20.000
We have not seen any

30:20.000 --> 30:22.000
results.

30:22.000 --> 30:24.000
They are required to be

30:24.000 --> 30:26.000
metered.

30:26.000 --> 30:28.000
They don't get meters from us

30:28.000 --> 30:30.000
to my knowledge.

30:30.000 --> 30:32.000
Okay.

30:32.000 --> 30:34.000
So no meters from us.

30:34.000 --> 30:36.000
So we have no knowledge or

30:36.000 --> 30:38.000
they don't report to us what they

30:38.000 --> 30:40.000
have been using as their

30:40.000 --> 30:41.000
well water.

30:41.000 --> 30:45.000
So we have no

30:45.000 --> 30:47.000
knowledge or belief that they are

30:47.000 --> 30:49.000
going to use that

30:49.000 --> 30:51.000
well water for the closed loop

30:51.000 --> 30:53.000
system because they're not that

30:53.000 --> 30:55.000
far.

30:55.000 --> 30:57.000
There's nothing there's nowhere to

30:57.000 --> 30:59.000
go.

30:59.000 --> 31:01.000
Correct.

31:01.000 --> 31:03.000
And as of today

31:03.000 --> 31:05.000
you have no knowledge or

31:05.000 --> 31:07.000
belief that they are going to use

31:07.000 --> 31:09.000
that well water for the closed

31:09.000 --> 31:10.000
loop system.

31:10.000 --> 31:12.000
So they're looking at

31:12.000 --> 31:14.000
first quarter of next year to

31:14.000 --> 31:16.000
start to fill their closed new

31:16.000 --> 31:18.000
system.

31:18.000 --> 31:20.000
January through March.

31:20.000 --> 31:22.000
So they're intent to get the

31:22.000 --> 31:24.000
water into the closed loop system

31:24.000 --> 31:26.000
has up and shared with us.

31:26.000 --> 31:28.000
Could you repeat that?

31:28.000 --> 31:30.000
Their intention because

31:30.000 --> 31:32.000
that I'm sorry.

31:32.000 --> 31:34.000
Lake Drive will not be open

31:34.000 --> 31:36.000
as of yet.

31:36.000 --> 31:38.000
So they have not shared or

31:38.000 --> 31:40.000
they have shared with them.

31:40.000 --> 31:42.000
They have.

31:42.000 --> 31:44.000
Their intent is that will be

31:44.000 --> 31:46.000
coming from our water main

31:46.000 --> 31:48.000
because they've been sharing

31:48.000 --> 31:50.000
roughly how much water

31:50.000 --> 31:52.000
they'll be using to fill that

31:52.000 --> 31:54.000
time frame so we can make sure

31:54.000 --> 31:56.000
that works with our water plan

31:56.000 --> 31:58.000
condition.

31:58.000 --> 32:00.000
And that's in writing or is that

32:00.000 --> 32:02.000
just that's what we want or

32:02.000 --> 32:04.000
that's what we know?

32:04.000 --> 32:06.000
What?

32:06.000 --> 32:08.000
That's what we want to do.

32:08.000 --> 32:10.000
Work with me.

32:10.000 --> 32:12.000
I'll work with you.

32:12.000 --> 32:14.000
Right.

32:14.000 --> 32:16.000
To my knowledge.

32:16.000 --> 32:18.000
There's an agreement but there's

32:18.000 --> 32:20.000
emails that they provided us

32:20.000 --> 32:22.000
and we've talked to them.

32:22.000 --> 32:24.000
Okay.

32:24.000 --> 32:26.000
Do we have any if they don't

32:26.000 --> 32:28.000
tell the truth do we have any

32:28.000 --> 32:30.000
ability to walk this back?

32:30.000 --> 32:32.000
Yes.

32:32.000 --> 32:34.000
They use more water than we can

32:34.000 --> 32:36.000
do.

32:36.000 --> 32:38.000
If we're talking about

32:38.000 --> 32:40.000
the wild so that that's where

32:40.000 --> 32:42.000
my two recommendations come

32:42.000 --> 32:44.000
if we get their

32:44.000 --> 32:46.000
because they report to the DNR

32:46.000 --> 32:48.000
annually.

32:48.000 --> 32:50.000
They're useless.

32:50.000 --> 32:52.000
So we can ask for monthly.

32:52.000 --> 32:54.000
We could ask for weekly and

32:54.000 --> 32:56.000
whatever we want but it just

32:56.000 --> 32:58.000
becomes a matter of handling all

32:58.000 --> 33:00.000
the data.

33:00.000 --> 33:02.000
Okay.

33:02.000 --> 33:04.000
So the gray water out of the

33:04.000 --> 33:06.000
wells.

33:06.000 --> 33:08.000
What is their plan for that?

33:08.000 --> 33:10.000
That is going to a holding tank

33:10.000 --> 33:12.000
and they

33:12.000 --> 33:14.000
pump that holding tank when it's

33:14.000 --> 33:16.000
full and they pump that

33:16.000 --> 33:18.000
holding tank where?

33:18.000 --> 33:20.000
They either haul it to our

33:20.000 --> 33:22.000
remote dump site or to another

33:22.000 --> 33:24.000
facility.

33:24.000 --> 33:26.000
And that is metered?

33:26.000 --> 33:28.000
That would not be metered.

33:28.000 --> 33:30.000
That you just rely on the

33:30.000 --> 33:32.000
way we rely on people

33:32.000 --> 33:34.000
sewer and water bills.

33:34.000 --> 33:36.000
At home.

33:36.000 --> 33:38.000
If they come to us with the

33:38.000 --> 33:40.000
waste we can tell by how many

33:40.000 --> 33:42.000
take-your-trucks come.

33:42.000 --> 33:46.000
And we accept waste from other

33:46.000 --> 33:48.000
companies and process

33:48.000 --> 33:50.000
that at our waste facility

33:50.000 --> 33:52.000
correct?

33:52.000 --> 33:54.000
Yes.

33:54.000 --> 33:56.000
And that we test

33:56.000 --> 33:58.000
if there's any reason that we're

33:58.000 --> 34:00.000
suspicious about it but

34:00.000 --> 34:02.000
generally we don't test.

34:02.000 --> 34:04.000
Correct.

34:04.000 --> 34:06.000
Okay.

34:06.000 --> 34:08.000
If that's the case would we

34:08.000 --> 34:10.000
just test to be on the safe

34:10.000 --> 34:12.000
side?

34:12.000 --> 34:14.000
I mean there is a cost.

34:14.000 --> 34:16.000
Right.

34:16.000 --> 34:18.000
And what about how much would that

34:18.000 --> 34:20.000
cost be to do testing?

34:20.000 --> 34:22.000
You don't have to give me a number

34:22.000 --> 34:24.000
now but a ballpark.

34:24.000 --> 34:26.000
Like thousands of dollars?

34:26.000 --> 34:28.000
Yes.

34:28.000 --> 34:30.000
We're doing standard

34:30.000 --> 34:32.000
BOD nutrient testing.

34:32.000 --> 34:34.000
BOD tell me what that means.

34:34.000 --> 34:36.000
Biological oxygen man.

34:36.000 --> 34:38.000
Thank you.

34:38.000 --> 34:40.000
That's a typical measurement at the

34:40.000 --> 34:42.000
wastewater plant.

34:42.000 --> 34:44.000
Okay.

34:44.000 --> 34:46.000
A couple hundred bucks.

34:46.000 --> 34:48.000
If we start getting heavy

34:48.000 --> 34:50.000
metals.

34:50.000 --> 34:52.000
Volatiles.

34:52.000 --> 34:54.000
I would have no reason to suspect

34:54.000 --> 34:55.000
we're getting any of that.

34:55.000 --> 34:57.000
I would have to expect the DNR

34:57.000 --> 34:59.000
to do to safeguard what's going

34:59.000 --> 35:01.000
on.

35:01.000 --> 35:03.000
Is it reasonable for us to

35:03.000 --> 35:05.000
expect that?

35:05.000 --> 35:07.000
I

35:07.000 --> 35:09.000
DNR is only going to hear

35:09.000 --> 35:11.000
results once a year.

35:11.000 --> 35:13.000
So I mean they have a lot

35:13.000 --> 35:15.000
heavier hammer than we are but

35:15.000 --> 35:17.000
I would not anticipate that

35:17.000 --> 35:19.000
they're doing literally

35:19.000 --> 35:21.000
inspections or anything like that.

35:21.000 --> 35:23.000
Okay.

35:24.000 --> 35:26.000
Thank you for your time.

35:26.000 --> 35:27.000
All right.

35:27.000 --> 35:29.000
Any other questions comments?

35:29.000 --> 35:31.000
Yeah.

35:31.000 --> 35:33.000
So do we know if the applicant has

35:33.000 --> 35:35.000
begun drawing water from the wells?

35:35.000 --> 35:37.000
Is this a formality that like

35:37.000 --> 35:39.000
or if this gets approved tonight?

35:39.000 --> 35:41.000
Do they begin being able to do it

35:41.000 --> 35:43.000
tomorrow or?

35:43.000 --> 35:45.000
I

35:45.000 --> 35:47.000
I don't know if they're using it

35:47.000 --> 35:49.000
currently.

35:49.000 --> 35:51.000
My suspicion is because these are

35:51.000 --> 35:53.000
wells that they probably are being

35:53.000 --> 35:55.000
used.

35:55.000 --> 35:57.000
Certainly to some extent because

35:57.000 --> 35:59.000
we went out and did back

35:59.000 --> 36:01.000
T which is bacteria testing

36:01.000 --> 36:03.000
on them to make sure they make sure

36:03.000 --> 36:05.000
they're not equal like contaminated

36:05.000 --> 36:07.000
so that in their

36:07.000 --> 36:09.000
negative that would tell me that

36:09.000 --> 36:11.000
there's been some they're being

36:11.000 --> 36:13.000
used.

36:13.000 --> 36:15.000
Okay.

36:15.000 --> 36:17.000
I'll just add a high level.

36:17.000 --> 36:19.000
I'll say I don't necessarily like

36:19.000 --> 36:22.000
the

36:22.000 --> 36:24.000
information that I've brought about

36:24.000 --> 36:26.000
as others spoke about

36:26.000 --> 36:28.000
transparency in community

36:28.000 --> 36:30.000
updates.

36:30.000 --> 36:31.000
We have you know if you go to

36:31.000 --> 36:33.000
Vanna to D.C.

36:33.000 --> 36:35.000
Lighthouse campus.com.

36:35.000 --> 36:37.000
It's a partnership built on trust.

36:37.000 --> 36:39.000
And the construction updates

36:39.000 --> 36:41.000
pages like one page hasn't been

36:41.000 --> 36:43.000
updated since April.

36:43.000 --> 36:45.000
It's got one picture of the

36:45.000 --> 36:47.000
detour for late drive so and

36:47.000 --> 36:49.000
I'm sure I've seen grocery stores

36:49.000 --> 36:51.000
and banks that do a better job of

36:51.000 --> 36:53.000
communicating their construction status

36:53.000 --> 36:55.000
to the local community.

36:55.000 --> 36:57.000
And this would be a good example of

36:57.000 --> 36:59.000
something that should have been

36:59.000 --> 37:01.000
a little bit more proactive.

37:01.000 --> 37:03.000
But you know even if I said all

37:03.000 --> 37:05.000
the aside I guess if I were

37:05.000 --> 37:07.000
evaluating this for like a local

37:07.000 --> 37:09.000
business who was trying to make

37:09.000 --> 37:11.000
money but also concerned about

37:11.000 --> 37:13.000
protecting natural resources my

37:13.000 --> 37:15.000
question would be do we have

37:15.000 --> 37:17.000
maybe this is already available

37:17.000 --> 37:19.000
but do we have like a third

37:19.000 --> 37:21.000
party certified list of all the

37:21.000 --> 37:23.000
chemical solvents diesel fuel

37:23.000 --> 37:25.000
all those kind of things that

37:25.000 --> 37:27.000
could potentially enter into the

37:27.000 --> 37:29.000
aquifer and then like what would

37:29.000 --> 37:31.000
be the emergency plan if

37:31.000 --> 37:33.000
you know like a

37:33.000 --> 37:35.000
notification and containment

37:35.000 --> 37:37.000
plan if there were a spill if

37:37.000 --> 37:39.000
there were a thousand gallon diesel

37:39.000 --> 37:41.000
spill or something you know

37:41.000 --> 37:43.000
is that something that the city

37:43.000 --> 37:45.000
is aware of?

37:45.000 --> 37:47.000
I am not I mean I would

37:47.000 --> 37:49.000
I would anticipate that they would

37:49.000 --> 37:51.000
have

37:51.000 --> 37:53.000
SDS sheets for all

37:53.000 --> 37:55.000
their chemicals are using

37:55.000 --> 37:57.000
OSHA requirement

37:59.000 --> 38:01.000
spill containment

38:01.000 --> 38:03.000
they would

38:03.000 --> 38:05.000
likely have a spill containment

38:05.000 --> 38:07.000
SPCC plan some sort

38:07.000 --> 38:09.000
but that wouldn't be shared with us

38:09.000 --> 38:11.000
the fire department might know

38:11.000 --> 38:13.000
something about that it probably was

38:13.000 --> 38:15.000
filed with the county emergency

38:15.000 --> 38:17.000
management office because they have

38:17.000 --> 38:19.000
the hazmat team and deal with

38:19.000 --> 38:21.000
that sort of thing

38:21.000 --> 38:23.000
okay I guess my other comment would be

38:23.000 --> 38:25.000
and I

38:25.000 --> 38:27.000
I'd like to see

38:27.000 --> 38:29.000
some sort of sunset date put on

38:29.000 --> 38:31.000
this as well

38:31.000 --> 38:33.000
I know this gets renewed every

38:33.000 --> 38:35.000
five years but

38:35.000 --> 38:37.000
you know I think right now it says

38:37.000 --> 38:39.000
until city water is connected or

38:39.000 --> 38:41.000
construction is complete or something

38:41.000 --> 38:43.000
you know if I keep

38:43.000 --> 38:45.000
if I keep a 10 by 10 concrete pad

38:45.000 --> 38:47.000
on my property and I add a brick to it

38:47.000 --> 38:49.000
every day am I still under

38:49.000 --> 38:51.000
construction

38:51.000 --> 38:53.000
so I'd like to see

38:53.000 --> 38:55.000
like whatever the anticipated

38:55.000 --> 38:57.000
construction completion date is

38:57.000 --> 38:59.000
plus six months or something like that

38:59.000 --> 39:01.000
put on like at this point

39:01.000 --> 39:03.000
public works

39:03.000 --> 39:05.000
or the public works

39:05.000 --> 39:07.000
committee members could come in and

39:07.000 --> 39:09.000
provide that the wells have been

39:09.000 --> 39:11.000
capped well and I would

39:11.000 --> 39:13.000
I would recommend on that

39:13.000 --> 39:15.000
and we're planning on having

39:15.000 --> 39:17.000
water up there

39:17.000 --> 39:19.000
by August next year so if you

39:19.000 --> 39:21.000
want to say end of September

39:21.000 --> 39:23.000
or you could go into the year

39:23.000 --> 39:25.000
if you're fuel gracious but

39:25.000 --> 39:27.000
that'd be something for the board

39:27.000 --> 39:29.000
to consider

39:29.000 --> 39:31.000
yeah I guess those are my comments

39:31.000 --> 39:33.000
as it's currently structured I

39:33.000 --> 39:35.000
wouldn't be in support

39:35.000 --> 39:37.000
of any of the questions being answered

39:39.000 --> 39:41.000
Roger would you just maybe

39:41.000 --> 39:43.000
you mentioned it but you just clarify

39:43.000 --> 39:45.000
how they're planning to fill the closed

39:45.000 --> 39:47.000
loop system if

39:47.000 --> 39:49.000
city water isn't going to be there until

39:49.000 --> 39:51.000
August and you said they were looking to

39:51.000 --> 39:53.000
start doing that first quarter

39:53.000 --> 39:55.000
well the city water is coming up

39:55.000 --> 39:57.000
from a self-end

39:57.000 --> 39:59.000
they're building that that through their

39:59.000 --> 40:01.000
site currently so that's

40:01.000 --> 40:03.000
on them to get that

40:03.000 --> 40:05.000
lateral done yeah

40:05.000 --> 40:07.000
yeah but if they want to

40:07.000 --> 40:09.000
if they want to have their closed

40:09.000 --> 40:11.000
loop system on schedule

40:11.000 --> 40:13.000
it's on them to get the water up there

40:13.000 --> 40:15.000
okay

40:15.000 --> 40:17.000
if we

40:17.000 --> 40:19.000
if we deny the request

40:19.000 --> 40:21.000
how does that affect the business the seed

40:21.000 --> 40:23.000
business that has

40:23.000 --> 40:25.000
continued to use that one well for their

40:25.000 --> 40:27.000
normal operations

40:33.000 --> 40:35.000
I guess I'd have to throw that

40:35.000 --> 40:37.000
legal question but

40:37.000 --> 40:39.000
I think certainly if we

40:39.000 --> 40:41.000
deny use of the wells

40:41.000 --> 40:43.000
in a requirement cap

40:43.000 --> 40:45.000
that's

40:45.000 --> 40:47.000
they'd be out of water

40:49.000 --> 40:51.000
what is the

40:51.000 --> 40:53.000
urgency to

40:53.000 --> 40:55.000
have this approved

40:55.000 --> 40:59.000
really

40:59.000 --> 41:03.000
really it's

41:03.000 --> 41:05.000
for compliance with DNR regulations that

41:05.000 --> 41:07.000
any

41:07.000 --> 41:11.000
municipal or any groundwater wells

41:11.000 --> 41:13.000
in a city because we're on a municipal

41:13.000 --> 41:15.000
system that's required to be permitted

41:15.000 --> 41:19.000
every five years okay

41:19.000 --> 41:23.000
so

41:23.000 --> 41:25.000
all right

41:25.000 --> 41:27.000
yeah

41:27.000 --> 41:29.000
I just would point out if they were

41:29.000 --> 41:31.000
going to use the wells for filling their

41:31.000 --> 41:33.000
closed loop system they would have to build

41:33.000 --> 41:35.000
a significant amount of infrastructure to get

41:35.000 --> 41:37.000
these wells connected to their

41:37.000 --> 41:39.000
closed loop system too and it

41:39.000 --> 41:41.000
is nowhere near the capacity of what the city

41:41.000 --> 41:43.000
or water would be

41:43.000 --> 41:45.000
so I'm not sure that makes

41:45.000 --> 41:47.000
a lot of sense to expect they would realistically

41:47.000 --> 41:49.000
do that it also would

41:49.000 --> 41:51.000
most likely be pretty hard

41:51.000 --> 41:53.000
water and have a bunch of extra minerals in it

41:53.000 --> 41:55.000
they would have to remove that they don't

41:55.000 --> 41:57.000
have to deal with with city water so

41:57.000 --> 41:59.000
I don't find it a compelling

41:59.000 --> 42:01.000
argument that they would

42:01.000 --> 42:03.000
use it for their closed loop system

42:03.000 --> 42:05.000
there's too many disadvantages for them

42:05.000 --> 42:07.000
to do that

42:07.000 --> 42:09.000
so my understanding

42:09.000 --> 42:11.000
too the sites for this are all

42:11.000 --> 42:13.000
north of lake drive the three remaining

42:13.000 --> 42:15.000
wells yes yes

42:15.000 --> 42:17.000
so everything is being built south of lake

42:17.000 --> 42:19.000
drive so it's

42:19.000 --> 42:21.000
further construction for if they were to do that

42:21.000 --> 42:23.000
plus they'd have to cross

42:23.000 --> 42:25.000
lake drive and get our permission

42:25.000 --> 42:27.000
to put a pipe

42:27.000 --> 42:29.000
connect crossing lake drive

42:29.000 --> 42:31.000
so they couldn't just do that

42:31.000 --> 42:33.000
unless they were going to load them on the trucks

42:33.000 --> 42:35.000
and tanker it over which

42:35.000 --> 42:37.000
would seem pretty an efficient way to go about it

42:37.000 --> 42:39.000
so I don't find it a compelling

42:39.000 --> 42:43.000
concern that that's what they're going to use the water for

42:43.000 --> 42:45.000
so

42:45.000 --> 42:47.000
yeah

42:47.000 --> 42:49.000
and they're using this for

42:49.000 --> 42:51.000
their homes and their

42:51.000 --> 42:53.000
and their offices use basic

42:53.000 --> 42:55.000
primarily so now

42:57.000 --> 42:59.000
silence please

42:59.000 --> 43:01.000
please silence

43:01.000 --> 43:03.000
or I will ask to have you

43:03.000 --> 43:05.000
removed

43:07.000 --> 43:09.000
do you want to try it

43:09.000 --> 43:11.000
no then

43:11.000 --> 43:13.000
be quiet silence

43:13.000 --> 43:17.000
all right

43:17.000 --> 43:21.000
so I guess I will entertain

43:21.000 --> 43:25.000
a motion on this item

43:25.000 --> 43:29.000
please

43:29.000 --> 43:33.000
I've asked

43:33.000 --> 43:37.000
for you to remain silent

43:37.000 --> 43:41.000
if you want to talk you can go outside into the hall

43:41.000 --> 43:45.000
you can talk as much as you want out there

43:45.000 --> 43:49.000
just to add

43:49.000 --> 43:51.000
just to add to your question

43:51.000 --> 43:53.000
a motion so so this board

43:53.000 --> 43:57.000
their motion would be to recommend the city council

43:57.000 --> 44:01.000
city council is the one that will issue the permit

44:01.000 --> 44:05.000
all right so it would be if we want to do a motion that we're going to include

44:05.000 --> 44:09.000
any time limits metering anything like that this would be

44:09.000 --> 44:13.000
a good place to put that in as a recommendation

44:13.000 --> 44:17.000
I would like to make a motion to postpone this until we can draft

44:17.000 --> 44:21.000
a better response

44:21.000 --> 44:25.000
hasn't happened so

44:25.000 --> 44:29.000
I think we can because they're going to

44:29.000 --> 44:33.000
correct me if I'm wrong that they

44:33.000 --> 44:37.000
can and will be continuing to use the water even if we don't

44:37.000 --> 44:41.000
issue that permit today it's not like anybody's going to go in there and stop

44:41.000 --> 44:45.000
them correct I would not anticipate that

44:45.000 --> 44:49.000
I didn't think so either so

44:49.000 --> 44:53.000
all right um for a motion to postpone we need a

44:53.000 --> 44:57.000
date certain date certain yes which I believe our next meeting is

44:57.000 --> 45:01.000
I 30 on August 11th

45:01.000 --> 45:05.000
it's the next scheduled meeting

45:05.000 --> 45:09.000
yes unless you want

45:09.000 --> 45:13.000
a special one I have a question that does the motion

45:13.000 --> 45:17.000
include what we need to see for the next meeting

45:17.000 --> 45:21.000
or is it just to develop a better plan she's making the motion right now

45:21.000 --> 45:25.000
so does it include that um there hasn't been a second yet

45:25.000 --> 45:29.000
so you she can take a friendly amendment

45:29.000 --> 45:33.000
or we can second it and then you can move to amend the motion

45:33.000 --> 45:37.000
I'm happy to take a friendly

45:37.000 --> 45:41.000
all right so what explicitly do we want

45:41.000 --> 45:45.000
to be brought to the sport then

45:45.000 --> 45:49.000
I mean I would like to at least see

45:49.000 --> 45:53.000
an emergency plan as a documented emergency plan as well

45:53.000 --> 45:57.000
as a sunset date on it

45:57.000 --> 46:01.000
I don't know how specific we need to be

46:01.000 --> 46:05.000
what would an emergency plan be related to this well just like

46:05.000 --> 46:09.000
the chemicals and site and how much diesel fuel we

46:09.000 --> 46:13.000
how is that relevant to the well because

46:13.000 --> 46:17.000
if they have diesel fuel on the site and they spill it that's completely

46:17.000 --> 46:21.000
irrelevant to this item it could enter

46:21.000 --> 46:25.000
into the aquifer it could happen if we don't approve this and they spill it

46:25.000 --> 46:29.000
still enter into the aquifer it's kind of irrelevant to this

46:29.000 --> 46:33.000
we can ask for it and say that we want that but I think it's irrelevant

46:33.000 --> 46:37.000
so what I think I'm hearing

46:37.000 --> 46:41.000
is distinct timelines when it will begin when it will end

46:41.000 --> 46:45.000
any testing that is deemed appropriate by the city

46:45.000 --> 46:51.000
and if metering is appropriate to flesh that out a little bit more

46:51.000 --> 46:55.000
and a finite that they will not be using well water

46:55.000 --> 46:59.000
within the closed loop system

46:59.000 --> 47:03.000
and have metered greywatered

47:03.000 --> 47:07.000
metered going out, metered coming back in so that it can

47:07.000 --> 47:11.000
be matched

47:15.000 --> 47:19.000
all right so I'd probably call it black water more than grey water but

47:19.000 --> 47:23.000
same difference okay so the most well first off

47:23.000 --> 47:27.000
so the motion includes that this will be postponed

47:27.000 --> 47:31.000
until the August 11th meeting of the Board of Public Works

47:31.000 --> 47:35.000
it is to include a

47:35.000 --> 47:39.000
definitive time such a sunset date and a

47:39.000 --> 47:43.000
beginning date when this will be applicable

47:43.000 --> 47:47.000
it will include

47:47.000 --> 47:51.000
whether or not this water will be used in a closed use system

47:51.000 --> 47:55.000
and do we want to include the emergency plan as much

47:55.000 --> 47:59.000
I think that's irrelevant if you want to include that we can

47:59.000 --> 48:03.000
I'd like to see it in there what do you think?

48:03.000 --> 48:07.000
Okay and emergency plan all right so

48:07.000 --> 48:11.000
then I hope you've got it written

48:11.000 --> 48:15.000
down so we're looking for

48:15.000 --> 48:19.000
an emergency plan date certain

48:19.000 --> 48:23.000
that whether it will be used in a closed loop system

48:23.000 --> 48:27.000
and the motion will postpone this item

48:27.000 --> 48:31.000
until August 11th at which time that information will be brought back to us that's correct

48:31.000 --> 48:35.000
do I have everything? Yes sir. Okay is there a second on that item?

48:35.000 --> 48:39.000
Second. Second by Alderman Beaster. Is there any discussion

48:39.000 --> 48:43.000
on the motion? All right seeing none

48:43.000 --> 48:47.000
those in favor say aye. Aye. Opposed? Motion carries.

48:47.000 --> 48:51.000
All right.

48:51.000 --> 48:55.000
All right

48:55.000 --> 48:59.000
that brings us to item seven consideration and possible action

48:59.000 --> 49:03.000
on a proposed stormwater and erosion control ordinance

49:03.000 --> 49:07.000
or both of them ordinances

49:07.000 --> 49:11.000
Okay you can leave this and we'll go ahead

49:11.000 --> 49:15.000
so we've been working on our erosion control and stormwater ordinances

49:15.000 --> 49:19.000
along with our stormwater management plan which we gave an overview of last week

49:19.000 --> 49:23.000
and I'll have Aaron Volkening from Stantek kind of

49:23.000 --> 49:27.000
briefly go over

49:27.000 --> 49:31.000
what's included in those ordinances

49:35.000 --> 49:39.000
Is this sounds like a time right?

49:39.000 --> 49:43.000
So relevant to the city's municipal stormwater management program

49:43.000 --> 49:47.000
there are two chapters of the city ordinance

49:47.000 --> 49:51.000
chapter 473

49:51.000 --> 49:55.000
titled stormwater management really covers what we call post construction

49:55.000 --> 49:59.000
stormwater management requirements you know what

49:59.000 --> 50:03.000
land development has to permanently put in place to manage stormwater

50:03.000 --> 50:07.000
once the construction phase is done. There's also chapter 446

50:07.000 --> 50:11.000
erosion control which covers erosion

50:11.000 --> 50:15.000
and sediment control related to stormwater runoff during construction

50:15.000 --> 50:19.000
as part of the overall city stormwater

50:19.000 --> 50:23.000
management plan we reviewed those ordinances I know you did make some changes

50:23.000 --> 50:27.000
to them I believe a couple years ago which were good

50:27.000 --> 50:31.000
as part of this stormwater management plan we did a comprehensive review of those ordinances

50:31.000 --> 50:35.000
and are recommending some changes to both chapters

50:35.000 --> 50:39.000
for chapter 473 the stormwater management ordinance

50:39.000 --> 50:43.000
I'd say the major changes are

50:43.000 --> 50:47.000
the ordinance would require new land

50:47.000 --> 50:51.000
development to meet phosphorus reduction requirements that are

50:51.000 --> 50:55.000
in the TMDL the total maximum daily load

50:55.000 --> 50:59.000
that DNR and EPA have set forth

50:59.000 --> 51:03.000
for the city they're actually two different TMDL's

51:03.000 --> 51:07.000
so the TMDL requires the city

51:07.000 --> 51:11.000
to in the long run make

51:11.000 --> 51:15.000
phosphorus reductions to run off the city

51:15.000 --> 51:19.000
is going to be legally hold held to those requirements through their

51:19.000 --> 51:23.000
MS4 permit stormwater discharge permit although the timing of that is not yet

51:23.000 --> 51:27.000
set so what the ordinance change does is that

51:27.000 --> 51:31.000
it makes new development follow those same

51:31.000 --> 51:35.000
hazards if the ordinance

51:35.000 --> 51:39.000
didn't include those TMDL requirements what would happen

51:39.000 --> 51:43.000
would be as soon as a property

51:43.000 --> 51:47.000
developed the city would be getting further away from your long-term

51:47.000 --> 51:51.000
compliance target so these targets

51:51.000 --> 51:55.000
are higher than the statewide sort of general

51:55.000 --> 51:59.000
requirements for phosphorus reduction in stormwater they're higher than the current requirements

51:59.000 --> 52:03.000
but they're they're much required by the TMDL

52:03.000 --> 52:07.000
you get credit as part of your

52:07.000 --> 52:11.000
TMDL compliance for adapting

52:11.000 --> 52:15.000
these these phosphorus requirements the DNR doesn't explicitly tell you

52:15.000 --> 52:19.000
your ordinance has to follow the TMDL requirements

52:19.000 --> 52:23.000
but you're going to have a problem with compliance if you don't put this

52:23.000 --> 52:27.000
in your ordinance basically we also would

52:27.000 --> 52:31.000
recommend that a fee in lieu system be applied

52:31.000 --> 52:35.000
you know there might be situations where because of site constraints

52:35.000 --> 52:39.000
it is you know simply not possible to

52:39.000 --> 52:43.000
meet those phosphorus reduction requirements they are pretty stringent

52:43.000 --> 52:47.000
in which case there would be potentially

52:47.000 --> 52:51.000
the city could potentially entertain a fee in lieu of payment

52:51.000 --> 52:55.000
the ordinance wouldn't set forth that payment schedule that would

52:55.000 --> 52:59.000
be adopted separately another major change I guess

52:59.000 --> 53:03.000
is establishing a

53:03.000 --> 53:07.000
recertification program for privately owned stormwater BMPs

53:07.000 --> 53:11.000
things like detention ponds by retention cells

53:11.000 --> 53:15.000
stuff like that right now there's some language in the ordinance that

53:15.000 --> 53:19.000
you know is kind of general about

53:19.000 --> 53:23.000
some some kind of minimal level of annual reporting and stuff like that

53:23.000 --> 53:27.000
the DNR is

53:27.000 --> 53:31.000
basically wanting municipalities to

53:31.000 --> 53:35.000
you know be more diligent and strict about record keeping

53:35.000 --> 53:39.000
and the maintenance and inspection of privately owned facilities

53:39.000 --> 53:43.000
so this is one approach a lot of municipalities have taken

53:43.000 --> 53:47.000
they require every certain number of years that

53:47.000 --> 53:51.000
the owner of a private facility do a formal inspection

53:51.000 --> 53:55.000
it has to be certified either by a professional

53:55.000 --> 53:59.000
engineer a professional landscape architect

53:59.000 --> 54:03.000
a professional surveyor and you know basically inspect the facility

54:03.000 --> 54:07.000
verify that it is working okay verify that it's still

54:07.000 --> 54:11.000
you know is generally in accordance with its original design

54:11.000 --> 54:15.000
and submit that to the city something that other

54:15.000 --> 54:19.000
municipalities have used successfully there's also some

54:19.000 --> 54:23.000
some of the language in the ordinance was out of date with regards

54:23.000 --> 54:27.000
to things like current rainfall data that's used

54:27.000 --> 54:31.000
references to current DNR standards there's some

54:31.000 --> 54:35.000
updates that are necessary to bring that into play

54:35.000 --> 54:39.000
with regards to chapter 446 the erosion control ordinance

54:39.000 --> 54:43.000
we're incorporating there

54:43.000 --> 54:47.000
for the last I don't know eight to ten years or so

54:47.000 --> 54:51.000
state level there have been numeric requirements for sediment control

54:51.000 --> 54:55.000
during construction

54:55.000 --> 54:59.000
basically you have to do BMPs construction BMPs things like

54:59.000 --> 55:03.000
silt fence sediment traps inlet filters stuff like that

55:03.000 --> 55:07.000
to minimize sediment that's running off the site

55:07.000 --> 55:11.000
at a state level that's already required so the ordinance

55:11.000 --> 55:15.000
the municipal ordinance is inconsistent with the state requirements right now

55:15.000 --> 55:19.000
it's just best practice to bring those in line with state requirements

55:19.000 --> 55:23.000
it's not going to change what you know what developers do

55:23.000 --> 55:27.000
or the cost to them because they already have to meet the state requirements

55:27.000 --> 55:31.000
and they have to get a state approval called a notice of intent for construction

55:31.000 --> 55:35.000
site so it would not change that

55:35.000 --> 55:39.000
we need to adjust the size of the

55:39.000 --> 55:43.000
development that the ordinance already talks about two different levels of erosion

55:43.000 --> 55:47.000
control plan that are required right now

55:47.000 --> 55:51.000
a more detailed plan is required for sites over five acres

55:51.000 --> 55:55.000
a less detailed plan is required for sites under five acres

55:55.000 --> 55:59.000
that was based on some earlier state and federal regulation

55:59.000 --> 56:03.000
since that has happened the new breakpoint according to state and federal

56:03.000 --> 56:07.000
regs is one acre everything over an acre needs a

56:07.000 --> 56:11.000
detailed erosion control plan the city has

56:11.000 --> 56:15.000
the option of requiring a less stringent plan

56:15.000 --> 56:19.000
of some kind a more general plan for sites under an acre

56:19.000 --> 56:23.000
you already have that you know there's a minimum size where nothing has to be

56:23.000 --> 56:27.000
done I can't remember the exact number a certain number of

56:27.000 --> 56:31.000
square feet but you know we would again just recommend that the ordinance

56:31.000 --> 56:35.000
be changed be consistent with state requirements

56:35.000 --> 56:39.000
again it's not going to require the developer to really

56:39.000 --> 56:43.000
add cost or do anything different because to meet state standards they already have to do this

56:43.000 --> 56:47.000
detailed erosion control for over an acre it's just bringing it

56:47.000 --> 56:51.000
into alignment with state requirements the other

56:51.000 --> 56:55.000
thing you know that that's sort of a notable change is

56:55.000 --> 56:59.000
we're adding language the erosion control ordinance that

56:59.000 --> 57:03.000
codifies that a fee must be paid there's a

57:03.000 --> 57:07.000
some discrepancy in the existing ordinance right now there's some sections to talk about

57:07.000 --> 57:11.000
you know the ability of the city to charge a fee but

57:11.000 --> 57:15.000
it's honestly not super clear as far as whether the city is

57:15.000 --> 57:19.000
actually going to charge a fee I don't think you do right now

57:19.000 --> 57:23.000
correct me if I'm wrong you know most most means pouties do charge

57:23.000 --> 57:27.000
a fee for erosion control plans it's usually

57:27.000 --> 57:31.000
scaled you know single family homes there's a smaller fee for

57:31.000 --> 57:35.000
an entire subdivision there would be a larger fee you know so the recommendation

57:35.000 --> 57:39.000
the way the ordinance is written right now you know

57:39.000 --> 57:43.000
or the recommended revised ordinance explicitly

57:43.000 --> 57:47.000
says that the city is going to charge a fee for erosion control permits

57:47.000 --> 57:51.000
being issued if you don't want to charge a fee at all then

57:51.000 --> 57:55.000
there's probably some changes that would modify

57:55.000 --> 57:59.000
a couple other sections the ordinance to take out the implication there is a fee

57:59.000 --> 58:03.000
so I think those are the the substantive changes

58:03.000 --> 58:07.000
I don't know Roger if there's anything else that you want to mention that I forgot to mention

58:07.000 --> 58:11.000
we do we do charge an erosion control fee okay

58:11.000 --> 58:15.000
okay so then it's it's more of a matter of just

58:15.000 --> 58:19.000
clarifying the ordinance language on that one we charge your okay

58:19.000 --> 58:23.000
alright any comments or questions

58:23.000 --> 58:27.000
I have one question for you so this has a minimum area

58:27.000 --> 58:31.000
that the erosion control ordinance

58:31.000 --> 58:35.000
has a it's applicable applicable to a minimum area of

58:35.000 --> 58:39.000
4,000 square feet would I be correct in assuming

58:39.000 --> 58:43.000
that for an area smaller than that that this

58:43.000 --> 58:47.000
still could be enforceful but it's enforceable but it's

58:47.000 --> 58:51.000
up to the discretion of the building inspector to enforce it

58:51.000 --> 58:55.000
or is this just not applicable at all if it's less than

58:55.000 --> 58:59.000
4,000 square feet I'd have to check the language I think

58:59.000 --> 59:03.000
there's language in the ordinance that sort of if if a problem is apparent

59:03.000 --> 59:07.000
it gives the city the discretion to enforce

59:07.000 --> 59:11.000
you know standards for

59:11.000 --> 59:15.000
for smaller sites or if you know if there's a concern

59:15.000 --> 59:19.000
going into construction the city I believe has that authority

59:19.000 --> 59:23.000
okay yes I can think of one

59:23.000 --> 59:27.000
one erosion control issue that was a bit of a problem a few years back that would have been

59:27.000 --> 59:31.000
a border line on whether it was 4,000 square feet or not but it was on a steep slope

59:31.000 --> 59:35.000
and it eventually got resolved but

59:35.000 --> 59:39.000
that's why I'm asking because

59:39.000 --> 59:43.000
my understanding is that that still should be up to the discretion of the

59:43.000 --> 59:47.000
building inspector but I'm just not sure if this is directly applicable

59:47.000 --> 59:51.000
or if the building inspector would just have to give a separate order relative to that

59:51.000 --> 59:57.000
all right

59:57.000 --> 01:00:01.000
I just wanted to add something Mike that

01:00:01.000 --> 01:00:05.000
tangentially related we did we did know that these

01:00:05.000 --> 01:00:09.000
especially the TMDL standards were coming so the vantage site

01:00:09.000 --> 01:00:13.000
is underneath these numerical requirements so somebody

01:00:13.000 --> 01:00:17.000
administrative is not but when when we issued the

01:00:17.000 --> 01:00:21.000
water permit we had them beat these these higher requirements for the TMDL

01:00:21.000 --> 01:00:25.000
okay all right any other comments

01:00:25.000 --> 01:00:29.000
or questions otherwise I will entertain a motion on this item

01:00:29.000 --> 01:00:33.000
do we want the ordinances

01:00:33.000 --> 01:00:37.000
both approved separately or together or

01:00:37.000 --> 01:00:41.000
does it not matter

01:00:41.000 --> 01:00:45.000
well as long as it's probably best to do them separately okay

01:00:45.000 --> 01:00:49.000
all right then I will first look for a motion

01:00:49.000 --> 01:00:53.000
on I can find the ordinance

01:00:53.000 --> 01:00:57.000
number actually do we have an ordinance number on this

01:00:57.000 --> 01:01:01.000
because this is this code

01:01:01.000 --> 01:01:05.000
446

01:01:05.000 --> 01:01:09.000
so I guess we'll look for approval for section 446

01:01:09.000 --> 01:01:13.000
if anyone has a motion

01:01:13.000 --> 01:01:17.000
does it make a difference that they were presented to us in one

01:01:17.000 --> 01:01:21.000
item

01:01:21.000 --> 01:01:25.000
that's a good question maybe let's clarify

01:01:25.000 --> 01:01:29.000
um

01:01:29.000 --> 01:01:33.000
if this board approves of these changes

01:01:33.000 --> 01:01:37.000
Matt will be drafting an ordinance on the

01:01:37.000 --> 01:01:41.000
general government and finance so this is not us not our typical

01:01:41.000 --> 01:01:45.000
ordinance layout okay in that case I guess we're

01:01:45.000 --> 01:01:49.000
looking for approval on these items if the

01:01:49.000 --> 01:01:53.000
sense is someone wants to make an emotion to approve both that is fine or if you want to do

01:01:53.000 --> 01:01:57.000
one or the other um I don't see a problem

01:01:57.000 --> 01:02:01.000
either way so

01:02:01.000 --> 01:02:05.000
I'll make a move to recommend a common council approval of the stormwater and erosion control

01:02:05.000 --> 01:02:09.000
ordinances all right we have a motion by

01:02:09.000 --> 01:02:13.000
to approve uh the for the committee to approve

01:02:13.000 --> 01:02:17.000
both of these ordinances I'll second and a second by

01:02:17.000 --> 01:02:21.000
Alderman Miller any questions on the motion

01:02:21.000 --> 01:02:25.000
seeing none all those in favor say aye

01:02:25.000 --> 01:02:29.000
motion carries all right

01:02:29.000 --> 01:02:33.000
that'll bring us to we're running short on time but they'll bring us

01:02:33.000 --> 01:02:37.000
to item 8 consideration and possible action on the proposed valley creek

01:02:37.000 --> 01:02:41.000
scheduling project cost estimates and bridge treatments

01:02:41.000 --> 01:02:45.000
okay yep this is a project with with which

01:02:45.000 --> 01:02:49.000
hopefully everyone is pretty familiar now so this is valley creek

01:02:49.000 --> 01:02:53.000
and so at the June meeting the council at the June meeting

01:02:53.000 --> 01:02:57.000
the council the council considered um applying

01:02:57.000 --> 01:03:01.000
for grants from

01:03:01.000 --> 01:03:05.000
excuse me from the National Fish and Wildlife Foundation

01:03:05.000 --> 01:03:09.000
of um a total of three point ultimately it was

01:03:09.000 --> 01:03:13.000
for a total of three point eight million dollars with a local match that

01:03:13.000 --> 01:03:17.000
would come uh from

01:03:17.000 --> 01:03:21.000
LNRP which received a advantage donation and also

01:03:21.000 --> 01:03:25.000
from uh TID 5 which is supported by that development

01:03:25.000 --> 01:03:29.000
in any case um with that came

01:03:29.000 --> 01:03:33.000
some questions about uh timeline and and budgeting

01:03:33.000 --> 01:03:37.000
and so stantec put that together and so we

01:03:37.000 --> 01:03:41.000
made a presentation to the general government finance committee

01:03:41.000 --> 01:03:45.000
uh meeting uh which met on July 7th so

01:03:45.000 --> 01:03:49.000
we'd like to just quickly review that with you today and uh

01:03:49.000 --> 01:03:53.000
and this will also go to the council on August 4th

01:03:53.000 --> 01:03:57.000
and so I'll bring this up

01:04:03.000 --> 01:04:07.000
all right

01:04:07.000 --> 01:04:11.000
all right

01:04:11.000 --> 01:04:15.000
all right so there we go all right

01:04:15.000 --> 01:04:19.000
and

01:04:19.000 --> 01:04:23.000
so just kind of

01:04:23.000 --> 01:04:27.000
this is again from GDF and so this so that's why it's dated

01:04:27.000 --> 01:04:31.000
July 7th but just wanted to go a quick review of

01:04:31.000 --> 01:04:35.000
how we arrived at where where we are now so the background

01:04:35.000 --> 01:04:39.000
in the timeline so uh so any of you

01:04:39.000 --> 01:04:43.000
who are here back in June of 1996

01:04:43.000 --> 01:04:47.000
uh should remember um the historic flooding

01:04:47.000 --> 01:04:51.000
event which um which uh essentially

01:04:51.000 --> 01:04:55.000
washed away the ground that surrounds the existing

01:04:55.000 --> 01:04:59.000
box culvert that has proven to be too small to carry

01:04:59.000 --> 01:05:03.000
the the hundred year event and of course this was a storm event that was much

01:05:03.000 --> 01:05:07.000
larger than that and um

01:05:07.000 --> 01:05:11.000
similarly in uh

01:05:11.000 --> 01:05:15.000
2008 so um

01:05:15.000 --> 01:05:19.000
so 12 years later you know we had

01:05:19.000 --> 01:05:23.000
another event that wound up um flooding

01:05:23.000 --> 01:05:27.000
the underground parking for the high rise

01:05:27.000 --> 01:05:31.000
and unfortunately it took them well okay I'll

01:05:31.000 --> 01:05:35.000
get to that and so um so as a result

01:05:35.000 --> 01:05:39.000
of that flooding we experienced um we applied for uh

01:05:39.000 --> 01:05:43.000
grant from community development block grant funding source federal source

01:05:43.000 --> 01:05:47.000
grant funds and because of the flooding we were able to

01:05:47.000 --> 01:05:51.000
reconstruct the street which included in uh

01:05:51.000 --> 01:05:55.000
an emergency spillway across um

01:05:55.000 --> 01:05:59.000
the park um it also had a number of

01:05:59.000 --> 01:06:03.000
ancillary benefits like uh safer crosswalks

01:06:03.000 --> 01:06:07.000
and well defined parking areas improved landscaping um but this channeled

01:06:07.000 --> 01:06:11.000
the hundred year storm over overland which uh

01:06:11.000 --> 01:06:15.000
did not prove to be enough in 2018 um we had another

01:06:15.000 --> 01:06:19.000
major storm event but um I think it was this uh

01:06:19.000 --> 01:06:23.000
event that um caused the uh

01:06:23.000 --> 01:06:27.000
to recognize that they had um

01:06:27.000 --> 01:06:31.000
some uh shortcomings in their own stormwater

01:06:31.000 --> 01:06:35.000
uh system and so even

01:06:35.000 --> 01:06:39.000
so any filling of the storm sewer system in the street

01:06:39.000 --> 01:06:43.000
would result in flooding of the garage so that has been

01:06:43.000 --> 01:06:47.000
that has been rectified on their end that was a problem on their end during you know

01:06:47.000 --> 01:06:51.000
their construction of the building so that's why they have not flooded since

01:06:51.000 --> 01:06:55.000
so um fast forward just one year from

01:06:55.000 --> 01:06:59.000
2018-2019 stand tech created a

01:06:59.000 --> 01:07:03.000
technical memo um for the the city that

01:07:03.000 --> 01:07:07.000
provided some different um some different alternatives

01:07:07.000 --> 01:07:11.000
that uh could uh that the

01:07:11.000 --> 01:07:15.000
city could employ in order to improve um

01:07:15.000 --> 01:07:19.000
uh improve uh how the the city

01:07:19.000 --> 01:07:23.000
and the area or that sorry the street in the area was stand flooding and so

01:07:23.000 --> 01:07:27.000
uh the first was um reprofiling the the street

01:07:27.000 --> 01:07:31.000
and improving the swale that that proved um

01:07:31.000 --> 01:07:35.000
essentially um not feasible uh adding

01:07:35.000 --> 01:07:39.000
a parallel hundred year culvert um

01:07:39.000 --> 01:07:45.000
which uh again left the water filtration plant essentially surrounded by water

01:07:45.000 --> 01:07:49.000
a 500 year parallel culvert still um resulted in significant

01:07:49.000 --> 01:07:53.000
flooding uh in in the park and on the street

01:07:53.000 --> 01:07:57.000
over daylighted stream

01:07:57.000 --> 01:08:01.000
at the very least on the east side of lake street um

01:08:01.000 --> 01:08:05.000
essentially pulled that water away from the water plant but you can see there's still

01:08:05.000 --> 01:08:09.000
um ponding on the street

01:08:09.000 --> 01:08:13.000
okay in 2020 um we had another flood on

01:08:13.000 --> 01:08:17.000
May 17th um I remember that one well

01:08:17.000 --> 01:08:21.000
too and you can see in this upper right hand uh photo well

01:08:21.000 --> 01:08:25.000
just middle upper photo you can see

01:08:25.000 --> 01:08:29.000
essentially our our uh conveyance our stormwater conveyance

01:08:29.000 --> 01:08:33.000
through the park is uh working but not working well enough to

01:08:33.000 --> 01:08:37.000
prevent the street from flooding okay and then this is just from August

01:08:37.000 --> 01:08:41.000
to last year again um uh

01:08:41.000 --> 01:08:45.000
the street was underwater and you can see that it flooded our water plant

01:08:45.000 --> 01:08:49.000
and uh essentially um you know

01:08:49.000 --> 01:08:53.000
jeopardize our operations but uh fortunately um

01:08:53.000 --> 01:08:57.000
we uh were able to keep the plant running

01:08:57.000 --> 01:09:01.000
during that storm event so um

01:09:01.000 --> 01:09:05.000
so what's creating some of these problems we have existing stream conditions where

01:09:05.000 --> 01:09:09.000
we have um heavy erosion and um

01:09:09.000 --> 01:09:13.000
debris accumulation which of course gets watched uh

01:09:13.000 --> 01:09:17.000
down downstream and that is what resulted in this most recent storm

01:09:17.000 --> 01:09:21.000
causing the um causing the trash rack

01:09:21.000 --> 01:09:25.000
to fail rather than to essentially protect the um

01:09:25.000 --> 01:09:29.000
the uh head wall

01:09:29.000 --> 01:09:33.000
and these are again photos that are are pretty representative

01:09:33.000 --> 01:09:37.000
of what the creek looks like because of the um excessive down

01:09:37.000 --> 01:09:41.000
cutting and incisive uh nature of the the stream

01:09:41.000 --> 01:09:45.000
so uh

01:09:45.000 --> 01:09:49.000
Stantec has created some some rendering so you can again see the down cutting

01:09:49.000 --> 01:09:53.000
and and and sized um

01:09:53.000 --> 01:09:57.000
geometry of the the the stream okay

01:09:57.000 --> 01:10:01.000
so what this project will do is restore the natural uh

01:10:01.000 --> 01:10:05.000
geometry that of the or the geomorphology

01:10:05.000 --> 01:10:09.000
of the stream and restore the floodplain

01:10:09.000 --> 01:10:13.000
and essentially um slow down the water from uh

01:10:13.000 --> 01:10:17.000
flooding downstream and it also has of course aquatic

01:10:17.000 --> 01:10:21.000
benefits and other benefits to the ecosystem but um

01:10:21.000 --> 01:10:25.000
we want to have the excessive erosion and debris coming down

01:10:25.000 --> 01:10:29.000
stream so and this is just south of hails trail

01:10:29.000 --> 01:10:33.000
and uh so the restored channel includes like a

01:10:33.000 --> 01:10:37.000
step pool system which um has um

01:10:37.000 --> 01:10:41.000
uh riffles and pools

01:10:41.000 --> 01:10:45.000
here is also south of hails trail this is where we've had

01:10:45.000 --> 01:10:49.000
a um an armored section of the the

01:10:49.000 --> 01:10:53.000
creek wall failed several times and then a restored

01:10:53.000 --> 01:10:57.000
uh channel um is again what's uh

01:10:57.000 --> 01:11:01.000
intended by this project so some

01:11:01.000 --> 01:11:05.000
highlights we've received a number of grants both from um

01:11:05.000 --> 01:11:09.000
from the fun for like Michigan National Fish and Wildlife Wisconsin Coastal Management

01:11:09.000 --> 01:11:13.000
so you know we've spent no money on the city has

01:11:13.000 --> 01:11:17.000
has not spent any uh tax dollars on this this has all been

01:11:17.000 --> 01:11:21.000
gained from grants um we've had uh tremendous support from uh

01:11:21.000 --> 01:11:25.000
Senator Tammy Baldwin uh and and we hope to um

01:11:25.000 --> 01:11:29.000
we hope to have additional federal interest in

01:11:29.000 --> 01:11:33.000
supporting this project um we've had public information

01:11:33.000 --> 01:11:37.000
meetings uh for riparian property owners and now we're in the grant

01:11:37.000 --> 01:11:41.000
um application phase so if you've missed any of our previous

01:11:41.000 --> 01:11:45.000
meetings or you just missed our previous meetings you can go on

01:11:45.000 --> 01:11:49.000
our webpage and uh check out the presentations that are all

01:11:49.000 --> 01:11:53.000
online you can see we have many of them and and actually that's that's really not all of them

01:11:53.000 --> 01:11:57.000
but uh just kind of a highlight of um work we've done

01:11:57.000 --> 01:12:01.000
and then just another thing that we we hope to uh talk about

01:12:01.000 --> 01:12:05.000
today are some of the bridge treatments um so this is not

01:12:05.000 --> 01:12:09.000
really representative of the bridge this is not the bridge as designed this is a

01:12:09.000 --> 01:12:13.000
representation of it but the um finish on the on the

01:12:13.000 --> 01:12:17.000
sections uh is is what is representative so

01:12:17.000 --> 01:12:21.000
we have um kind of a natural stone

01:12:21.000 --> 01:12:25.000
finish or a uh

01:12:25.000 --> 01:12:29.000
field stone finish and I guess I should say this is the more natural

01:12:29.000 --> 01:12:33.000
the other one is more um more of a

01:12:33.000 --> 01:12:37.000
um formal cut stone finish

01:12:37.000 --> 01:12:41.000
so this other one is a more of a rough stone finish so we can have

01:12:41.000 --> 01:12:45.000
different we can have different treatments at each bridge but that was something

01:12:45.000 --> 01:12:49.000
uh we hope to talk about today I don't know if we'll get to finish this

01:12:49.000 --> 01:12:53.000
conversation but um that is the background

01:12:53.000 --> 01:12:57.000
and then I can pull up

01:12:57.000 --> 01:13:01.000
and we have Sarah Majoris here who can talk a little bit

01:13:01.000 --> 01:13:05.000
about uh the phasing and the funding so I think we just

01:13:05.000 --> 01:13:09.000
have seven slides left

01:13:09.000 --> 01:13:13.000
all right hi everyone I'm going to talk

01:13:13.000 --> 01:13:17.000
a little bit about you know where we're at now we're at about 90 design

01:13:17.000 --> 01:13:21.000
on the stream restoration portion and as Rob said we're in

01:13:21.000 --> 01:13:25.000
the in the process of phasing construction and applying for construction

01:13:25.000 --> 01:13:29.000
funding so our our phasing is

01:13:29.000 --> 01:13:33.000
was structured for a number of reasons one being

01:13:33.000 --> 01:13:37.000
to cut the budget so it's appropriate for the funds that we're asking for from

01:13:37.000 --> 01:13:41.000
different grant agencies to there are some fish

01:13:41.000 --> 01:13:45.000
restrictions some windows that we need to work within to protect our local

01:13:45.000 --> 01:13:49.000
aquatic organisms and those are set by DNR

01:13:49.000 --> 01:13:53.000
and then there are also some things that are up in the

01:13:53.000 --> 01:13:57.000
air so traditional stream restoration phasing starts

01:13:57.000 --> 01:14:01.000
upstream and works downstream so you can see phase one starts at Burtwood

01:14:01.000 --> 01:14:05.000
Hills and works our way down to the south

01:14:05.000 --> 01:14:09.000
or downstream end of Hales trail phase

01:14:09.000 --> 01:14:13.000
two or that was phase one phase two A is

01:14:13.000 --> 01:14:17.000
downstream of Hales trail all the way to the upstream end

01:14:17.000 --> 01:14:21.000
of Lake Street and then phase two B would be the upstream end

01:14:21.000 --> 01:14:25.000
of Lake Street all the way to Lake Michigan and

01:14:25.000 --> 01:14:29.000
there is a chance down the line that two A and two B could be combined

01:14:29.000 --> 01:14:33.000
given the right construction windows and funding

01:14:33.000 --> 01:14:37.000
availability next slide please here's an example of

01:14:37.000 --> 01:14:41.000
what one of what our phase one might look like this is

01:14:41.000 --> 01:14:45.000
only well-defined for phase one because we're closer to that than

01:14:45.000 --> 01:14:49.000
phase two phase two phases

01:14:49.000 --> 01:14:53.000
so if ideally if we have funded

01:14:53.000 --> 01:14:57.000
funding awarded for phase one we've been start in quarter one

01:14:57.000 --> 01:15:01.000
of 2027 so already early next year with mobilization and clearing

01:15:01.000 --> 01:15:05.000
construction would occur during the summer months we have a

01:15:05.000 --> 01:15:09.000
fishing fish timeout window that we need to

01:15:09.000 --> 01:15:13.000
where we need to stay out of the creek from March to June essentially to allow for

01:15:13.000 --> 01:15:17.000
any resident fish spawning even though the Lake Michigan fish aren't getting

01:15:17.000 --> 01:15:21.000
up this far we still need to protect the resident

01:15:21.000 --> 01:15:25.000
aquatic organisms and then we would construct most of this

01:15:25.000 --> 01:15:29.000
in-stream work from there through the winter months and wrap

01:15:29.000 --> 01:15:33.000
up phase one in Q4 of 2028

01:15:33.000 --> 01:15:37.000
these are the so the budget that we just

01:15:37.000 --> 01:15:41.000
submitted with our most recent application to NIFWIF

01:15:41.000 --> 01:15:45.000
for the National Coastal Resiliency Fund is

01:15:45.000 --> 01:15:49.000
approximately seven and a half million dollars

01:15:49.000 --> 01:15:53.000
do it probably makes sense not to break it down at this point Bob

01:15:53.000 --> 01:15:57.000
for sure on time unless those questions

01:15:57.000 --> 01:16:01.000
phase two is a very similar number

01:16:01.000 --> 01:16:05.000
we didn't plan this but that's it worked out well

01:16:05.000 --> 01:16:09.000
we do intend if we're successful with the NIFWIF grant

01:16:09.000 --> 01:16:13.000
this year we intend to reapply next year for a similar amount so this would work out well

01:16:13.000 --> 01:16:17.000
for budgeting purposes and here we'll have a more restricted

01:16:17.000 --> 01:16:21.000
fish window because we'll have to work within a three-month

01:16:21.000 --> 01:16:25.000
period in the section between the downstream end of Hills trailing

01:16:25.000 --> 01:16:29.000
upstream end of Lake Street you'll see Gunther Pond is

01:16:29.000 --> 01:16:33.000
highlighted here we have some unknowns related to this wetland restoration

01:16:33.000 --> 01:16:37.000
only because there's a new sewer alignment

01:16:37.000 --> 01:16:41.000
being proposed to this area so we're waiting on that final decision

01:16:41.000 --> 01:16:45.000
and then in phase two B totals

01:16:45.000 --> 01:16:49.000
two and a half million and this includes

01:16:49.000 --> 01:16:53.000
full daylighting of Lake Street maintaining the bridge across

01:16:53.000 --> 01:16:57.000
that area for vehicle and pedestrian use

01:16:57.000 --> 01:17:01.000
and then also a bridge at the mouth of Lake Michigan to enable

01:17:01.000 --> 01:17:05.000
emergency services when Lake Street is closed off

01:17:05.000 --> 01:17:09.000
and also pedestrian and then

01:17:09.000 --> 01:17:13.000
grand total of all phases includes a 20% contingency

01:17:13.000 --> 01:17:17.000
for construction but we're at about 17

01:17:17.000 --> 01:17:21.000
as you can see Rob I think went through some of the funding that was secured

01:17:21.000 --> 01:17:25.000
for design we're wrapping that up

01:17:25.000 --> 01:17:29.000
in the next couple of months here for phase one of construction we're

01:17:29.000 --> 01:17:33.000
looking at utilizing a portion of a vantage

01:17:33.000 --> 01:17:37.000
donation to LNP in addition to the National Coastal Resiliency Fund

01:17:37.000 --> 01:17:41.000
which is the application I referred to earlier for

01:17:41.000 --> 01:17:45.000
3.8 million dollars we also have a DNR

01:17:45.000 --> 01:17:49.000
targeted runoff management grant which will be focused on our stormwater green infrastructure

01:17:49.000 --> 01:17:53.000
improvements along the corridor and then a portion of the

01:17:53.000 --> 01:17:57.000
TID 5 have approved the 2.1 million

01:17:57.000 --> 01:18:01.000
and continued

01:18:01.000 --> 01:18:05.000
we would be working toward phase one and phase two additional with the additional

01:18:05.000 --> 01:18:09.000
donation from Vantage we have some trails funding

01:18:09.000 --> 01:18:13.000
that's an application has been submitted to support some of the bridge work and

01:18:13.000 --> 01:18:17.000
revitalization of the mountain bike trails through the corridor

01:18:17.000 --> 01:18:21.000
we have some stay in our Great Lakes funding for Walter Street ravine

01:18:21.000 --> 01:18:25.000
conditionally approved and I believe

01:18:25.000 --> 01:18:29.000
there would be a second round of NIFWIF applications for another five million

01:18:29.000 --> 01:18:33.000
some congressional allocations potentially

01:18:33.000 --> 01:18:37.000
and then the TID 5 kind of

01:18:37.000 --> 01:18:41.000
proximal to this but separate we have another project that we've assisted

01:18:41.000 --> 01:18:45.000
with applying for grant funds for up at Upper Lake Park

01:18:45.000 --> 01:18:49.000
to do a by a retention basin project to help restore water that is

01:18:49.000 --> 01:18:53.000
currently discharging into the Valley Creek corridor so that you can see there's separate funds

01:18:53.000 --> 01:18:57.000
listed here that have been awarded and applied for

01:18:57.000 --> 01:19:01.000
that.

01:19:01.000 --> 01:19:05.000
Are there any questions?

01:19:05.000 --> 01:19:09.000
No.

01:19:09.000 --> 01:19:13.000
Thank you. Are you looking for

01:19:13.000 --> 01:19:17.000
approval on this item as a whole you're looking for just some discussion on the walls

01:19:17.000 --> 01:19:21.000
with the culverts first?

01:19:21.000 --> 01:19:25.000
I guess you know the more the more important thing

01:19:25.000 --> 01:19:29.000
at this point I think is I you know I would like some direction

01:19:29.000 --> 01:19:33.000
from the board to as an approval of whether or not

01:19:33.000 --> 01:19:37.000
this is the direction they like to see this project going

01:19:37.000 --> 01:19:41.000
this of course does not commit us to anything does not commit us to

01:19:41.000 --> 01:19:45.000
accepting the grant this is not for

01:19:45.000 --> 01:19:49.000
a formal approval of any construction or

01:19:49.000 --> 01:19:53.000
anything but just I guess what I'm saying is if there are any

01:19:53.000 --> 01:19:57.000
major issues major concerns with this board over the direction

01:19:57.000 --> 01:20:01.000
of this project I would ask the

01:20:01.000 --> 01:20:05.000
you to let me know that otherwise

01:20:05.000 --> 01:20:09.000
if it seems like this project is on the right track

01:20:09.000 --> 01:20:13.000
I was hoping for a vote to approve of the

01:20:13.000 --> 01:20:17.000
again of the direction we're going with funding

01:20:17.000 --> 01:20:21.000
grant requests and

01:20:21.000 --> 01:20:25.000
the same line.

01:20:25.000 --> 01:20:29.000
I'll make the motion to

01:20:29.000 --> 01:20:33.000
I just want to say thank you that it's a really good summary for somebody who's kind of new to what's going on there so

01:20:33.000 --> 01:20:37.000
I appreciate you putting this together. Thank you.

01:20:37.000 --> 01:20:41.000
Excuse me I'd also like to say that I'm super excited about the project

01:20:41.000 --> 01:20:45.000
and I think you guys are doing a great job.

01:20:45.000 --> 01:20:49.000
All right.

01:20:49.000 --> 01:20:53.000
Any other comments or questions? No but I'll make my motion. Ready for your motion.

01:20:53.000 --> 01:20:57.000
I move to approve the proposed phasing cost estimates for the Valley Creek project.

01:20:57.000 --> 01:21:01.000
All right we have a motion by Alderman Miller is there a second? I'll second.

01:21:01.000 --> 01:21:05.000
Second by Mr. Schudendorf.

01:21:05.000 --> 01:21:09.000
Any questions on the motion? Seeing none all those in favor say aye.

01:21:09.000 --> 01:21:13.000
Aye. Opposed? Motion carries.

01:21:13.000 --> 01:21:17.000
All right that brings us to item nine

01:21:17.000 --> 01:21:21.000
consideration and possible action on the draft 10 year capital improvement plan

01:21:21.000 --> 01:21:25.000
2027 to 2036.

01:21:25.000 --> 01:21:29.000
Okay are we going to what you want to discuss the

01:21:29.000 --> 01:21:33.000
well we can I do we need to

01:21:33.000 --> 01:21:37.000
I don't think we have enough you know in five minutes I don't think well it's time to go over the capital improvement

01:21:37.000 --> 01:21:41.000
plan. Do you need a quorum? Yes we do need a quorum

01:21:41.000 --> 01:21:45.000
so stick it on. Are you sure?

01:21:45.000 --> 01:21:51.000
Okay well then oh okay yeah sure sure okay

01:21:51.000 --> 01:21:55.000
if you're under a time crunch we can

01:21:55.000 --> 01:21:59.000
if you would like a more prolonged

01:21:59.000 --> 01:22:05.000
discussion on the CIP we could schedule that either for

01:22:05.000 --> 01:22:11.000
if it was going to be this week it would be Friday if it was going to be next week

01:22:11.000 --> 01:22:15.000
and it would be it would need to be Monday.

01:22:15.000 --> 01:22:19.000
All right if

01:22:19.000 --> 01:22:23.000
righty doesn't that work?

01:22:23.000 --> 01:22:27.000
Okay that leaves Monday

01:22:27.000 --> 01:22:31.000
Okay

01:22:31.000 --> 01:22:35.000
I'm on the plug and I will double check

01:22:35.000 --> 01:22:39.000
yeah I don't yeah you can do Monday night that's

01:22:39.000 --> 01:22:43.000
okay with everybody

01:22:43.000 --> 01:22:47.000
yeah let me go ahead double check

01:22:47.000 --> 01:22:51.000
five regular 5.30 yeah let me quick double check the calendar

01:22:51.000 --> 01:22:55.000
this room is not available Monday night oh it's

01:22:55.000 --> 01:22:59.000
no be harbor commission meeting students got training okay

01:22:59.000 --> 01:23:03.000
oh okay um we're we're going to be in the

01:23:03.000 --> 01:23:07.000
city hall lower level at our next meeting is that available?

01:23:07.000 --> 01:23:11.000
It should be

01:23:11.000 --> 01:23:15.000
is this a meeting that

01:23:15.000 --> 01:23:19.000
has to be recorded under and do we

01:23:19.000 --> 01:23:23.000
have the facility downstairs? This has to be recorded by ordinance

01:23:23.000 --> 01:23:27.000
well then we can't

01:23:27.000 --> 01:23:31.000
meet downstairs on August 11th. Are

01:23:31.000 --> 01:23:35.000
we allowed to use the old fashioned like tape recorder or is a TV

01:23:35.000 --> 01:23:39.000
recording?

01:23:39.000 --> 01:23:43.000
Okay

01:23:43.000 --> 01:23:47.000
Okay

01:23:51.000 --> 01:23:55.000
Okay I was told to move the meeting

01:23:55.000 --> 01:23:59.000
downstairs to the 11th. Okay

01:23:59.000 --> 01:24:03.000
well stay tuned we will let you

01:24:03.000 --> 01:24:07.000
know what we determined but we know that you are available

01:24:07.000 --> 01:24:11.000
on the 11th or I'm sorry on Monday rather so

01:24:11.000 --> 01:24:15.000
yes

01:24:15.000 --> 01:24:19.000
All right do we need a motion then the two postpone

01:24:19.000 --> 01:24:23.000
items 9 10 and 11 to the next meeting?

01:24:23.000 --> 01:24:27.000
Sure.

01:24:27.000 --> 01:24:31.000
We need a motion to postpone items 9 through

01:24:31.000 --> 01:24:35.000
15 until

01:24:35.000 --> 01:24:39.000
let's keep 14 at least because

01:24:39.000 --> 01:24:43.000
9 through 13

01:24:43.000 --> 01:24:47.000
9 through 13 until

01:24:47.000 --> 01:24:51.000
July 29th

01:24:51.000 --> 01:24:55.000
can we say a time to be determined

01:24:55.000 --> 01:24:59.000
I think so. And location to be determined but that will be the date

01:24:59.000 --> 01:25:03.000
All right so the motion is

01:25:03.000 --> 01:25:07.000
postponed items 9 through 12 until July 27th

01:25:07.000 --> 01:25:11.000
or a time to be determined and a location to be determined

01:25:11.000 --> 01:25:15.000
All right is there a second? Second. Second by

01:25:15.000 --> 01:25:19.000
Alderman Beaster. All those in favor say aye. Aye. Opposed?

01:25:19.000 --> 01:25:23.000
All right that brings us to item 14 public comments and appearances

01:25:23.000 --> 01:25:27.000
Are there any public comments and appearances? Seeing none

01:25:27.000 --> 01:25:31.000
that will bring us to that will bring you can

01:25:31.000 --> 01:25:35.000
stand up and you can make a public comment or you can wait till the meeting is over

01:25:35.000 --> 01:25:39.000
Please give your name and address and fill out the

01:25:39.000 --> 01:25:43.000
form for the Amber Chain

01:25:43.000 --> 01:25:47.000
CHE and E address 1446 West 2nd Avenue

01:25:47.000 --> 01:25:51.000
I was just wondering since the data center

01:25:51.000 --> 01:25:55.000
is literally consuming of 2.5 square footage and

01:25:55.000 --> 01:25:59.000
672 acres did we let the county know

01:25:59.000 --> 01:26:03.000
and take a vote did the people get a vote on if they were okay

01:26:03.000 --> 01:26:07.000
with this being in their city

01:26:07.000 --> 01:26:11.000
We can't answer any of your questions because it would have to be properly noticed

01:26:11.000 --> 01:26:15.000
otherwise we'd be violating open meetings laws

01:26:15.000 --> 01:26:19.000
and also

01:26:19.000 --> 01:26:23.000
I read that the vantage data center did not

01:26:23.000 --> 01:26:27.000
release a ESI environmental impact statement

01:26:27.000 --> 01:26:31.000
Are we going to have them release that

01:26:31.000 --> 01:26:35.000
and then also

01:26:35.000 --> 01:26:39.000
like how much did you guys get to sell your souls

01:26:39.000 --> 01:26:43.000
That's all. All right are there any additional

01:26:43.000 --> 01:26:47.000
public comments or appearances? Seeing none

01:26:47.000 --> 01:26:51.000
I'll move to item 15. Our next schedule meeting is August 11th

01:26:51.000 --> 01:26:55.000
in the lower level conference room potentially

01:26:55.000 --> 01:26:59.000
pending whatever. I will entertain

01:26:59.000 --> 01:27:01.000
a motion to adjourn. Motion

01:27:01.000 --> 01:27:05.000
to adjourn. Motion by older woman Miller is there a second?

01:27:05.000 --> 01:27:09.000
Second by mr. Sundorff. All those in favor say aye.

01:27:09.000 --> 01:27:11.000
Aye.
